10.6(1) A pipeline permit shall be issued once an order granting the permit is final and all the compliance requirements have been met. A pipeline company may request commission approval to delay obtaining consent to cross a railroad right-of-way until after the pipeline permit is issued. 10.6(2) Th

## Document text

10.6(1) A pipeline permit shall be issued once an order granting the permit is final and all the compliance requirements have been met. A pipeline company may request commission approval to delay obtaining consent to cross a railroad right-of-way until after the pipeline permit is issued.

10.6(2) The issuance of the permit authorizes construction on the route or location as approved by the commission, subject to deviation within the permanent route easement right-of-way. If a deviation outside of the permanent route easement right-of-way becomes necessary, construction of the pipeline in that location shall be suspended and the pipeline company shall follow the procedures for filing of a petition for amendment of a permit, except that the pipeline company need only file Exhibits A, B, E, and F reflecting the proposed deviation. In case of any deviation from the approved permanent route easement, the pipeline company shall secure the necessary easements before construction may commence on the altered route. The right of eminent domain shall not be used to acquire any such easement except as specifically approved by the commission, and a hearing will not be required unless the commission determines a hearing is necessary to complete review of the petition for amendment.

10.6(3) If the construction of facilities authorized by a permit is not commenced within two years of the date the permit is granted, or within two years after final disposition of judicial review of a permit order or of condemnation proceedings, the permit is forfeited unless the commission grants an extension of the permit filed prior to the expiration of the two-year period.

10.6(4) Upon completion of the proposed construction, maps accurately showing the final routing of the pipeline, in compliance with 199-Chapter 9 and revised Exhibits A, B, and C, shall be filed with the commission.

## Provenance

- Official: Yes
- Source: <https://www.legis.iowa.gov/DOCS/ACO/IAC/LINC/Chapter.199.10.pdf>
- Source ID: `ia-legislature-pipeline-safety`
- SHA-256: `ffc24e42213c1f957b78c1dbd49328477cb3645924b2bf3d8750a5d8d10ea651`
- Retrieved: 2026-08-20T08:17:15.771Z
- Exported: 2026-08-25T06:42:25.463Z
- Document slug: `ia-iac-199-10-6`

### Source metadata

```json
{
  "jurisdiction": "US-IA",
  "chapter": "199 IAC chapter 10",
  "exactScope": "This bounded corpus contains every current rule in 199 IAC chapters 10 and 19, the two chapters identified by the Iowa Utilities Commission pipeline-safety page, plus 15 selected Iowa Code sections that directly establish gas-utility applicability, inspection and rulemaking authority, enforcement, penalties, and acceptance of federal pipeline-safety aid. It does not claim all Iowa pipeline law or all of Iowa Code chapters 476 and 479.",
  "excludedScope": "Excluded are hazardous-liquid safety (which the IUC says remains exclusively with PHMSA), hazardous-liquid permitting in 199 IAC chapter 13 and Iowa Code chapter 479B, damage prevention and one-call law, agricultural restoration chapter 9, railroad-crossing chapter 42, general procedure and filing chapters, permits/orders/forms, privately owned propane service, and federal or private incorporated text. Former 199 IAC chapter 12 is inventoried as repealed and is not searchable.",
  "applicabilityCaveat": "Applicability depends on IUC jurisdiction, public-utility or pipeline-company status, intrastate versus interstate status, the gas and facility involved, customer count, rate regulation, exemptions, federal preemption, waivers, permits, tariffs, and Commission orders. Iowa inspects interstate gas operators only as PHMSA's agent; federal authorities retain enforcement. Chapter 19 is limited to rate-regulated gas utilities except where another law or order extends a duty.",
  "incorporationCaveat": "The rules incorporate or reference 49 CFR Parts 191, 192, 193, and 199; ASME B31.8-2022; NFPA 59-2024, NFPA 54-2024, and NFPA 501A-2021; other Iowa rules and statutes; federal forms and interpretations; and utility tariffs. The connector records citations but does not reproduce incorporated federal or private material, decide which edition controls beyond the state text, or grant rights in private standards.",
  "publicationCaveat": "The current IAC chapter listings dated August 5, 2026 are used to prove chapter and rule inventory; their official PDF and DOCX-formatted 'RTF' artifacts are archived independently. The official 2026 Iowa Code was published December 22, 2025. The live 2026 Code & Acts Sections Amended report is provisional; signed HF 2799 sections 23 and 24, effective July 1, 2026, are preserved as overlays to selected sections 476.1B and 476.2. Any unexpected selected-section amendment causes refresh failure.",
  "rights": "Iowa legal text and other government edicts are preserved with official attribution and cryptographic provenance. Public access does not grant rights in agency seals, website presentation, forms, utility filings, incorporated federal compilations, or privately authored standards; redistribution of those materials requires a separate rights review.",
  "references": [
    {
      "citation": "199 IAC 9",
      "referenceType": "iowa-administrative-code"
    }
  ],
  "sourceHistory": "[ARC 9348C, IAB 6/11/25, effective 7/16/25]",
  "region": "IA"
}
```