# Retesting.

**Citation:** 49 CFR 193.2317  
**Type / status:** regulation / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** 1999-10-01  
**Published:** Not stated

After testing required by this subpart is completed on a component to contain a hazardous fluid, the component must be retested whenever—

(a) Penetration welding other than tie-in welding is performed; or

(b) The structural integrity of the component is disturbed.

## Document text

After testing required by this subpart is completed on a component to contain a hazardous fluid, the component must be retested whenever—

(a) Penetration welding other than tie-in welding is performed; or

(b) The structural integrity of the component is disturbed.

## Provenance

- Official: Yes
- Source: <https://www.govinfo.gov/app/details/CFR-1999-title49-vol3/CFR-1999-title49-vol3-sec193-2317>
- Source ID: `govinfo-cfr`
- SHA-256: `4b795f04f794a17855352e31a87177ec4615c2b9b92b307a69f978f70c465ac3`
- Retrieved: 2026-08-12T01:41:23.231Z
- Exported: 2026-08-22T19:12:21.593Z
- Document slug: `49-cfr-193-2317`

### Source metadata

```json
{
  "part": "193",
  "section": "193.2317",
  "subpart": "Subpart D—Construction",
  "annualEdition": 1999,
  "revisedAsOf": "1999-10-01",
  "govInfoPackage": "CFR-1999-title49-vol3",
  "legalStatus": "official-annual-cfr-edition",
  "effectiveDateNote": null,
  "historicalAnchor": true,
  "historicalAnchorNote": "The section appears in an official annual CFR edition but is absent from the connected current eCFR corpus.",
  "jurisdiction": "US"
}
```
