# CPUC General Order 112-F § 126 - CHANGE IN MAXIMUM ALLOWABLE OPERATING PRESSURE

**Citation:** CPUC GO 112-F § 126  
**Type / status:** regulation / current  
**Agency:** California Public Utilities Commission  
**Effective:** 2015-06-25  
**Published:** 2015-06-25

126.1 Except as provided in (126.2) below, at least 30 days prior to an increase in the maximum allowable operating pressure of a pipeline, a report shall be filed with the Commission for:

a) A pipeline operating at or to be operated at a hoop stress of 20 percent or more of the specified minimum y

## Document text

126.1 Except as provided in (126.2) below, at least 30 days prior to an increase in the maximum allowable operating pressure of a pipeline, a report shall be filed with the Commission for:

a) A pipeline operating at or to be operated at a hoop stress of 20 percent or more of the specified minimum yield strength of the pipe being up rated.

b) 2,500 feet or more of distribution main which is to be up rated from a MAOP less than or equal to 60 psig to a MAOP greater than 60 psig.

c) The conversion of 5,000 feet or more of low pressure distribution main to high pressure distribution main.

The report shall include:

the new maximum allowable operating pressure

the reasons for the change

the steps taken to determine the capability of the pipeline to withstand such an increase

126.2 The requirements of (126.1) above do not apply to the up rating or conversion of low pressure distribution mains serving less than 300 customers accomplished by connecting the service lines individually to a higher pressure main.

## Provenance

- Official: Yes
- Source: <https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M163/K327/163327660.PDF>
- Source ID: `ca-cpuc-go-112-f`
- SHA-256: `766ed150db4404ceecac997c0d131d400b8c5d78907a6923853ad6f88dca6faf`
- Retrieved: 2026-08-20T06:57:47.831Z
- Exported: 2026-08-26T02:26:57.558Z
- Document slug: `ca-cpuc-go-112-f-126`

### Source metadata

```json
{
  "jurisdiction": "US-CA",
  "corpus": "CPUC General Order 112-F",
  "unit": "126",
  "subpart": "SUBPART B REPORTS",
  "legalScope": "State gas-pipeline safety rules governing design, construction, testing, operation, and maintenance of covered gas gathering, transmission, distribution, LNG, gas-holder, and petroleum-gas vessel-station facilities, plus reporting and whistleblower requirements.",
  "applicabilityCaveat": "General Order 112-F applies according to its own definitions and the California Public Utilities Commission's jurisdiction, including covered natural-gas transmission and distribution systems, master-meter systems, and covered LPG distribution systems. It supplements rather than supersedes applicable federal pipeline-safety requirements in 49 CFR Parts 191, 192, 193, and 199; current federal text, Commission waivers, later decisions, and operator-specific facts must also be checked.",
  "rightsCaveat": "The CPUC makes these official publications publicly accessible without authentication, but the CPUC website displays a State of California copyright notice and no source-specific open-data or redistribution license was identified. Preserve official attribution and source links, and assess California website terms before commercial redistribution.",
  "federalIncorporation": "GO 112-F § 104.1 states an intent to automatically incorporate revisions to 49 CFR Parts 191, 192, 193, and 199 on their Federal Register effective dates; users must consult current federal text.",
  "currentDisposition": "Current within the scoped official GO 112-F corpus, subject to later CPUC actions, waivers, and incorporated federal revisions.",
  "historicalThrough": null,
  "modifyingDecision": null,
  "provenance": {
    "goPdfSha256": "e28c8201eb0ab7a27bb4c5b683e9fc213b1d2b7acf45a9285077ed1141c60cfe",
    "goDocxSha256": "d9aab9a221ae198569ed35183071371cfa3a4cf7111a3c644186227fc62124e5",
    "decisionPdfSha256": "bab09e4ec810ad488f1a48aa1ffe191d1ccf3eafe948ee0710a82c079ab5b6cc",
    "decisionDocxSha256": "1ed11eb2e7fe18f02b85dd33d3ea3987a4772798b460104bfce51be9010bbdd5",
    "goPdfEtag": "\"6eaba5a6cc54d21:0\"",
    "goPdfLastModified": "Mon, 12 Dec 2016 23:08:29 GMT",
    "goDocxEtag": "\"5afecc0ca54d21:0\"",
    "goDocxLastModified": "Mon, 12 Dec 2016 22:54:52 GMT",
    "decisionPdfEtag": "\"aeafbca22eeed31:0\"",
    "decisionPdfLastModified": "Thu, 17 May 2018 22:30:19 GMT",
    "decisionDocxEtag": "\"f4be28d82deed31:0\"",
    "decisionDocxLastModified": "Thu, 17 May 2018 22:24:39 GMT",
    "artifactPaths": {
      "landing": "data/sources/california/cpuc-pipeline-rules.html",
      "goPdf": "data/sources/california/cpuc-general-order-112-f.pdf",
      "goDocx": "data/sources/california/cpuc-general-order-112-f.docx",
      "decisionPdf": "data/sources/california/cpuc-decision-18-05-008.pdf",
      "decisionDocx": "data/sources/california/cpuc-decision-18-05-008.docx"
    }
  },
  "region": "CA"
}
```
