# Scope.

**Citation:** 49 CFR 190.401  
**Type / status:** regulation / current  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2026-08-18  
**Published:** Not stated

If PHMSA conducts a facility design and/or construction safety review or inspection in connection with a proposal to construct, expand, or operate a gas, hazardous liquid or carbon dioxide pipeline facility, or a liquefied natural gas facility that meets the applicability requirements in § 190.403, 

## Document text

If PHMSA conducts a facility design and/or construction safety review or inspection in connection with a proposal to construct, expand, or operate a gas, hazardous liquid or carbon dioxide pipeline facility, or a liquefied natural gas facility that meets the applicability requirements in § 190.403, PHMSA may require the applicant proposing the project to pay the costs incurred by PHMSA relating to such review, including the cost of design and construction safety reviews or inspections.

## Provenance

- Official: Yes
- Source: <https://www.ecfr.gov/on/2026-08-18/title-49/section-190.401>
- Source ID: `ecfr`
- SHA-256: `d56ce1602a7a33192a6d9da794bd610cdb45d5930b5f344e60e7fb270f818cc5`
- Retrieved: 2026-08-20T05:54:22.614Z
- Exported: 2026-08-22T07:34:27.995Z
- Document slug: `49-cfr-190-401`

### Source metadata

```json
{
  "cfrTitle": 49,
  "part": "190",
  "section": "190.401",
  "subpart": "Subpart E—Cost Recovery for Design Reviews",
  "corpusVersion": "2026-08-18",
  "jurisdiction": "US"
}
```