NTSB investigation DCA09FP007.

Event Type: Accident

Event Date: 2009-05-04

Event City: Palm City

Event State Or Region: FL

Event Country: USA

Pipeline Operator: Florida Gas Transmission Company

Pipeline Type: Gas Transmission - Regulated

Accident Type: Rupture

Completion Status: Completed

Report Number: PAB-13-01

Probable cause: The National Transportation Safety Board determines that the probable cause of the accident was environmentally assisted cracking under a disbonded polyethylene coating that remained undetected by the integrity management program. Contributing to the accident was Florida Gas Transmission Company’s failure to include the pipe section that ruptured in the integrity management program. Contributing to the prolonged gas release was the pipeline controller’s inability to detect the rupture because of SCADA system limitations and the configuration of the pipeline

Tier1Name: System operating

Tier2Name: Product leak/release

Tier1Name: System operating

Tier2Name: Pipe structural malfunction/failure

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline operation/capability

Finding Tier3Name: (general)

Finding Modifier Name: Incorrect service/maintenance

Finding Report Text: Pipeline - Pipeline operation/capability - (general) - Incorrect service/maintenance

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline operation/capability

Finding Tier3Name: (general)

Finding Modifier Name: Inadequate inspection

Finding Report Text: Pipeline - Pipeline operation/capability - (general) - Inadequate inspection

Finding Tier1Name: Personnel

Finding Tier2Name: Experience/knowledge

Finding Tier3Name: (general)

Finding Modifier Name: SCADA operations personnel

Finding Report Text: Personnel - Experience/knowledge - (general) - SCADA operations personnel

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Pipe coatings/anti-corrosion

Finding Modifier Name: Damaged/degraded

Finding Report Text: Pipeline - Pipeline structure - Pipe coatings/anti-corrosion - Damaged/degraded

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Pipe coatings/anti-corrosion

Finding Modifier Name: Failure

Finding Report Text: Pipeline - Pipeline structure - Pipe coatings/anti-corrosion - Failure

Official NTSB investigation data. NTSB findings determine probable cause and make safety recommendations; they do not adjudicate civil liability or regulatory violations.

What Happened
On Monday, May 4, 2009, about 5:10 a.m. eastern daylight time, Florida Gas Transmission Company’s (FGT) line 100, an 18-inch-diameter natural gas transmission pipeline, ruptured about 6 miles south of Palm City, Florida. The rupture occurred in a sparsely populated rural area of Martin County and displaced about 106 feet of buried pipe onto the right-of-way between Interstate 95 (I-95) and the Florida Turnpike (SR-91). An estimated 36 million cubic feet of natural gas was released during the accident without ignition. Two parallel FGT natural gas transmission pipelines in the same right-of-way were undamaged. Three minor injuries were attributed to the rupture: two people were injured escaping from a vehicle that lost control and ran off the turnpike, and one member of the Palm Beach County Sheriff’s department walked through a dense cloud and inhaled natural gas. The rupture occurred between two automatic shutoff valves (ASV), but only one valve shut in response to the pressure drop on the pipeline.
Emergency responders rerouted traffic on both SR-91 and I-95 and evacuated a high school and a residential subdivision that were nearby. The FGT control center did not receive any Supervisory Control and Data Acquisition (SCADA) alarms or recognize the rupture from SCADA data. However, emergency response personnel began notifying the FGT control center at 5:49 a.m., after which the control center dispatched three field operators to the scene. By 7:30 a.m., the field operators had stopped the flow of natural gas. Local authorities reopened I-95 by 8:00 a.m. and SR-91 by 11:15 a.m. About 2 hours 20 minutes had elapsed from the time of the rupture to the complete isolation of the flow of gas

What We Found
We determined that the probable cause of the accident was environmentally assisted cracking under a disbonded polyethylene coating that remained undetected by the integrity management program.
Contributing to the accident was Florida Gas Transmission Company’s failure to include the pipe section that ruptured in the integrity management program. Contributing to the prolonged gas release was the pipeline controller’s inability to detect the rupture because of SCADA system limitations and the configuration of the pipeline.

PAB-13-01
<<<PAGE 1>>>

L
T
R
A
N
S
P
A
O
N
R
U
R
I
B
U
S
M
T
O
I
A
T
A
U N U
P
L
E
T
I
O
N
N
S
A
F
E
T
B
D
O
A
R
National Transportation Safety Board
Washington, D.C. 20594
Y
Pipeline Accident Brief
Accident No.: DCA09FP007
Accident Type: Rupture of Florida Gas Transmission Pipeline and Release of
Natural Gas
Location: Near Palm City, Florida
Date: May 4, 2009
Time: 5:10 a.m. eastern daylight time
Owner/Operator: Florida Gas Transmission Company
Fatalities: 0
Injuries: 3
Damage/Clean-up Cost: $606,360
Material Released: Natural gas
Quantity Released: 36 million standard cubic feet (estimated)
Pipeline Failure Pressure: 854 psig
The Accident
On Monday, May 4, 2009, about 5:10 a.m. eastern daylight time,
1 Florida Gas
Transmission Company’s (FGT)2 line 100, an 18-inch-diameter natural gas transmission
pipeline, ruptured about 6 miles south of Palm City, Florida. The rupture occurred in a sparsely
populated rural area of Martin County and displaced about 106 feet of buried pipe onto the
right-of-way between Interstate 95 (I-95) and the Florida Turnpike (SR-91). An estimated
36 million cubic feet of natural gas was released during the accident without ignition. Two
parallel FGT natural gas transmission pipelines in the same right-of-way were undamaged.
3
Three minor injuries were attributed to the rupture: two people were injured escaping from a
vehicle that lost control and ran off the turnpike, and one member of the Palm Beach County
Sheriff’s department walked through a dense cloud and inhaled natural gas. The rupture occurred
between two automatic shutoff valves (ASV),
4 but only one valve shut in response to the
pressure drop on the pipeline.
1 All times in this report are eastern daylight time unless otherwise noted.
2 From 2004 through 2006, FGT was owned by Citrus Corp. Cross Country Energy and El Paso Corporation
indirectly owned 50 percent of Citrus Corp. In 2006, Southern Union Company purchased 50 percent interest in
FGT from Cross Country Energy.
3 FGT operates a 24-inch (line 200) and a 30-inch pipeline (line 300) in the same right-of-way as line 100.
4 An automatic shutoff valve uses electric- or gas-powered actuators to operate the valve automatically based on
pipeline sensor readings. The sensor sends a signal to close the valve based on a preset rate of pressure decay in the
pipeline. An ASV does not require human interpretation of the pipeline operations, and it closes automatically based
on the established criteria.
CORRECTED COPY NTSB/PAB-13/01

