# Regulus search export

- Query: `67 FR 61016`
- Source type: All
- Part: All
- Source: All
- Status: All
- Jurisdiction: All
- Collection: All
- Incident class: All
- Sort: relevance
- Date from: Any
- Date to: Any
- As of: Current corpus
- Results: 4
- Exported: 2026-08-25T15:19:24.705Z

## 1. Tests.

**Citation:** 49 CFR 178.356-3  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2013-10-01 / Not stated

(a) Leakage test—Each inner liner assembly must be tested for leakage prior to installation. Seam welds of the liner must be covered for a distance of at least 15 cm (6 inches) on either side of the seam with soapsuds, heavy oil, or equivalent material, and interior air pressure applied to at least 

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2013-title49-vol3/CFR-2013-title49-vol3-sec178-356-3>
- Source ID: `govinfo-cfr`
- SHA-256: `0778750a1f28dbf344af19c3d15adf1a1353c8ac71573e309847df20ed611e45`
- Retrieved: 2026-08-12T01:41:52.959Z
- Document slug: `49-cfr-178-356-3`
- Related records: 0

## 2. General requirements.

**Citation:** 49 CFR 178.362-1  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2003-10-01 / Not stated

(a) Each jacket must meet the applicable requirements of § 173.24 of this subchapter. (b) Maximum gross weight of the jacket plus the contents may not exceed the following: (1) Specification 20WC-1: 225 kg (500 pounds). (2) Specification 20WC-2: 225 kg (500 pounds). (3) Specification 20WC-3: 455

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2003-title49-vol2/CFR-2003-title49-vol2-sec178-362-1>
- Source ID: `govinfo-cfr`
- SHA-256: `738b93b15714590b2d3e7aeaa586b7b6c2757bfab7272d0bc86b47f4498cbbd3`
- Retrieved: 2026-08-13T06:37:29.399Z
- Document slug: `49-cfr-178-362-1`
- Related records: 0

## 3. General construction requirements.

**Citation:** 49 CFR 178.354-3  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2003-10-01 / Not stated

(a) The outer shell must be of straight-sided steel, with welded body seams, and may be either a single sheet of steel, or may be fabricated by welding together two appropriate lengths of drums with each length to contain 3 swedged or rolled rolling hoops as prescribed for either of these specificat

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2003-title49-vol2/CFR-2003-title49-vol2-sec178-354-3>
- Source ID: `govinfo-cfr`
- SHA-256: `990afd363036840076321af3e55c28396e632054e008104fecd083a3dc5ce6e2`
- Retrieved: 2026-08-13T06:37:29.399Z
- Document slug: `49-cfr-178-354-3`
- Related records: 0

## 4. Pressure and vacuum relief devices.

**Citation:** 49 CFR 178.270-11  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective / published:** 2005-10-01 / Not stated

(a) Relief devices required. Each portable tank, or each independent compartment of a portable tank, must be fitted with pressure relief devices in accordance with the following: (1) Each portable tank, or each independent compartment of a portable tank, with a capacity of more than 1893 L (500 gal

### Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-2005-title49-vol2/CFR-2005-title49-vol2-sec178-270-11>
- Source ID: `govinfo-cfr`
- SHA-256: `b28e5764462d24f32b62fa34ac2916b84c3c66da33efa04ec0ff04a2a877c1e7`
- Retrieved: 2026-08-13T06:37:34.028Z
- Document slug: `49-cfr-178-270-11`
- Related records: 0
