# Ice and snow.

**Citation:** 49 CFR 193.2139  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 1999-10-01  
**Published:** Not stated

(a) Components must be designed to support the weight of ice and snow which could normally collect or form on them.

(b) Each operator shall provide protection for components from falling ice or snow which may accumulate on structures.

(c) Valves and moving components must not become inoperative du

## Document text

(a) Components must be designed to support the weight of ice and snow which could normally collect or form on them.

(b) Each operator shall provide protection for components from falling ice or snow which may accumulate on structures.

(c) Valves and moving components must not become inoperative due to ice formation on the component.

## Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-1999-title49-vol3/CFR-1999-title49-vol3-sec193-2139>
- Source ID: `govinfo-cfr`
- SHA-256: `164df8a558b5db02090cc96e5d8d71c8d1a962711c3d00f70f9e3dca980b69d5`
- Retrieved: 2026-08-12T01:41:23.231Z
- Exported: 2026-08-24T19:37:16.247Z
- Document slug: `49-cfr-193-2139`

### Source metadata

```json
{
  "part": "193",
  "section": "193.2139",
  "subpart": "Subpart C—Design",
  "annualEdition": 1999,
  "revisedAsOf": "1999-10-01",
  "govInfoPackage": "CFR-1999-title49-vol3",
  "legalStatus": "official-annual-cfr-edition",
  "effectiveDateNote": null,
  "historicalAnchor": true,
  "historicalAnchorNote": "The section appears in an official annual CFR edition but is absent from the connected current eCFR corpus.",
  "jurisdiction": "US"
}
```