<<<PAGE 2>>>

Emergency responders rerouted traffic on both SR-91 and I-95 and evacuated a high
school and a residential subdivision that were nearby. The FGT control center did not receive any
Supervisory Control and Data Acquisition (SCADA)5 alarms or recognize the rupture from
SCADA data. However, emergency response personnel began notifying the FGT control center
at 5:49 a.m., after which the control center dispatched three field operators to the scene. By
7:30 a.m., the field operators had stopped the flow of natural gas. Local authorities reopened
I-95 by 8:00 a.m. and SR-91 by 11:15 a.m. About 2 hours 20 minutes had elapsed from the time
of the rupture to the complete isolation of the flow of gas.
FGT operates more than 4,800 miles of Gulf Coast transmission lines from a control
center in Houston, Texas. Lines start near Galveston Bay, Texas, and extend through Louisiana,
Mississippi, and Alabama before turning south along the Florida peninsula. At the time of the
accident, the FGT system consisted of 25 compressor stations with a mainline capacity of
2.25 billion cubic feet per day. The line 100 rupture occurred between compressor
station 20 (upstream) and station 21 (downstream). (See figure 1.)
Figure 1. Route of Florida Gas Transmission’s three natural gas pipelines along Florida
peninsula.
5 FGT used a computer-based SCADA system to remotely monitor and control the movement of gas through its
pipelines. SCADA controllers at the SCADA center in Houston, Texas, monitored operating parameters such as
flow rate, pressure, equipment status, and abnormal condition alarms.
CORRECTED COPY 2 NTSB/PAB-13/01

<<<PAGE 3>>>

Accident Narrative
A section of the ruptured 18-inch pipeline, about 106 feet long and weighing more than
5,000 pounds, was ejected out of the ground and landed near the crater in two pieces,
6 leaving
two open ends of the pipe exposed and discharging natural gas. Within minutes, one of two
18-inch ASVs closed, shutting off the gas flow to the upstream (north) end of the rupture and
limiting the discharging gas to the south end. (See figure 2.) FGT operated two parallel,
interconnected 24-inch and 30-inch natural gas transmission pipelines in the same right-of-way,
but the rupture of the 18-inch line did not damage the other two lines. After the rupture, the
increased flow of gas through the open pipe began to vent the stored gas volume in the
interconnected pipelines and reduce the pressure.
Figure 2. Aerial photograph of ruptured 18-inch pipeline showing venting gas and dislodged
pipe near crater.
At the time of the accident, the 18-inch natural gas transmission line was operating at a
pressure of 854 pounds per square inch, gauge (psig), or 98.6 percent of the maximum allowable
operating pressure (MAOP).7 The rupture occurred in the final hour of the Sunday evening shift
at the FGT Houston control center, before the Monday morning shift change. The releasing gas
from the rupture resulted in pressure drops on all three of the interconnected pipelines; however,
no SCADA alarms were generated. The pipeline controller did not recognize the line pressure
and gas volume reductions as being unusual for that time of day.
6 The larger of the two pieces was about 104 feet long; the smaller piece was about 1.6 feet long.
7 Title 49 Code of Federal Regulations (CFR) 192.3 defines maximum allowable operating pressure as the
maximum pressure at which a pipeline or segment of a pipeline may be operated. MAOP is established under
49 CFR 192.619.
CORRECTED COPY 3 NTSB/PAB-13/01

<<<PAGE 4>>>

Emergency Response
The initial call to the Florida Highway Patrol reporting the accident was made at
5:16 a.m., about 6 minutes after the rupture. The first responders to the accident included the
Florida Highway Patrol and the Martin County Hazardous Materials Team, Fire Rescue
Department, Police, and Sheriff’s Office. By 5:21 a.m., the Martin County Sheriff’s Office had
received more than 31 calls reporting the incident. .
At 5:33 a.m., Martin County Fire Rescue workers were on scene near the rupture, and by
5:49 a.m. Martin County Fire Rescue made the first notification to the FGT control center,
erroneously reporting that a vehicle had struck an FGT pipeline. Within minutes of being
notified, an on-call field operator assigned to the Fort Pierce compressor station (station 20) and
another assigned to the West Palm Beach compressor station (station 21) were dispatched to the
scene by the control center. Believing that the accident involved only an aboveground pipeline
marker rather than the buried pipeline, the control center staff remained unaware that a pipeline
had actually ruptured.
By 5:59 a.m., the on-scene emergency responders had confirmed that a natural gas
pipeline had ruptured. Emergency response personnel established a 1-mile perimeter around the
site because of the risk of ignition from a vehicle idling near the rupture. About this time, the
Martin County Hazardous Materials Team notified the FGT control center that the accident
involved a ruptured pipeline near the I-95 Stuart/Jupiter exit.
After receiving the second call, the FGT gas controllers reviewed SCADA data and
identified drops in the pipeline pressures from station 20, drops in pressure at the Martin North
Florida Power and Light gas meter, and a noticeable drop in the stored gas volume in the
pipeline. At 6:05 a.m., another field operator was dispatched to the accident site. By 6:39 a.m.,
about 34 minutes after being dispatched, the first FGT field operator reported to the incident
command near mile marker 129 and was able to see a white cloud and smell the gas. This field
operator became the FGT incident commander.
The control center did not know which of the three lines had ruptured until a field
operator on scene saw that the upstream 18-inch ASV was closed. At 7:09 a.m., an FGT field
operator closed the remaining downstream ASV, and by 7:30 a.m. no discernible gas was flowing
from the ruptured pipe. Emergency responders gradually cleared the roads of debris and restored
traffic to I-95 by 8:00 a.m. and to SR-91 by 11:15 a.m.
Injuries and Evacuations
About 6:40 a.m., the fire chief ordered the evacuation of South Fork High School and the
Foxwood residential community, both less than a mile southwest of the rupture. The school
remained closed for the day, and the fire chief staged additional units in Foxwood to respond to
any fires that might break out if gas were to ignite. Emergency responders also closed I-95 and
SR-91 in both directions to maintain about a 1-mile perimeter around the ruptured pipeline.
Three injuries were directly attributed to the rupture and gas release. Two people
sustained minor injuries while leaving their vehicle after the driver lost control and ran off the
turnpike into the right-of-way. The third injury occurred when a member of the Palm Beach
CORRECTED COPY 4 NTSB/PAB-13/01

