# Procedures.

**Citation:** 49 CFR 193.2305  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 1999-10-01  
**Published:** Not stated

(a) In performing construction, installation, inspection, or testing, an operator must follow written specifications, procedures, and drawings, as appropriate, that are consistent with this part, taking into account relevant mechanical, chemical, and thermal properties, component functions, and envi

## Document text

(a) In performing construction, installation, inspection, or testing, an operator must follow written specifications, procedures, and drawings, as appropriate, that are consistent with this part, taking into account relevant mechanical, chemical, and thermal properties, component functions, and environmental effects that are involved.

(b) All procedures, including any field revisions, must be substantiated by testing or experience to produce a component that is reliable and complies with the design and installation requirements of this part.

## Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-1999-title49-vol3/CFR-1999-title49-vol3-sec193-2305>
- Source ID: `govinfo-cfr`
- SHA-256: `fbcf35ba98c6fe178e7cdb636f745f7a03a8c8b648503929cf49b3d8fc83471a`
- Retrieved: 2026-08-12T01:41:23.231Z
- Exported: 2026-08-25T01:27:52.760Z
- Document slug: `49-cfr-193-2305`

### Source metadata

```json
{
  "part": "193",
  "section": "193.2305",
  "subpart": "Subpart D—Construction",
  "annualEdition": 1999,
  "revisedAsOf": "1999-10-01",
  "govInfoPackage": "CFR-1999-title49-vol3",
  "legalStatus": "official-annual-cfr-edition",
  "effectiveDateNote": null,
  "historicalAnchor": true,
  "historicalAnchorNote": "The section appears in an official annual CFR edition but is absent from the connected current eCFR corpus.",
  "jurisdiction": "US"
}
```
