# PIPELINE CONSTRUCTION COMPLETION CERTIFICATION.

**Citation:** Minn. R. 7852.3900  
**Type / status:** regulation / current  
**Agency:** Minnesota Public Utilities Commission  
**Effective:** Not stated  
**Published:** 2007-08-21

Permittees shall file with the commission a written certification that the permitted pipeline construction has been completed in compliance with all permit conditions. The certification shall be considered by the commission within 60 days of its filing. The commission shall accept or reject the cert

## Document text

Permittees shall file with the commission a written certification that the permitted pipeline construction has been completed in compliance with all permit conditions. The certification shall be considered by the commission within 60 days of its filing. The commission shall accept or reject the certification of completion and make a final determination regarding cost or reimbursements due. If the commission rejects the certification, it shall inform the permittee in writing which deficiencies, if corrected, will allow the certification to be accepted. When corrections to the deficiencies are completed, the permittee shall notify the commission, and the commission shall reconsider the certification at its next regularly scheduled meeting, provided the notification is received at least 20 days before the meeting. After acceptance of the certification by the commission, the commission's jurisdiction over the permittee's pipeline routing permit shall be terminated.

## Provenance

- Official: Yes
- Source: <https://www.revisor.mn.gov/rules/7852.3900>
- Source ID: `mn-revisor`
- SHA-256: `bc1d67abf803a0697d5a7e23e1fe45c2af93cf0f3222c16af8d3419870f50872`
- Retrieved: 2026-08-12T03:50:50.897Z
- Exported: 2026-08-23T12:49:47.386Z
- Document slug: `minn-r-7852-3900`

### Source metadata

```json
{
  "jurisdiction": "US-MN",
  "collection": "rules-7852",
  "pipelineScope": "pipeline-route-permitting",
  "legalScope": "Pipeline route selection, permit applications, environmental review, construction conditions, restoration, complaints, amendments, and completion certification under Minnesota Rules chapter 7852. This chapter regulates routing and location review, not pipeline design or construction safety standards.",
  "versionListUrl": "https://www.revisor.mn.gov/rules/7852/versions",
  "authenticatedPdfUrl": "https://www.revisor.mn.gov/rules/pdf/7852/2024-11-06%2014:55:30+00:00",
  "publicationStatus": "Revisor-hosted HTML with an online authenticated PDF designated as the official electronic record where linked.",
  "officialRecordFormat": "authenticated-pdf",
  "rightsReviewRequired": true,
  "rightsNoticeUrl": "https://www.revisor.mn.gov/rules/info/",
  "rightsNote": "Minnesota Revisor states that website rules information is intended for personal, noncommercial use and does not authorize commercial republication. Obtain a rights review before redistribution.",
  "chapter": "7852",
  "part": "7852.3900",
  "statutoryAuthority": "MS s 116I.015; 216G.02",
  "statutoryAuthorityReferences": [
    {
      "text": "116I.015",
      "url": "https://www.revisor.mn.gov/statutes/cite/116I.015",
      "referenceType": "minnesota-statute"
    },
    {
      "text": "216G.02",
      "url": "https://www.revisor.mn.gov/statutes/cite/216G.02",
      "referenceType": "minnesota-statute"
    }
  ],
  "stateRegisterHistory": "13 SR 2046; L 2005 c 97 art 3 s 19",
  "stateRegisterCitations": [
    "13 SR 2046"
  ],
  "historyReferences": [],
  "publishedElectronically": "August 21, 2007",
  "publishedElectronicallyOn": "2007-08-21",
  "publicationDateCaveat": "Published Electronically identifies Revisor publication and is not necessarily the date of the latest substantive amendment.",
  "region": "MN"
}
```