<<<PAGE 5>>>

County Sheriff’s department walked through the dense natural gas cloud and inhaled natural gas
while assisting with the response.
Pipeline Information
History
The ruptured pipeline section8 consisted of four pipe segments buried to a depth of about
3 feet 9 inches.9 Two of the 18-inch-diameter ruptured pipe segments were part of the original
1959 installation with a spiral-wrapped, field-applied Polyken 900 general utility polyethylene
tape as the primary means of corrosion protection. These two polyethylene-tape–coated pipe
segments were manufactured to the American Petroleum Institute (API) Standard 5LX10 grade
X5211 with a 0.25-inch nominal wall thickness and a direct current electric resistance
welded (ERW) longitudinal weld seam. Samples from the pipe material were tested, and the
results showed that the mechanical and chemical properties of these pipe segments met the
requirements of the API standard.
After the original installation of the pipe, a hydrostatic pressure test was performed to a
pressure of 1,085 psig, and an MAOP of 975 psig was assigned to the pipeline. In the latter half
of 1971, line 100 was hydrostatically pressure tested again, to 1,320 psig, to qualify portions of
the pipeline for Class 3 operation. This resulted in an MAOP of 866 psig, which was in place at
the time of the accident.
12
The NTSB Materials Laboratory examination revealed that the two remaining segments
of the ruptured section, downstream of girth weld 3, had been replaced with pipe that was newer
than the original pipe segments. (See figure 3.) Each of the newer segments had an ERW
longitudinal weld seam and was coated with fusion bonded epoxy. The newer segment farthest
downstream had a thicker wall than the other three pipe segments of the ruptured section. The
FGT integrity management group stated that the two newer segments13 were installed in late
2004 because of corrosion features identified during a magnetic flux leakage (MFL) in-line
inspection that same year. FGT could not provide records of the replacement project that
identified why the work was performed or whether an analysis of the defects was conducted on
8 Herein, section applies to multiple segments of pipeline; segment refers to a single joint of pipe between an
upstream and a downstream girth (circumferential) weld.
9 Pipeline burial depth is measured from the ground surface to the top of the pipe.
10 The API develops industry-based consensus standards that support oil and gas production and distribution.
API 5LX is a specification for line pipe.
11 Grade X52 signifies that the pipe has a specified minimum yield strength (SMYS) of 52,000 psi. Yield
strength is a measure of the pipe’s material strength and indicates the stress level at which the material will exhibit
permanent deformation. Although yield strength is expressed in psi, this value is not equivalent to a pipe’s internal
pressure.
12 Title 49 CFR 192.611 defines the requirements for a change in class location. Class 3 MAOP was 60 percent
of the pressure at the SMYS. The SMYS pressure was 1,444 psig for the ruptured pipe.
13 According to FGT, three 18-inch-diameter segments were installed on line 100 in December 2004: 18.3 feet
of 0.25-inch wall thickness API 5L grade X60 ERW, 41.7 feet of 0.375-inch wall thickness API 5L grade X52
seamless, and 39.6 feet of 0.375-inch wall thickness API 5L grade X65 ERW.
CORRECTED COPY 5 NTSB/PAB-13/01

<<<PAGE 6>>>

the replaced pipe segments. No other maintenance or excavation activities were identified near
the ruptured segment. In addition to the tape coating, line 100 had a cathodic protection system.14
Figure 3. Side view of crater and four pipe segments of ruptured section.
Investigators examined SCADA pressure data from the upstream compressor station for
the preceding year to identify the maximum operating pressure and operating ranges. The highest
recorded pressure during this period was 865.4 psig, and the average operating pressure was
about 850 psig. The largest daily low to high pressure range was 214 psig, with an average range
of 36.7 psig.
Natural gas operators are required by 49 CFR Part 191 to report incidents involving leaks
on transmission pipelines to the Pipeline and Hazardous Materials Safety Administration
(PHMSA). Two FGT incident reports15 identified failures caused by stress corrosion cracking
(SCC)16 on polyethylene-tape–coated pipelines in Florida and Alabama that were installed about
1959.
14 Cathodic protection is a corrosion mitigation method used by the pipeline industry to protect underground
steel structures. The system uses direct current power supplies at selected locations along the pipeline to supply
protective electrical current. The protective current is supplied to the pipeline through a ground bed that typically
contains a string of suitable anodes, with soil as an electrolyte. A wire connected to the pipeline provides the return
path for the current to complete the circuit.
15 PHMSA report numbers 19850184 (November 19, 1984) and 19850185 (February 25, 1985).
16 Stress corrosion cracking is a form of environmentally assisted cracking produced under the combined action
of corrosion and tensile stress typically manifesting as clusters of small cracks in the external body of the pipe.
CORRECTED COPY 6 NTSB/PAB-13/01

