# Change in Class Location: Confirmation or Revision of Maximum Allowable Operating Pressure

**Citation:** 192.611  
**Type / status:** regulation / current  
**Agency:** Arkansas Public Service Commission  
**Effective:** Not stated  
**Published:** Not stated

§ 192.611 Change in Class Location: Confirmation or Revision of Maximum Allowable Operating Pressure (a) If the hoop stress corresponding to the established maximum allowable operating pressure of a segment of pipeline is not commensurate with the present class location, and the segment is in satisf

## Document text

§ 192.611 Change in Class Location: Confirmation or Revision of Maximum Allowable Operating Pressure (a) If the hoop stress corresponding to the established maximum allowable operating pressure of a segment of pipeline is not commensurate with the present class location, and the segment is in satisfactory physical condition, the maximum allowable operating pressure of that segment of pipeline must be confirmed or revised according to one of the following requirements: (1) If the segment involved has been previously tested in place for a period of not less than 8 hours. (i) The maximum allowable operating pressure is 0.8 times the test pressure in Class 2 locations, 0.667 times the test pressure in Class 3 locations, or 0.555 times the test pressure in Class 4 locations. The corresponding hoop stress may not exceed 72 percent of the SMYS of the pipe in Class 2 locations, 60 percent of SMYS in Class 3 locations, or 50 percent of SMYS in Class 4 locations. (ii) The alternative maximum allowable operating pressure is 0.8 times the test pressure in Class 2 locations and 0.667 times the test pressure in Class 3 locations. For pipelines operating at alternative maximum allowable pressure per § 192.620, the corresponding hoop stress may not exceed 80 percent of the SMYS of the pipe in Class 2 locations and 67 percent of the SMYS in Class 3 locations. (2) The maximum allowable operating pressure of the segment involved must be reduced so that the corresponding hoop stress is not more than that allowed by this part for new segments of pipelines in the existing class location. (3) The segment involved must be tested in accordance with the applicable requirements of Subpart J of this part, and its maximum allowable operating pressure must then be established according to the following criteria: (i) The maximum allowable operating pressure after the requalification test is 0.8 times the test pressure for Class 4 locations. (ii) The corresponding hoop stress may not exceed 72 percent of the SMYS of the pipe in Class 2 locations, 60 percent of SMYS in Class 3 locations, or 50 percent of SMYS in Class 4 locations. (iii) For pipeline operating at an alternative maximum allowable operating pressure per § 192.620, the alternative maximum allowable operating pressure after the requalification test is 0.8 times the test pressure for Class 2 locations and 0.667 times the test pressure for Class 3 locations. The corresponding hoop stress may not exceed 80 percent of the SMYS of the pipe in Class 2 locations and 67 percent of SMYS in Class 3 locations. (b) The maximum allowable operating pressure confirmed or revised in accordance with this section, may not exceed the maximum allowable operating pressure established before the confirmation or revision. (c) Confirmation or revision of the maximum allowable operating pressure of a segment of pipeline in accordance with this section does not preclude the application of §§ 192.553 and 192.555. (d) Confirmation or revision of the maximum allowable operating pressure that is required as a result of a study under § 192.609 must be completed within 24 months of the change in class location. Pressure reduction under paragraph (a) (1) or (2) of this section within the 24- month period does not preclude establishing a maximum allowable operating pressure under paragraph (a)(3) of this section at a later date.

## Provenance

- Official: Yes
- Source: <https://codeofarrules.arkansas.gov/Rules/Rule?chapterID=40&levelType=part&partID=1394&subChapterID=392&titleID=23>
- Source ID: `ar-car-pipeline-safety`
- SHA-256: `bb0d24a7c6137b13c7895eeac3c0fa324f6071c66b185417b21807ea2507072e`
- Retrieved: 2026-08-12T08:10:37.612Z
- Exported: 2026-08-24T14:46:22.493Z
- Document slug: `ar-car-23-500-192-611`

### Source metadata

```json
{
  "jurisdiction": "US-AR",
  "subject": "intrastate-gas",
  "caveats": {
    "exactScope": "The searchable corpus contains every current numbered section, the code-wide definitions, and every operative appendix in official 23 CAR Part 500, plus direct pipeline rules 15 CAR sections 275-406 and 275-504. Reserved and removed provisions are inventory-only.",
    "excludedScope": "This is not all Arkansas pipeline law. Standalone statutes, dockets and orders, one-call law, utility rates and service, siting, environmental permits, highway crossings, local law, forms, and incorporated third-party standards are excluded. Other current AOGC gas and transportation rules are inventoried as adjacent production, conservation, storage, or fluid-transport material.",
    "applicabilityCaveat": "APSC administers certified intrastate gas safety downstream of producer custody transfer. AOGC section 275-406 separately reaches specified producer or producer-affiliated natural-gas systems. AOGC section 275-504 imposes state permitting and operational duties on specified hazardous-liquid pipelines, but PHMSA states that it directly inspects and enforces intrastate hazardous-liquid pipeline safety in Arkansas. Inclusion does not establish applicability to a particular facility.",
    "incorporationCaveat": "AOGC sections 275-406 and 275-504 use dynamic 'as amended' wording for federal Parts 190, 191, 192, 195, and 199. Part 500 is a state code that reproduces and modifies federal-derived gas provisions. References and relationship records do not substitute a retrieval-date federal text or decide the legal effect of incorporation.",
    "publicationCaveat": "The Code of Arkansas Rules identifies its online database as the official version, effective as a publication system January 1, 2025, updated weekly, and potentially behind recent agency rulemaking. The official Part 500 page reports Ark. R. 2026-6 effective January 8, 2026; its PDF is headed August 22, 2025 and Docket 25-025-R. Retrieval and site-update dates are publication observations, not inferred legal effective dates for every section.",
    "rights": "Official Arkansas and federal government artifacts are archived with attribution and SHA-256 provenance. Public access does not settle rights in seals, site presentation, forms, incorporated standards, or third-party material; downstream redistribution requires separate review."
  },
  "rightsReviewRequired": true,
  "references": [],
  "codePart": "23 CAR pt. 500",
  "partEffectiveOn": "2026-01-08",
  "partEffectiveDateNotImputedToIndividualProvision": true,
  "federalDerivedStateCode": true,
  "sourceCollection": "ar-car-23-part-500",
  "region": "AR"
}
```