# STIPULATION

**Citation:** 18.60.4.15 NMAC  
**Type / status:** regulation / current  
**Agency:** New Mexico Public Regulation Commission  
**Effective:** 2006-07-17  
**Published:** Not stated

A. At any time before the issuance of a final order, the director and the respondent may agree to resolve a case by stipulation. The stipulation may include assessment or waiver of a civil or administrative penalty or other sanctions. B. A stipulation shall include: (1) an admission by the responden

## Document text

A. At any time before the issuance of a final order, the director and the respondent may agree to resolve a case by stipulation. The stipulation may include assessment or waiver of a civil or administrative penalty or other sanctions.

B. A stipulation shall include:

(1) an admission by the respondent of all jurisdictional facts;

(2) an express waiver of the right to pursue further procedural remedies before the commission and of the right to seek judicial review or otherwise challenge or contest the validity of the stipulation;

(3) an acknowledgement that the notice of probable violation may be used to construe the terms of the stipulation;

(4) an acknowledgement that the stipulation will be considered a violation for purposes of penalties for subsequent violations; and

(5) a statement of the actions to be taken by the respondent and the time by which each action shall be accomplished.

C. If a case is resolved by stipulation, staff shall file a motion requesting approval of the stipulation and closing of the case.

## Provenance

- Official: Yes
- Source: <https://www.srca.nm.gov/parts/title18/18.060.0004.html>
- Source ID: `nm-srca-nmac`
- SHA-256: `abc29d8c469a5374a55e35fa31f245183f7504d92b9b67ad1dcaa9631ddd52f4`
- Retrieved: 2026-08-20T08:28:34.875Z
- Exported: 2026-08-25T05:15:08.520Z
- Document slug: `nm-nmac-18-60-4-15`

### Source metadata

```json
{
  "jurisdiction": "US-NM",
  "title": 18,
  "chapter": 60,
  "part": "4",
  "section": 15,
  "partTitle": "PIPELINE SAFETY ENFORCEMENT PROCEDURES",
  "pipelineScope": "new-mexico-pipeline-safety",
  "legalScope": "Complete current official NMAC Title 18, Chapter 60, Parts 2 through 5: general pipeline-safety provisions, annual fees, enforcement procedures, and excavation-damage prevention. Part 1 is reserved.",
  "applicabilityCaveat": "Applicability depends on New Mexico Public Regulation Commission jurisdiction, pipeline or underground-facility type, operator and activity, intrastate or interstate status, federal preemption, incorporated federal rules, exemptions, waivers, and current Commission orders. Excavation-damage provisions also apply to one-call systems and excavators as specified in Part 5.",
  "rights": "Official New Mexico Administrative Code text is preserved with State Records Center and Archives attribution and source provenance. Agency marks, site presentation, linked material, and incorporated federal or third-party standards may carry separate rights; confirm reuse requirements beyond legal research.",
  "currentEffectiveOn": "2006-07-17",
  "effectiveDateBasis": "Latest explicit date in the official section history note; not a chapter-wide publication date.",
  "rawHistory": "[18.60.4.15 NMAC - Rp, 18.60.2.15 NMAC, 7-17-06]",
  "references": [
    {
      "citation": "18.60.4.15 NMAC",
      "referenceType": "new-mexico-administrative-code"
    },
    {
      "citation": "18.60.2.15 NMAC",
      "referenceType": "new-mexico-administrative-code"
    }
  ],
  "publicationStatus": "Current official NMAC part text published by the New Mexico State Records Center and Archives.",
  "region": "NM"
}
```
