# Regulus search export

- Query: `39 FR 45246`
- Source type: All
- Part: All
- Source: All
- Status: All
- Jurisdiction: All
- Collection: All
- Incident class: All
- Sort: relevance
- Date from: Any
- Date to: Any
- As of: Current corpus
- Results: 6
- Exported: 2026-08-23T19:04:43.428Z

## 1. General requirements.

**Citation:** 49 CFR 178.352-1  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2003-10-01 / Not stated

\[Amdt. 178-35, 39 FR 45246. Dec. 31, 1974. Redesignated by Amdt. 178-97, 55 FR 52716, Dec. 21, 1990\]

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2003-title49-vol2/CFR-2003-title49-vol2-sec178-352-1>
- Source ID: `govinfo-cfr`
- SHA-256: `3299ca1ec641bf7f6ddb0516e4f023feb2c9d6d6bdbac122856de18dd4749e47`
- Retrieved: 2026-08-13T06:37:29.399Z
- Document slug: `49-cfr-178-352-1`
- Related records: 0

## 2. Rated capacity.

**Citation:** 49 CFR 178.352-2  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2003-10-01 / Not stated

(a) Rated capacity as marked (see § 178.352-6). Not less than 55 gallons nor more than 110 gallons for the outer steel drum. Not more than 17.74 L for the inner vessel. (b) The authorized maximum gross weight of the package is 160 kg (350 pounds) for sizes not over 210 L (55 gallons) or 220 kg (480

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2003-title49-vol2/CFR-2003-title49-vol2-sec178-352-2>
- Source ID: `govinfo-cfr`
- SHA-256: `a602fcb6fd8f62d1be91368852e3f39b036975db9c8bf5f54db64534d3268efb`
- Retrieved: 2026-08-13T06:37:29.399Z
- Document slug: `49-cfr-178-352-2`
- Related records: 0

## 3. Welding.

**Citation:** 49 CFR 178.352-4  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2003-10-01 / Not stated

Welding must be of material having a melting point in excess of 800 °C (1475 °F) (except that for packages constructed prior to March 31, 1975, this temperature may be 540 °C (1000 °F)), with a joint efficiency of at least 0.85. This requirement applies to welding used in adding spacer rods to compl

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2003-title49-vol2/CFR-2003-title49-vol2-sec178-352-4>
- Source ID: `govinfo-cfr`
- SHA-256: `e1e47656640e94f4d98772dcbe77fd8d6e0959df490bffda4a56825f8c88ed5f`
- Retrieved: 2026-08-13T06:37:29.399Z
- Document slug: `49-cfr-178-352-4`
- Related records: 0

## 4. Closure.

**Citation:** 49 CFR 178.352-5  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2003-10-01 / Not stated

(a) The outer drum closure must be at least a 12-gauge bolted ring with drop forged lugs, one of which is threaded, and having at least a 1.6 centimeter (5/8-inch) diameter steel bolt and a lock nut, or equivalent device. (b) The closure device must have a means for the attachment of a tamper-proof

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2003-title49-vol2/CFR-2003-title49-vol2-sec178-352-5>
- Source ID: `govinfo-cfr`
- SHA-256: `20fcaf559b7dda59b16bbd624a1d3f497c3b212382d1dbd82f1ed697c11b13bd`
- Retrieved: 2026-08-13T06:37:29.399Z
- Document slug: `49-cfr-178-352-5`
- Related records: 0

## 5. General construction requirements.

**Citation:** 49 CFR 178.354-3  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2003-10-01 / Not stated

(a) The outer shell must be of straight-sided steel, with welded body seams, and may be either a single sheet of steel, or may be fabricated by welding together two appropriate lengths of drums with each length to contain 3 swedged or rolled rolling hoops as prescribed for either of these specificat

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2003-title49-vol2/CFR-2003-title49-vol2-sec178-354-3>
- Source ID: `govinfo-cfr`
- SHA-256: `990afd363036840076321af3e55c28396e632054e008104fecd083a3dc5ce6e2`
- Retrieved: 2026-08-13T06:37:29.399Z
- Document slug: `49-cfr-178-354-3`
- Related records: 0

## 6. General construction requirements.

**Citation:** 49 CFR 178.352-3  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2003-10-01 / Not stated

(a) The outer shell must be of straight sided steel, with welded body seams and at least 18-gauge body and bottom head sheets, and 14-gauge removable head sheets (unless there are one or more corrugations in the cover near the periphery, in which case 16-gauge is authorized). The shell may be either

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2003-title49-vol2/CFR-2003-title49-vol2-sec178-352-3>
- Source ID: `govinfo-cfr`
- SHA-256: `a354b9a45c94647d48031d570d0c403efa5d6351f294c5bdbf982e6a8d558e73`
- Retrieved: 2026-08-13T06:37:29.399Z
- Document slug: `49-cfr-178-352-3`
- Related records: 0