<<<PAGE 7>>>

Pipeline Configuration
Line 100 was one of three parallel, interconnected, or looped, pipelines operating along a
56.8-mile right-of-way. It transported natural gas north to south between compressor stations
20 and 21. (See figure 4.) The ruptured section was about 27.7 miles downstream of station 20.
Branch connections from all three transmission lines delivered gas to many commercial and
municipal customers between stations, including a Florida Power and Light power plant (Martin
North). According to statements made by the pipeline controllers, it was normal to see a drop in
pipeline pressure in the mornings and evenings when energy demand peaked. The 30-inch
pipeline primarily operated as a loop, supplementing gas to the 18-inch and 24-inch transmission
lines at the Jupiter regulating station through 12-inch-diameter cross-connections. Dual
pressure-reducing regulators protected the lower MAOP on the 18-inch line from the higher
MAOP on the 30-inch line.17
Figure 4. Simplified schematic of 18-inch, 24-inch, and 30-inch interconnected transmission
lines between compressor stations 20 and 21.
ASV Line Break Actuators
The rupture occurred between ASV 20-1 and ASV 20-2 on the 18-inch main line.
ASV 20-1 was about 8 miles upstream of the rupture site, and ASV 20-2 was about 12 miles
downstream. ASV 20-2 was less than 3 miles from the 12-inch cross-connect joining the 30-inch
and 18-inch pipelines. Both the 18-inch main line ASV and the 12-inch cross-connect ASV
included line break actuators that automatically close the valves if a rupture or large leak occurs.
17 The 18-inch pipeline was rated for a MAOP of 866 psig, and the 24- and 30-inch pipelines were both rated at
a MAOP of 975 psig.
CORRECTED COPY 7 NTSB/PAB-13/01

<<<PAGE 8>>>

The line break actuators are designed to close the valve when the rate of pressure drop in the
pipeline exceeds a predefined set point.
18 FGT stated that all of the line break actuators were
identical in operation, including set points. The line break actuator on ASV 20-2 was set to trip at
a pressure drop of 15.5 psig against an operating line pressure of 800 psig.
After the rupture, the upstream flow was stopped when the line break actuator at
ASV 20-1 tripped and closed the valve about 2 minutes after the rupture, whereas the line break
actuator downstream of the rupture at ASV 20-2 did not trip. ASV 20-2 was closed by hand by an
FGT crew about 2 hours after the rupture. After the accident, FGT tested the line break actuator
at ASV 20-2, and it tripped as intended at its design set point.
The FGT operations group performed yearly inspections and testing of the line break
actuators to verify they operated properly. The manufacturer’s service manual defines the
relationship between rate of pressure drop and line pressure. If the rate of pressure drop is not
steep enough, then the line break actuator may not trip. The line break actuator on ASV 20-1 did
not trip when the line ruptured, most likely because the rate of pressure drop at the line break
actuator was below the set point of the device. The limitations and design considerations for the
use of line break actuators, including when they are installed in looped systems, are documented
in a 1995 Southwest Research Institute report, Remote and Automatic Main Line Valve
Technology Assessment:
19
Both field experience and simulation results show that rate of pressure drop
measurements in looped lines are not as reliable for line break detection as in
single line systems. Because flow from adjacent loops feed the ruptured line
through open crossovers, pressure in the ruptured line does not fall as fast as it
would if it were in a single line or if crossovers were closed.
SCADA System
When the pipeline ruptured, the SCADA pressure readings at the upstream compressor
station showed a 24.3 psig drop20 on the l8-inch line followed by steadily decreasing pressures in
both the 30-inch and the 24-inch transmission lines.21 The SCADA system reported the pressures
at each compressor station and the stored volume of gas in the pipeline, but the system did not
report intermediate pressure or flow readings22 for the main line. None of the main line valves or
cross-connect regulators included position feedback to SCADA. After the rupture, the controllers
18 The line break actuator used pneumatic logic to compare the pressure in the pipeline to the pressure in a
reserve cylinder. When the difference in pressure between the reserve cylinder and the pipeline meets a preset value,
the actuator (gas over hydraulics) closes the mainline valve. Once tripped, the line break actuator has to be reset
manually.
19 C. R. Sparks et al., Remote and Automatic Main Line Valve Technology Assessment, Gas Research Institute
Report No. GRI-95/0101 (Project No. 04-6609 for Gas Research Institute), (San Antonio: Southwest Research
Institute, 1995).
20 SCADA pressure readings from compressor station 20 showed a pressure drop between 5:10 a.m. and
5:12 a.m. from 853.8 psig to 829.5 psig.
21 SCADA pressure readings at compressor station 20 showed a nearly identical pressure drop on the 24-inch
and 30-inch pipelines from 899.7 psig to 813.8 psig between 5:17 a.m. and 7:07 a.m.
22 Some branch connections to customer sites included pressure and flow readings that were viewable over
SCADA and could be used by the control center to examine intermediate conditions.
CORRECTED COPY 8 NTSB/PAB-13/01

<<<PAGE 9>>>

did not know that ASV 20-1 had closed or that the cross-connect pressure regulators had fully
opened.
Line 100 normally operated with frequent flow and pressure changes based on the
demand for gas, and SCADA alarms were set to warn controllers about abnormal conditions.
However, no SCADA alarms were triggered throughout this accident. The Monday morning shift
controller stated that because SCADA showed no alarms, he did not examine the pressure drop
or historical pressure trends until after the second call from emergency responders. The
controller further stated that at the time of the accident, the drop in pressures on the three lines
appeared to be consistent with peak demand and that, without an alarm, the pressure drop alone
was not sufficient to suggest a leak or line rupture. FGT had incorporated both low- and high-
pressure alarm settings and rate-of-change alarms set to detect abnormal operations that resulted
from 20-psig pressure swings. Although none of the three pipeline pressures reached the low
alarm threshold, the pressure change on the 18-inch line after the rupture was above the 20-psig
threshold of the rate-of-change alarm.
A review of the SCADA rate-of-change alarm revealed that it did not trigger because of
the upstream ASV closure and the SCADA scan rate. The rate-of-change alarm was programmed
to alert the controller when a 20-psig difference from the previous recorded pressure was present
over two scans of the pressure sensor (about 8 minutes at this location).
23 Pressure trend data
from the accident indicate that the initial 24-psig drop at the upstream compressor station did not
continue for two full scans of the SCADA system. When ASV 20-1 closed, the upstream pressure
in the pipeline stabilized, resulting in a pressure difference less than 20 psig within the two scans,
so the rate-of-change alarm did not activate.
Examination of the Accident Pipe
About 106 feet of pipe weighing about 5,000 pounds was ejected from the ground in two
pieces. The larger of the two pieces measured about 104 feet long and was found opened up and
folded over onto itself. (See figure 5.) The smaller piece measured 1.6 feet long and came to rest
near the larger piece.
23 FGT stated that the scan rate or time for SCADA to receive updated data from the instrumentation was about
4 minutes on this portion of the system.
CORRECTED COPY 9 NTSB/PAB-13/01

