# Extreme temperatures: normal operations.

**Citation:** 49 CFR 193.2105  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 1999-10-01  
**Published:** Not stated

Each operator shall—

(a) Determine the range of temperatures to which components will be subjected during normal operations, including required testing, initial startup, cooldown operations, and shutdown conditions; and

(b) Use component materials that meet the design standards of this part for st

## Document text

Each operator shall—

(a) Determine the range of temperatures to which components will be subjected during normal operations, including required testing, initial startup, cooldown operations, and shutdown conditions; and

(b) Use component materials that meet the design standards of this part for strength, ductility, and other properties throughout the entire range of temperatures to which the component will be subjected in normal operations.

## Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-1999-title49-vol3/CFR-1999-title49-vol3-sec193-2105>
- Source ID: `govinfo-cfr`
- SHA-256: `24c1c2878bfab24a925ea7bd0f9fb0e578c31d49842dc0df22628d1364f48c09`
- Retrieved: 2026-08-12T01:41:23.231Z
- Exported: 2026-08-22T07:39:26.392Z
- Document slug: `49-cfr-193-2105`

### Source metadata

```json
{
  "part": "193",
  "section": "193.2105",
  "subpart": "Subpart C—Design",
  "annualEdition": 1999,
  "revisedAsOf": "1999-10-01",
  "govInfoPackage": "CFR-1999-title49-vol3",
  "legalStatus": "official-annual-cfr-edition",
  "effectiveDateNote": null,
  "historicalAnchor": true,
  "historicalAnchorNote": "The section appears in an official annual CFR edition but is absent from the connected current eCFR corpus.",
  "jurisdiction": "US"
}
```
