(a) Each Procedure shall identify why the Procedure is necessary, what action is performed, who performs the action, when the action is performed, where the action is performed, how the action is performed, and the documentation required for the performance of such action. If any additional actions are required after p

## Document text

(a) Each Procedure shall identify why the Procedure is necessary, what action is performed, who performs the action, when the action is performed, where the action is performed, how the action is performed, and the documentation required for the performance of such action. If any additional actions are required after performing any Procedure, such Procedure shall explain the process for the performance of such additional actions. (b) Each Operator shall provide the Authority copies or access to all Procedures, other than Job-Specific Procedures. (c) Each Operator shall provide the Authority with notice and copies or access to all Procedures, other than Job-Specific Procedures, that have been revised, substituted or amended at least 10 calendar days prior to implementation, except where 24 prevented by unavoidable circumstances, in which case, notice and copies or access shall be provided as soon as practicable. The revised, substituted or amended Procedures shall be annotated to show all revisions.

## Provenance

- Official: Yes
- Source: <https://eregulations.ct.gov/eRegsPortal/Search/getDocument?guid=%7BE04F6097-0000-CC1C-9D68-25A0BA411C82%7D>
- Source ID: `ct-sots-rcsa-16-280b`
- SHA-256: `7567f729dba19e11a2022c694fa577cad394a44670ef374ec99ce4632a92204e`
- Retrieved: 2026-08-12T07:07:58.041Z
- Exported: 2026-08-24T11:18:48.799Z
- Document slug: `ct-rcsa-16-280b-b2`

### Source metadata

```json
{
  "jurisdiction": "US-CT",
  "subtitle": "16-280b",
  "series": "B",
  "sectionNumber": 2,
  "secretaryFileNumber": 6446,
  "trackingNumber": "PR2023-019",
  "effectiveDateEvidence": "Secretary of the State confirmation states that the regulation became effective June 11, 2025.",
  "scopeCaveat": "This corpus contains all 117 dedicated pipeline-safety sections newly codified as RCSA 16-280b-A1 through A75, B1 through B32, and C1 through C10 by Connecticut Secretary of the State File Number 6446. The filing also amends four adjacent legacy utility provisions and repeals eleven obsolete 16-11 provisions; those actions are retained as provenance and inventory rather than mixed into the dedicated searchable corpus.",
  "applicabilityCaveat": "Applicability varies by natural-gas or petroleum-gas operator, public-service-company status, pipeline facility, master-meter or petroleum-gas distribution system, activity, waiver, and federal jurisdiction. PURA states that Connecticut has no intrastate transmission or gathering lines and that hazardous-liquid pipelines remain under PHMSA jurisdiction.",
  "incorporationCaveat": "The rules supplement and repeatedly incorporate federal pipeline requirements, generally as amended from time to time, and rely on Connecticut statutes and external standards. References are recorded without reproducing incorporated material or deciding federal preemption or facility-specific legal effect.",
  "publicationCaveat": "The authenticated final filing was posted to the Connecticut eRegulations System and became effective June 11, 2025. It is used instead of the older browse pages, some of which still display pre-2025 text and stale update labels.",
  "rights": "Official Connecticut legal and agency materials are retained with attribution and cryptographic provenance. State marks, site presentation, forms, annotations, and incorporated federal or privately authored material require separate review.",
  "rightsReviewRequired": true,
  "region": "CT"
}
```