<<<PAGE 10>>>

Figure 5. One hundred four-foot-long section of 18-inch buried pipe that was dislodged from the
ground.
Sample lengths of pipe were taken from each of the four segments of the ruptured
section, including portions of the intact ends (upstream and downstream), and sent to the NTSB
Materials Laboratory for testing and analysis. An examination of the fracture face showed that
the rupture originated between girth welds 1 and 2 and simultaneously traveled upstream and
downstream along the longitudinal seam welds through four girth welds. The fracture origin was
about 30.5 feet downstream of girth weld 1 and was oriented in the 4 o’clock position24
coinciding with the longitudinal seam weld. (See figure 3.)
Tape Coating, Corrosion, and Cracking
Examination of the Polyken 900 (polyethylene) tape revealed deterioration of the
adhesive bond with the pipe surface, with preexisting wrinkles and air pockets or bubbles along
the length of the ruptured section. Beneath the tape wrap, general corrosion and corrosion pitting
were observed on the exterior surface of the pipe. Corrosion pitting damage was observed near
the fracture and at regular 12-inch intervals where the overlapped spiral coating had disbonded
from the pipe. The general and localized pitting corrosion indicated that the cathodic protection
was ineffective in mitigating corrosion damage. Pitting corrosion, as deep as 0.075 inches
(30 percent of the nominal wall thickness), was observed on or near longitudinal seam weld. The
depth of the corrosion, measured at several locations near the origin, resulted in a remaining wall
thickness that was less than the specified minimum. No internal corrosion was observed on the
ruptured pipe section.
Magnetic particle inspections25 conducted on the outer surface of the pipe along and
adjacent to the fracture revealed several colonies of longitudinal cracks. (See figure 6.) These
colonies of cracks were identified on both sides and close to the longitudinal seam weld.
24 Orientation is given as the clockwise position when looking down the pipe in the direction of flow (north to
south). The 12 o’clock position represents the top of the pipe.
25 Magnetic particle inspection is a nondestructive test method for detecting the existence and extent of linear
indications (such as cracks) open to the surface of ferromagnetic materials.
CORRECTED COPY 10 NTSB/PAB-13/01

<<<PAGE 11>>>

Additional colonies of cracks were found on the segment of pipe upstream from the rupture
origin.
Figure 6. Longitudinal cracks and corrosion pits observed below longitudinal weld seam and
upstream of rupture origin.
Further examination of the cracks revealed that they initiated from the bottom of
corrosion pits on the external pipe surface. (See figure 7.) The initial stages of crack
advancement into the pipe wall showed characteristics consistent with environmentally assisted
mechanisms such as near-neutral pH stress corrosion cracking (NNpHSCC)26 or corrosion
fatigue.27 Final stages of crack propagation in the pipe wall exhibited little secondary branching
and was most consistent with NNpHSCC. NNpHSCC and corrosion fatigue are both forms of
environmentally assisted cracking that share many similar metallurgical characteristics.
According to the Canadian Energy Pipeline Association’s Stress Corrosion Cracking,
Recommended Practices, SCC occurs in pipelines with mechanically failed coatings in the
absence of adequate cathodic protection.
28 The same publication indicated that pipe wrapped
with polyethylene tape has the greatest susceptibility to SCC compared to all other coatings. The
problem created by disbonded polyethylene coating and cathodic protection shielding is well
known in the pipeline industry.29
26 Near-neutral pH SCC is a specific form of environmentally assisted cracking that propagates through the
metal grain boundaries with little secondary branching. It was first noted on the polyethylene-tape–coated pipeline
in the TransCanada Pipelines system in the 1980s.
27 Corrosion fatigue is a form of environmentally assisted cracking in materials under the combined actions of
cyclic loading and a corrosive environment.
28 Stress Corrosion Cracking, Recommended Practices, 2nd ed., (Calgary, Alberta: Canadian Energy Pipeline
Association, 2007).
29 Disbondment of the tape coating from the outer pipe wall can result in moisture ingress between the tape and
the steel, promoting corrosion. In this instance, the polyethylene tape no longer separates the pipe wall from a
corrosive environment and the high electrical resistance of the tape shields the surface from receiving the adequate
protective current of the cathodic protection system.
CORRECTED COPY 11 NTSB/PAB-13/01

<<<PAGE 12>>>

Figure 7. (Left) Cross section of colony of six longitudinal cracks (shown in figure 6) identified
by arrows. (Right) magnified view of single crack (about 0.03 inches deep) advancing from
corrosion pit.
The Fracture Origin
Fracture features on the face of the rupture identified the origin area, which measured
about 6 inches long and was on the longitudinal weld seam. The longitudinal weld seam
measured 0.255 inches thick in this region. The fracture face along the origin coincided with a
dark colored region of corroded steel that extended from the outer surface of the pipe to a
maximum depth of about 75 percent of the longitudinal seam weld thickness. (See figure 8.) No
crack arrest features were observed on the fracture face. Two corrosion pits, about 1 inch apart,
were on the outer surface in the corroded region of the fracture origin. Both corrosion pits
measured about 0.2 inches in diameter and extended 0.04 inches into the pipe wall. Closer
examination of the fracture surface near the two corrosion pits revealed radial marks emanating
from the surface of the corroded region toward the inner wall. The corrosion pit at the deepest
portion of the fracture origin included a subsurface crack that extended from the base of the pit.
The fracture emanated from corrosion pits on the outer pipe wall and propagated toward the
inner wall to a depth of 75 percent of the weld seam thickness before the remaining pipe wall
failed from overstress.
The NTSB Materials Laboratory determined that the fracture most likely resulted from
external environmentally assisted cracks along the longitudinal seam weld. The radial markings
on the fracture face show that these cracks emanated from corrosion pits. The darker corroded
region suggests that the crack propagation occurred over a long period before reaching a size that
resulted in the rupture.
CORRECTED COPY 12 NTSB/PAB-13/01

