# Strength Test Requirements for Steel Pipeline to Operate at a Hoop Stress of 30 Percent or More of SMYS \[49 CFR 192.505\]

**Citation:** LAC 43:XIII §2305  
**Type / status:** regulation / current  
**Agency:** Louisiana Office of Conservation  
**Effective:** Not stated  
**Published:** Not stated

A. Except for service lines, each segment of a steel pipeline that is to operate at a hoop stress of 30 percent or more of SMYS must be strength tested in accordance with this Section to substantiate the proposed maximum allowable operating pressure. In addition, in a Class 1 or Class 2 location, if

## Document text

A. Except for service lines, each segment of a steel pipeline that is to operate at a hoop stress of 30 percent or more of SMYS must be strength tested in accordance with this Section to substantiate the proposed maximum allowable operating pressure. In addition, in a Class 1 or Class 2 location, if there is a building intended for human occupancy within 300 feet (91 meters) of a pipeline, a hydrostatic test must be conducted to a test pressure of at least 125 percent of maximum operating pressure on that segment of the pipeline within 300 feet (91 meters) of such a building, but in no event may the test section be less than 600 feet (183 meters) unless the length of the newly installed or relocated pipe is less than 600 feet (183 meters). However, if the buildings are evacuated while the hoop stress exceeds 50 percent of SMYS, air or inert gas may be used as the test medium. [49 CFR 192.505(a)]

B. In a Class 1 or Class 2 location, each compressor station, regulator station, and measuring station, must be tested to at least Class 3 location test requirements. [49 CFR 192.505(b)]

C. Except as provided in Subsection D of this Section, the strength test must be conducted by maintaining the pressure at or above the test pressure for at least eight hours. [49 CFR 192.505(c)]

D. For fabricated units and short sections of pipe, for which a post installation test is impractical, a pre-installation strength test must be conducted by maintaining the pressure at or above the test pressure for at least four hours. [49 CFR 192.505(d)]

AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.

HISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:238 (April 1983), amended LR 10:530 (July 1984), LR 27:1545 (September 2001), LR 30:1256 (June 2004), LR 31:684 (March 2005), LR 44:1041 (June 2018).

## Provenance

- Official: Yes
- Source: <https://www.doa.la.gov/doa/osr/louisiana-administrative-code/>
- Source ID: `la-osr-lac`
- SHA-256: `3f0733543beed2a16d59fbf5fc092bc8562a1784d59811f6407736349a2db3fd`
- Retrieved: 2026-08-12T05:03:44.627Z
- Exported: 2026-08-27T08:24:14.473Z
- Document slug: `la-lac-43-xiii-2305`

### Source metadata

```json
{
  "jurisdiction": "US-LA",
  "part": "LAC 43:XIII",
  "section": "2305",
  "pipelineScope": "louisiana-pipeline-safety",
  "legalScope": "Louisiana Office of Conservation pipeline-safety rules governing covered transportation of gas, gas reporting, incorporated and modified federal gas-pipeline requirements, drug and alcohol testing, and LNG facilities.",
  "applicabilityCaveat": "Part XIII applies only within the scope of its certification or agreement, jurisdictional and facility limitations, and section-specific exclusions. Determine operator status, commodity, intrastate or interstate jurisdiction, coastal or Outer Continental Shelf location, gathering classification, LNG status, and federal preemption before applying a provision.",
  "incorporationCaveat": "Part XIII incorporates and modifies portions of 49 CFR Parts 40, 191, 192, 193, and 199. Bracketed federal citations identify the source provision, but Louisiana numbering and text control only within the state rule's scope; consult both current Louisiana and applicable federal text.",
  "historicalNote": "HISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:238 (April 1983), amended LR 10:530 (July 1984), LR 27:1545 (September 2001), LR 30:1256 (June 2004), LR 31:684 (March 2005), LR 44:1041 (June 2018).",
  "authorityNote": "AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.",
  "reserved": false,
  "references": [
    {
      "citation": "49 CFR 192.505",
      "referenceType": "cfr",
      "url": "https://www.ecfr.gov/current/title-49/part-192"
    }
  ],
  "sourceEdition": "December 2025",
  "artifactPath": "data/sources/louisiana/louisiana-lac-title-43-parts-ix-xi-xiii.docx",
  "artifactSha256": "568d6b8b3cc244c67a0c93c040442fa53a1bbdafcb688b253cfa707d84d64259",
  "publicationStatus": "Current state-certified Louisiana Administrative Code compilation; section-level effective dates are not inferred from compilation or monthly history citations.",
  "rights": "The Louisiana Administrative Code is the state-certified publication. Preserve Office of State Register attribution and review Louisiana website terms, agency marks, incorporated standards, and third-party material before redistribution.",
  "region": "LA"
}
```