# Storage and handling of plastic pipe and associated components.

**Citation:** 49 CFR 192.69  
**Type / status:** regulation / current  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 2026-08-18  
**Published:** Not stated

Each operator must have and follow written procedures for the storage and handling of plastic pipe and associated components that meet the applicable listed specifications.

[83 FR 58716, Nov. 20, 2018. Redesignated by Amdt. 192-125, 84 FR 52244, Oct. 1, 2019]

## Document text

Each operator must have and follow written procedures for the storage and handling of plastic pipe and associated components that meet the applicable listed specifications.

[83 FR 58716, Nov. 20, 2018. Redesignated by Amdt. 192-125, 84 FR 52244, Oct. 1, 2019]

## Provenance

- Official: Yes
- Source: <https://www.ecfr.gov/on/2026-08-18/title-49/section-192.69>
- Source ID: `ecfr`
- SHA-256: `3d3033e3f02c81de91666d44d0e055b2319bf211f0bd529d374f5da08b7dd071`
- Retrieved: 2026-08-20T05:54:34.435Z
- Exported: 2026-08-23T00:45:23.828Z
- Document slug: `49-cfr-192-69`

### Source metadata

```json
{
  "cfrTitle": 49,
  "part": "192",
  "section": "192.69",
  "subpart": "Subpart B—Materials",
  "corpusVersion": "2026-08-18",
  "jurisdiction": "US"
}
```