<<<PAGE 13>>>

Figure 8. Scanning electron microscope photograph of a portion of the fracture origin showing
corrosion pit at outer wall and subsurface crack.
Integrity Management
In January 2004, PHMSA issued the gas integrity management rule that established how
pipeline operators should identify, prioritize, assess, evaluate, repair, and validate the integrity of
gas transmission pipelines using multiple assessment methods. This integrity management
approach was directed at protecting high consequence areas (HCA) from catastrophic effects of
ruptured natural gas lines. The integrity management rule required that a pipeline operator
complete a baseline assessment of 50 percent of HCA pipeline mileage by December 17, 2007,
and of 100 percent by December 17, 2012. As part of the integrity management program, an
operator must identify and evaluate all potential threats to HCA segments, collect and integrate
relevant data from the entire pipeline, and conduct a risk assessment in accordance with
ASME B31.8S.30
Class Location
To determine which pipeline segments were covered under the integrity management
rule, FGT used method 2, defined by 49 CFR 192.903,
31 to calculate a potential impact radius
30 ASME B31.8S-2004, “Managing System Integrity of Gas Pipelines;” ASME Code for Pressure Piping, B31
supplement to ASME B31.8.
31 “The area within a potential impact circle containing (i) 20 or more buildings intended for human occupancy,
unless the exception in paragraph (4) applies; or (ii) an identified site.”
CORRECTED COPY 13 NTSB/PAB-13/01

<<<PAGE 14>>>

and identify HCA sites within that radius. FGT reported more than 600 miles of HCA pipeline
segments and 1,138 HCA locations covered under the integrity management program.
The ruptured section was defined by the integrity management group as being in a
Class 1 location with no HCA identified sites.
32 Therefore, FGT did not include the pipeline
section under the integrity management program. However, because HCA segments were located
upstream and downstream of the rupture location, the entire 56.8 miles between compressor
stations was inspected with in-line tools, including the pipe segments that ruptured, as part of the
integrity management baseline assessment.
After the accident, a review of the area was conducted through PHMSA to examine
whether a neighboring high school qualified as an HCA “identified site.” The findings from the
review concluded that the rupture location should have been designated as Class 3 and should
have included an HCA identified site because the potential impact radius (366 feet) intersected
three semi-open structures at the nearby high school.
33 (See figure 9.)
Figure 9. Rupture location shown relative to nearby high school that was determined to fall
within 366-foot potential impact radius.
32 The hydrostatic testing conducted in 1971 qualified line 100 for Class 3 operation; however, at the time of the
accident, the ruptured section was operated as Class 1 by FGT.
33 FGT did not reduce the mainline valve spacing from Class 1 to Class 3 to meet the requirements under
49 CFR 192.179, citing a PHMSA final ruling in the matter of Viking Gas Transmission (1998; CPF 32102).
Because the class change did not require pipe replacement, no mainline valves were required.
CORRECTED COPY 14 NTSB/PAB-13/01

<<<PAGE 15>>>

Integrity Assessments
The FGT risk assessment program in place in 200434 used a total risk methodology
addressing the nine threat categories described in ASME B31.8S and classified threats as either
time dependent, stable, or time independent. Time-dependent threats include external corrosion
and SCC. The total risk was defined as the product of the likelihood of an event multiplied by the
consequence of that event. The likelihood of failure was derived using appendix A of
ASME B31.8S and an internally developed consequence algorithm. The program used a
prescriptive method combined with subject matter expert input to arrive at the total risk value.
The FGT risk assessment procedure stated that the threat of SCC is managed by external
surface coating systems, balanced cathodic protection, minimizing cyclic loading, and operating
below 60 percent specified minimum yield strength (SMYS) (if possible). The procedure noted
that in-line inspection tool effectiveness35 for detecting SCC had not been adequately
demonstrated for gas lines, but the procedure outlined other methods that could be used to assess
susceptibility to SCC, including soil characterization, magnetic particle inspection, pressure
testing, and leak and rupture history.
The FGT 2004 risk assessment spreadsheet showed that the pipeline segments upstream
and downstream of the rupture location had very low risk scores for both the external corrosion
and the SCC categories.36 According to the FGT corrosion engineer, polyethylene-tape–coated
pipe has the highest risk weighting for SCC, but pipeline segments along the Florida peninsula
had no prior history of SCC-related failures.
When SCC was identified as a risk in the relative risk matrix, the FGT 2004 integrity
assessment procedures discussed the use of both direct assessment and hydrostatic spike pressure
testing.
37 FGT stated that hydrostatic spike testing was the approach used for SCC and that direct
assessment was not part of the integrity program.
Appendix A of the 2004 FGT integrity assessment procedure states that the use of spike
testing is the method of choice when confirmed “significant” SCC38 is present and a proven
EMAT tool39 is not commercially available. Without a direct assessment program, the FGT
34 FGT risk and integrity procedures were Cross Country Energy procedures from 2004 until 2006 when the
company was sold to Southern Union Gas (Panhandle Eastern).
35 The FGT integrity assessment procedure lists the electromagnetic acoustic transducer (EMAT) and the
circumferential magnetic flux leakage (MFL) in-line inspection tools as being capable of SCC detection, but each
has limitations on detection capabilities. FGT had not run an EMAT or circumferential MFL tool through line 100
before the rupture.
36 External corrosion relative risk assessment scores were 0.03 for upstream HCA segments and 0.05 for
downstream HCA segments. SCC relative risk assessment scores were 0.001 for upstream HCA segments and 0.003
for downstream HCA segments.
37 The FGT procedures define the spike test as a 30- to 60-minute pressure test to 100 to 110 percent of SMYS
followed by a reduction to 90 percent of SMYS pressure for the remainder of the test.
38 Defined by FGT as deeper than 10 percent of the wall thickness and as long or longer than the critical crack
length of a crack 50 percent through the pipe wall at a stress level of 110 percent of SMYS as defined by the
Canadian Energy Pipeline Association.
39 The EMAT tool is designed to detect crack defects using electromagnetic acoustical transducers. These dry
coupled sensors do not require a liquid couplant like traditional ultrasonic crack detection tools, making the EMAT
tool suitable for gas pipeline inspections.
CORRECTED COPY 15 NTSB/PAB-13/01

