# Inspections

**Citation:** RCSA § 16-280b-B17  
**Type / status:** regulation / current  
**Agency:** Connecticut Public Utilities Regulatory Authority  
**Effective:** 2025-06-11  
**Published:** 2025-06-11

(a) Each Operator shall perform daily inspections of construction-related Covered Tasks. (b) The inspections performed pursuant to subsection (a) of this section, shall be accomplished by inspectors assigned to oversee a maximum of three crews per day, except due to short-term staff absences. 29 (c) New construction co

## Document text

(a) Each Operator shall perform daily inspections of construction-related Covered Tasks. (b) The inspections performed pursuant to subsection (a) of this section, shall be accomplished by inspectors assigned to oversee a maximum of three crews per day, except due to short-term staff absences. 29 (c) New construction contractors and new crew leaders of existing construction contractors shall be inspected while performing construction-related Covered Tasks until clear competency in performing the applicable Covered Tasks has been demonstrated.

## Provenance

- Official: Yes
- Source: <https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D>
- Source ID: `ct-sots-rcsa-16-280b`
- SHA-256: `c8b9451189feca9d3de4d63802ead2a54a4d2d58a04dd544c15f58fa96be8067`
- Retrieved: 2026-08-12T07:07:58.041Z
- Exported: 2026-08-22T02:15:28.545Z
- Document slug: `ct-rcsa-16-280b-b17`

### Source metadata

```json
{
  "jurisdiction": "US-CT",
  "subtitle": "16-280b",
  "series": "B",
  "sectionNumber": 17,
  "secretaryFileNumber": 6446,
  "trackingNumber": "PR2023-019",
  "effectiveDateEvidence": "Secretary of the State confirmation states that the regulation became effective June 11, 2025.",
  "scopeCaveat": "This corpus contains all 117 dedicated pipeline-safety sections newly codified as RCSA 16-280b-A1 through A75, B1 through B32, and C1 through C10 by Connecticut Secretary of the State File Number 6446. The filing also amends four adjacent legacy utility provisions and repeals eleven obsolete 16-11 provisions; those actions are retained as provenance and inventory rather than mixed into the dedicated searchable corpus.",
  "applicabilityCaveat": "Applicability varies by natural-gas or petroleum-gas operator, public-service-company status, pipeline facility, master-meter or petroleum-gas distribution system, activity, waiver, and federal jurisdiction. PURA states that Connecticut has no intrastate transmission or gathering lines and that hazardous-liquid pipelines remain under PHMSA jurisdiction.",
  "incorporationCaveat": "The rules supplement and repeatedly incorporate federal pipeline requirements, generally as amended from time to time, and rely on Connecticut statutes and external standards. References are recorded without reproducing incorporated material or deciding federal preemption or facility-specific legal effect.",
  "publicationCaveat": "The authenticated final filing was posted to the Connecticut eRegulations System and became effective June 11, 2025. It is used instead of the older browse pages, some of which still display pre-2025 text and stale update labels.",
  "rights": "Official Connecticut legal and agency materials are retained with attribution and cryptographic provenance. State marks, site presentation, forms, annotations, and incorporated federal or privately authored material require separate review.",
  "rightsReviewRequired": true,
  "region": "CT"
}
```