# Frost heave.

**Citation:** 49 CFR 193.2137  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 1999-10-01  
**Published:** Not stated

(a) Each operator shall:

(1) Determine which components and their foundations could be endangered by frost heave from ambient temperatures or operating temperatures of the component; and

(2) Provide protection against frost heave which might impair their structural integrity.

(b) For each compone

## Document text

(a) Each operator shall:

(1) Determine which components and their foundations could be endangered by frost heave from ambient temperatures or operating temperatures of the component; and

(2) Provide protection against frost heave which might impair their structural integrity.

(b) For each component and foundation determined under paragraph (a) of this section, instrumentation must be installed to warn of potential structural impairment due to frost heave, unless the operator includes in the maintenance procedures required by this part, a method and schedule of inspection that will detect changes in the elevation.

## Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-1999-title49-vol3/CFR-1999-title49-vol3-sec193-2137>
- Source ID: `govinfo-cfr`
- SHA-256: `472a39a3edcfa334c5759bb90112ea968796c64c34689ddc7d1f612f4c1774ab`
- Retrieved: 2026-08-12T01:41:23.231Z
- Exported: 2026-08-23T04:57:32.360Z
- Document slug: `49-cfr-193-2137`

### Source metadata

```json
{
  "part": "193",
  "section": "193.2137",
  "subpart": "Subpart C—Design",
  "annualEdition": 1999,
  "revisedAsOf": "1999-10-01",
  "govInfoPackage": "CFR-1999-title49-vol3",
  "legalStatus": "official-annual-cfr-edition",
  "effectiveDateNote": null,
  "historicalAnchor": true,
  "historicalAnchorNote": "The section appears in an official annual CFR edition but is absent from the connected current eCFR corpus.",
  "jurisdiction": "US"
}
```