<<<PAGE 16>>>

identification of SCC as a threat relied primarily on historical failures or findings from
opportunistic digs. According to the FGT director of integrity management, the ruptured section
had not been identified as susceptible to SCC and therefore was never spike tested.
Line 100 In-line Inspections
In-line inspections were performed on line 100 in 2004 using both a caliper tool to locate
dents and a high-resolution second-generation axial MFL tool to locate metal loss caused by
corrosion. Although axial MFL in-line inspection tools are well suited for detecting metal loss
features in pipelines, they are incapable of accurately detecting longitudinally oriented defects,
including colonies of SCC.
The findings from the 2004 axial MFL in-line inspection of line 100 revealed that most of
the surface indications were adjacent to the longitudinal seam weld. The inspection identified no
corrosion anomalies at the location of the rupture origin. The 2004 MFL final report recorded
maximum corrosion depths of between 0.04 and 0.1 inches at various locations along the
ruptured section; the average peak depth was about 0.051 inches (20 percent of the nominal wall
thickness). None of the reported corrosion anomalies met the immediate criteria for repair. Based
on the findings of the 2004 in-line inspection, FGT performed 12 excavations, all of which were
on pipeline segments between compressor stations 20 and 21. None of these excavations exposed
the ruptured segment. FGT also replaced two segments of pipe downstream from the failure
origin and girth weld 3 (see figure 3). FGT could not provide supporting documentation from the
2004 in-line inspection that led to the replacement of the two pipe segments.
Postaccident Actions
PHMSA
After the accident in Palm City, PHMSA issued a corrective action order (CAO) to FGT
on May 7, 2009; PHMSA later amended the CAO on May 22, 2009. As part of the CAO, FGT
was not allowed to operate line 100 until a written plan to verify the integrity of the pipeline
segments was approved by the PHMSA regional director. Pipe segments from compressor
station 20 through Cutler, Florida, were subject to the verification, which required hydrostatic
spike testing of all low-frequency ERW pipe, the use of the appropriate in-line tools suitable for
finding defects such as the one responsible for the rupture, an evaluation of the pipeline for areas
of damaged or disbonded coating, and a survey of the effectiveness of the cathodic protection
system. When permission to restart the line was granted by the PHMSA director of the Southern
Region on June 2, 2009, the portion of line 100 from compressor station 20 to Cutler, Florida,
was subject to a 20 percent reduction in operating pressure, not to exceed 682 psig. FGT
submitted a return–to-service plan to PHMSA on May 27, 2009 and FGT had restarted line
100 by June 3, 2009.
Florida Gas Transmission
After the accident, FGT reviewed all locations on the pipeline system that had a cross-
connect arrangement similar to that of the accident location. Six looped configurations similar to
the accident site were identified for instrumentation upgrades. FGT installed a pressure
CORRECTED COPY 16 NTSB/PAB-13/01

<<<PAGE 17>>>

transmitter downstream of the regulators at the Jupiter regulator station and pressure transmitters
on each of the parallel lines.
Position sensors were also installed on both regulators, allowing the control center to
monitor the regulating valve states, and a proximity sensor was installed on the cross-connect
valve. Each of these sensors was tied into the SCADA system. Additional functionality was
added to the SCADA system so that the cross-connect valve between the 30-inch and the 18-inch
pipelines would close automatically if a rapid change in the position of the regulator valve
occurred. This added functionality also permits the control center to close the cross-connect
valve remotely. A proximity switch on the cross-connect valve now activates to alert the control
center when the line break actuator trips and the valve closes.
FGT has changed the SCADA rate-of-change alarm methodology. SCADA now alarms
for a rate-of-change equivalent to a pressure drop of more than 32 psig over a 120-second
interval. FGT also conducted an instrument gas leak survey between compressor stations 20 and
21 and increased leak inspection land patrols of the transmission line downstream of the accident
site to the end of the line. These patrols are in addition to aerial patrols.
In response to the PHMSA corrective action order, FGT has conducted cathodic
protection surveys on line 100 from compressor station 20 to the end of the line, inspected the
line for corrosion using a magnetic flux leakage tool and for SCC using circumferential MFL,
and conducted hydrostatic pressure testing of the 56.8-mile stretch between compressor stations
20 and 21. According to FGT, the hydrostatic pressure testing resulted in four failures on the
18-inch line: (1) a failure caused by corrosion in an ERW longitudinal weld seam, (2) a seam
failure related to SCC, (3) a failure caused by corrosion, and (4) a failure caused by mechanical
damage. FGT has performed a subsequent hydrostatic spike test on the segments from
compressor station 20 to ASV 20-2.
Probable Cause
The National Transportation Safety Board determines that the probable cause of the
accident was environmentally assisted cracking under a disbonded polyethylene coating that
remained undetected by the integrity management program. Contributing to the accident was
Florida Gas Transmission Company’s failure to include the pipe section that ruptured in the
integrity management program. Contributing to the prolonged gas release was the pipeline
controller’s inability to detect the rupture because of SCADA system limitations and the
configuration of the pipeline.
Adopted: August 13, 2013
CORRECTED COPY 17 NTSB/PAB-13/01

