# Notice of Proposed Construction

**Citation:** 220 CMR 101.04  
**Type / status:** regulation / current  
**Agency:** Massachusetts Department of Public Utilities  
**Effective:** 2024-10-11  
**Published:** 2024-10-11

(1) Notice of proposed construction shall be filed with the Department at least 14 days prior to the start of any of the following projects: (a) All new and replacement pipeline installation projects of 1,000 feet or more in length. (b) All new and replacement pipeline installation projects where th

## Document text

(1) Notice of proposed construction shall be filed with the Department at least 14 days prior to the start of any of the following projects:

(a) All new and replacement pipeline installation projects of 1,000 feet or more in length.

(b) All new and replacement pipeline installation projects where the pipeline will have an MAOP of 125 psig or more.

(c) All Uprating projects.

(2) If there are no construction projects in a calendar year meeting the requirements of 220 CMR 101.04(1), then an operator shall file with the Department a notice of proposed construction at least 14 days prior to the start of any project for no fewer than three projects, provided that at least three projects are undertaken.

## Provenance

- Official: Yes
- Source: <https://www.mass.gov/doc/220-cmr-10100-1/download>
- Source ID: `ma-dpu-cmr`
- SHA-256: `edef41841ec72db9400fa1cc44b220d3f78d3e4b7ce2ac24cc66570773340158`
- Retrieved: 2026-08-12T05:00:35.559Z
- Exported: 2026-08-23T18:11:58.562Z
- Document slug: `ma-cmr-220-101-04`

### Source metadata

```json
{
  "jurisdiction": "US-MA",
  "titleNumber": 220,
  "part": "101.00",
  "section": "101.04",
  "pipelineScope": "massachusetts-intrastate-natural-gas-pipeline-safety",
  "effectiveOn": "2024-10-11",
  "adoptedOn": "2024-09-26",
  "adoptionDocket": "D.P.U. 22-100",
  "registerNumber": 1532,
  "statutoryAuthority": "M.G.L. c. 164, §§ 66, 76, 76C, 105A, and 116B",
  "incorporatedFederalStandards": [
    "49 CFR Part 40",
    "49 CFR Part 192",
    "49 CFR Part 199"
  ],
  "references": [
    {
      "citation": "220 CMR 101.04",
      "referenceType": "massachusetts-regulation",
      "url": "https://www.mass.gov/info-details/220-cmr-department-of-public-utilities"
    }
  ],
  "pdfArtifactPath": null,
  "pdfArtifactSha256": null,
  "extractedTextPath": null,
  "extractedTextSha256": null,
  "indexArtifactPath": null,
  "indexArtifactSha256": null,
  "annualReportArtifactPath": null,
  "annualReportArtifactSha256": null,
  "applicabilityCaveat": "Applicability depends on Massachusetts intrastate jurisdiction, operator and facility status, the definitions and exceptions in 220 CMR 101.00, incorporated federal standards, Department waivers or orders, and section-specific transition periods. The Massachusetts Pipeline Safety Division does not regulate interstate pipelines or hazardous-material transportation by pipeline.",
  "publicationCaveat": "Mass.gov states that posted DPU regulations are informational copies rather than the legally official CMR edition. The official CMR is available through the Massachusetts State Bookstore; verify the official edition before legal reliance.",
  "rights": "Preserve Commonwealth provenance and source links. Public availability does not grant rights in seals, marks, third-party standards, or incorporated material; redistribution requires rights review.",
  "rightsReviewRequired": true,
  "region": "MA"
}
```
