(a) Each utility shall implement and maintain its DSM plan and G-DSMCA, as approved by the Commission. (b) Each utility shall submit its annual DSM report on or before April 1 of each year. (c) Each utility seeking a G-DSM bonus shall include the bonus amount and its calculation in its annual advice

## Document text

(a) Each utility shall implement and maintain its DSM plan and G-DSMCA, as
approved by the Commission.
(b) Each utility shall submit its annual DSM report on or before April 1 of each year.
(c) Each utility seeking a G-DSM bonus shall include the bonus amount and its
calculation in its annual advice letter filing adjusting the G-DSMCA consistent
with paragraph 4752(d).
(d) Each utility shall file an advice letter on or before May 31 of each year to adjust
the G-DSMCA to be effective July 1 for a period of 12 months.

(e) By July 1 of the final year of the currently effective DSM plan, each utility shall file
by application a prospective gas DSM plan for Commission approval.
(f) Commencing in 2022, and no less frequently than every four years thereafter,
each utility shall file an application to open a DSM strategic issues proceeding,
consistent with § 40-3.2-103(1), C.R.S., and in accordance with rule 4761.

## Provenance

- Official: Yes
- Source: <https://www.sos.state.co.us/CCR/DisplayRule.do?action=ruleinfo&ruleId=2260&deptID=18&agencyID=96&deptName=Department%20of%20Regulatory%20Agencies&agencyName=Public%20Utilities%20Commission&seriesNum=4%20CCR%20723-4>
- Source ID: `co-sos-ccr`
- SHA-256: `54d1acd1835ad2e4924c56595186a4a115602067acf775ac835bca9897e63f5c`
- Retrieved: 2026-08-12T04:36:48.096Z
- Exported: 2026-08-24T13:44:28.316Z
- Document slug: `co-ccr-4-723-4-4752`

### Source metadata

```json
{
  "jurisdiction": "US-CO",
  "code": "4 CCR 723-4",
  "ruleKey": "4752",
  "pipelineScope": "colorado-jurisdictional-gas-utilities",
  "legalScope": "Current 4 CCR 723-4 rules regulating Colorado jurisdictional gas utilities and gas master-meter operators, including construction, operation, system safety, gas infrastructure planning, metering, service, and enforcement provisions. This is an adjacent gas-utility corpus, not a replacement for the repealed dedicated 4900-series pipeline-safety rules.",
  "applicabilityCaveat": "Part 4 applies according to Colorado Public Utilities Commission jurisdiction and each rule's scope. The former dedicated pipeline-safety rules 4900 through 4975 are reserved after repeal; this connector does not represent them as current. Part 4 does not replace federal pipeline-safety requirements, determine whether a facility is interstate or intrastate, or resolve operator-specific orders, waivers, tariffs, or later rulemaking.",
  "references": [
    {
      "citation": "40-3.2-103(1) C.R.S.",
      "referenceType": "colorado-revised-statutes",
      "url": null
    }
  ],
  "ruleInfoUrl": "https://www.sos.state.co.us/CCR/DisplayRule.do?action=ruleinfo&ruleId=2260&deptID=18&agencyID=96&deptName=Department%20of%20Regulatory%20Agencies&agencyName=Public%20Utilities%20Commission&seriesNum=4%20CCR%20723-4",
  "pucRulesUrl": "https://puc.colorado.gov/gasrulesandregulations",
  "ruleVersionId": "12549",
  "editionEffectiveOn": "2026-06-14",
  "publicationStatus": "The Colorado Secretary of State identifies the source as the official publication of state administrative rules. The edition date applies to the compiled rule version and is not represented as the effective date of every provision.",
  "rights": "Official state rule text is preserved with attribution and source links. Public accessibility does not imply rights in agency marks, third-party material, or incorporated standards; commercial redistribution requires review.",
  "region": "CO"
}
```