# RECORDS

**Citation:** 15 DCMR § 2314  
**Type / status:** regulation / current  
**Agency:** Public Service Commission of the District of Columbia  
**Effective:** Not stated  
**Published:** Not stated

2314.1 Each gas corporation or small gas operator shall organize, prepare, and maintain all necessary records and reports to insure and to demonstrate compliance with this chapter. All records and reports shall be available for inspection at all times by the Commission, its staff, or its authorized 

## Document text

2314.1 Each gas corporation or small gas operator shall organize, prepare, and maintain all necessary records and reports to insure and to demonstrate compliance with this chapter. All records and reports shall be available for inspection at all times by the Commission, its staff, or its authorized employees in the normal discharge of their duties. 2314.2 Each gas corporation or small gas operator shall maintain specifications for material and equipment, installation, testing, and fabricating. 2314.3 Each gas corporation or small gas operator shall maintain plans covering operating and maintenance procedures, including the maximum allowable operating pressures to which all lines are intended to be subjected. 2314.4 The gas corporation or small gas operator shall record and retain records indicating the location of all pipelines which it owns so that the records are as accurate as reasonably practicable, based on the gas corporation or small gas operator’s information as of two (2) months from the date of installation or change. The installation date of a new or replaced utility is considered the pressure test date of the utility after installation. SOURCE: Final Rulemaking published at 33 DCR 6625, 6630 (October 24, 1986); as amended by Final Rulemaking published at 60 DCR 7 (January 4, 2013).

## Provenance

- Official: Yes
- Source: <https://dcpsc.org/PSCDC/media/Images/15-23-Compiled_1.pdf>
- Source ID: `dcpsc-15-dcmr-23`
- SHA-256: `a3dea5e790bd2a7671873c3ca6d566b3b293bc281e9f349624dae8940cef4227`
- Retrieved: 2026-08-20T09:38:13.980Z
- Exported: 2026-08-23T00:33:56.726Z
- Document slug: `dc-dcmr-15-23-2314`

### Source metadata

```json
{
  "jurisdiction": "US-DC",
  "chapter": "15 DCMR Chapter 23",
  "section": "2314",
  "exactScope": "This bounded corpus contains the 16 current Chapter 23 sections that directly establish intrastate natural-gas pipeline standards, inspections, reporting, operator duties, enforcement, penalties, or definitions. Reserved sections and adjacent gas procurement, metering, gas-quality, pressure, and appliance-service rules remain inventory-only.",
  "applicabilityCaveat": "The rules apply only within District of Columbia Public Service Commission jurisdiction and distinguish gas corporations from small master-meter operators. Facility, operator, intrastate status, federal preemption, waivers, and the section-specific text must be evaluated before use.",
  "incorporationCaveat": "Section 2301 adopts 49 CFR Parts 190, 191, 192, and 199 without printing a fixed edition date in the compiled text. The connector records the reference but does not decide whether every later federal amendment is incorporated or silently substitute current federal text.",
  "publicationCaveat": "The PSC-hosted Chapter 23 compilation is an official convenience compilation. Source notes identify D.C. Register rulemakings, but the PDF does not state a single certified current-through date; retrieval time is publication observation only.",
  "rights": "District government rule and code text is retained with attribution and artifact hashes. Site presentation, seals, forms, incorporated federal text, ASTM material, and other third-party content require separate review.",
  "rightsReviewRequired": true,
  "references": [],
  "region": "DC"
}
```