## Provenance

- Official: Yes
- Source: <https://www.ntsb.gov/investigations/Pages/DCA09FP007.aspx>
- Source ID: `ntsb-pipeline`
- SHA-256: `77e7e9cb3a9b1eb4c05a2582e5eacf5c7e22948a8a1661c6f2bc161724f689aa`
- Retrieved: 2026-08-20T04:57:25.499Z
- Exported: 2026-08-22T12:42:13.356Z
- Document slug: `ntsb-case-dca09fp007`

### Source metadata

```json
{
  "recordKind": "ntsb_pipeline_investigation",
  "mkey": 73776,
  "ntsbNumber": "DCA09FP007",
  "completionStatus": "Completed",
  "caseClosed": true,
  "hasSafetyRecommendation": false,
  "eventType": "Accident",
  "accidentType": "Rupture",
  "operator": "Florida Gas Transmission Company",
  "pipelineType": "Gas Transmission - Regulated",
  "location": {
    "city": "Palm City",
    "state": "FL",
    "country": "USA",
    "latitude": null,
    "longitude": null
  },
  "reportNumber": "PAB-13-01",
  "probableCause": "The National Transportation Safety Board determines that the probable cause of the\naccident was environmentally assisted cracking under a disbonded polyethylene coating that\nremained undetected by the integrity management program. Contributing to the accident was\nFlorida Gas Transmission Company’s failure to include the pipe section that ruptured in the\nintegrity management program. Contributing to the prolonged gas release was the pipeline\ncontroller’s inability to detect the rupture because of SCADA system limitations and the\nconfiguration of the pipeline",
  "events": [
    {
      "eventNumber": 2,
      "sequenceNumber": 2,
      "eventCode": "400450",
      "tier1Number": "400",
      "tier1Name": "System operating",
      "tier2Number": "450",
      "tier2Name": "Product leak/release",
      "isDefiningEvent": true
    },
    {
      "eventNumber": 1,
      "sequenceNumber": 1,
      "eventCode": "400337",
      "tier1Number": "400",
      "tier1Name": "System operating",
      "tier2Number": "337",
      "tier2Name": "Pipe structural malfunction/failure",
      "isDefiningEvent": false
    }
  ],
  "findings": [
    {
      "findingNumber": 3,
      "sequenceNumber": 3,
      "findingCode": "01060013",
      "findingTier1Name": "Pipeline",
      "findingTier2Name": "Pipeline operation/capability",
      "findingTier3Name": "(general)",
      "findingTier4Name": null,
      "findingModifierName": "Incorrect service/maintenance",
      "findingReportText": "Pipeline - Pipeline operation/capability - (general) - Incorrect service/maintenance",
      "findingText": null,
      "inProbableCause": true
    },
    {
      "findingNumber": 4,
      "sequenceNumber": 4,
      "findingCode": "01060015",
      "findingTier1Name": "Pipeline",
      "findingTier2Name": "Pipeline operation/capability",
      "findingTier3Name": "(general)",
      "findingTier4Name": null,
      "findingModifierName": "Inadequate inspection",
      "findingReportText": "Pipeline - Pipeline operation/capability - (general) - Inadequate inspection",
      "findingText": null,
      "inProbableCause": true
    },
    {
      "findingNumber": 5,
      "sequenceNumber": 5,
      "findingCode": "02030044",
      "findingTier1Name": "Personnel",
      "findingTier2Name": "Experience/knowledge",
      "findingTier3Name": "(general)",
      "findingTier4Name": null,
      "findingModifierName": "SCADA operations personnel",
      "findingReportText": "Personnel - Experience/knowledge - (general) - SCADA operations personnel",
      "findingText": null,
      "inProbableCause": true
    },
    {
      "findingNumber": 2,
      "sequenceNumber": 2,
      "findingCode": "01035405",
      "findingTier1Name": "Pipeline",
      "findingTier2Name": "Pipeline structure",
      "findingTier3Name": "Pipe coatings/anti-corrosion",
      "findingTier4Name": null,
      "findingModifierName": "Damaged/degraded",
      "findingReportText": "Pipeline - Pipeline structure - Pipe coatings/anti-corrosion - Damaged/degraded",
      "findingText": null,
      "inProbableCause": true
    },
    {
      "findingNumber": 1,
      "sequenceNumber": 1,
      "findingCode": "01035401",
      "findingTier1Name": "Pipeline",
      "findingTier2Name": "Pipeline structure",
      "findingTier3Name": "Pipe coatings/anti-corrosion",
      "findingTier4Name": null,
      "findingModifierName": "Failure",
      "findingReportText": "Pipeline - Pipeline structure - Pipe coatings/anti-corrosion - Failure",
      "findingText": null,
      "inProbableCause": true
    }
  ],
  "caveat": "Official NTSB investigation data. NTSB findings determine probable cause and make safety recommendations; they do not adjudicate civil liability or regulatory violations.",
  "investigationPageAvailable": true,
  "investigationPageUrl": "https://www.ntsb.gov/investigations/Pages/DCA09FP007.aspx",
  "docketUrl": "https://data.ntsb.gov/Docket/?NTSBNumber=DCA09FP007",
  "reportArtifacts": [
    {
      "id": "ntsb-report-pab1301",
      "title": "PAB-13-01",
      "url": "https://www.ntsb.gov/investigations/AccidentReports/Reports/PAB1301.pdf",
      "pageCount": 17,
      "pdfArtifactPath": "data/sources/ntsb-reports/artifacts/reports/ntsb-report-pab1301.pdf",
      "pdfArtifactSha256": "8b82566123d95af195070ba75bd383b70e51da02109e06f8f462cc811d667d04",
      "extractedTextPath": "data/sources/ntsb-reports/artifacts/reports/ntsb-report-pab1301.txt",
      "extractedTextSha256": "4a245e5eeb200444fc60955cc5fa4c6ee886fcb53470ef042641288c70ea0454",
      "extractionVersion": 2
    }
  ],
  "jurisdiction": "US",
  "operatorName": "Florida Gas Transmission Company",
  "region": "FL"
}
```