# Natural Gas-Fueled Building Explosion and Resulting Fire

**Citation:** DCA14MP002  
**Type / status:** incident / current  
**Agency:** National Transportation Safety Board  
**Effective:** 2014-03-12  
**Published:** 2020-11-13

Pipeline occurrence. in Manhattan, NY, USA. on 2014-03-12

## Document text

NTSB investigation DCA14MP002.

Event Date: 2014-03-12

Event City: Manhattan

Event State Or Region: NY

Event Country: USA

Completion Status: Completed

Probable cause: The National Transportation Safety Board determines that the probable cause of the accident was (1) the failure of the defective fusion joint at the service tee, installed by Consolidated Edison Company of New York, Inc., in 2011, that allowed natural gas to leak from the gas main and migrate into the building where it ignited and (2) a breach in the sewer line that went unrepaired by the New York City Department of Environmental Protection since at least 2006 that allowed groundwater and soil to flow into the sewer, resulting in a loss of support for the gas main, which caused the line to sag and overstressed the defective fusion joint.

Tier1Name: Unknown

Tier2Name: Pipe structural malfunction/failure

Tier1Name: System operating

Tier2Name: Pipe structural malfunction/failure

Tier1Name: System not operating

Tier2Name: Pipe structural malfunction/failure

Tier1Name: Initiating product flow

Tier2Name: Servicing event

Tier1Name: System operating

Tier2Name: Inspection event

Tier1Name: System shutdown

Tier2Name: Emergency shutoff

Tier1Name: Post-release

Tier2Name: Evacuation

Tier1Name: Post-release

Tier2Name: Emergency response

Tier1Name: System operating, changing flow/pressure

Tier2Name: Fire/explosion (post-release)

Tier1Name: System maintenance

Tier2Name: System disabled

Tier1Name: System operating

Tier2Name: Miscellaneous/other

Finding Tier1Name: Organizational

Finding Tier2Name: Management

Finding Tier3Name: Communication (organizational)

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Management - Communication (organizational) - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Oversight

Finding Modifier Name: State/Local agency

Finding Report Text: Organizational - Support/oversight/monitoring - Oversight - State/Local agency

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Joint/weld/seam

Finding Modifier Name: Failure

Finding Report Text: Pipeline - Pipeline structure - Joint/weld/seam - Failure

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Joint/weld/seam

Finding Modifier Name: Design

Finding Report Text: Pipeline - Pipeline structure - Joint/weld/seam - Design

Finding Tier1Name: Personnel

Finding Tier2Name: Experience/knowledge

Finding Tier3Name: Skill/ability

Finding Modifier Name: Pipeline maintenance personnel

Finding Report Text: Personnel - Experience/knowledge - Skill/ability - Pipeline maintenance personnel

Finding Tier1Name: Personnel

Finding Tier2Name: Action/decision

Finding Tier3Name: Information processing/decision making

Finding Modifier Name: Pipeline maintenance personnel

Finding Report Text: Personnel - Action/decision - Information processing/decision making - Pipeline maintenance personnel

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline handling/service

Finding Tier3Name: Securing

Finding Modifier Name: Unintentional use/operation

Finding Report Text: Pipeline - Pipeline handling/service - Securing - Unintentional use/operation

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline operation/capability

Finding Tier3Name: Pipeline integrity/capacity

Finding Modifier Name: Design

Finding Report Text: Pipeline - Pipeline operation/capability - Pipeline integrity/capacity - Design

Finding Tier1Name: Environment/Infrastructure

Finding Tier2Name: Conditions/weather/phenomena

Finding Tier3Name: Precipitation

Finding Modifier Name: Use of related info

Finding Report Text: Environment/Infrastructure - Conditions/weather/phenomena - Precipitation - Use of related info

Finding Tier1Name: Environment/Infrastructure

Finding Tier2Name: Conditions/weather/phenomena

Finding Tier3Name: Precipitation

Finding Modifier Name: Unknown/Not determined

Finding Report Text: Environment/Infrastructure - Conditions/weather/phenomena - Precipitation - Unknown/Not determined

Finding Tier1Name: Environment/Infrastructure

Finding Tier2Name: Task environment

Finding Tier3Name: Pressures/demands

Finding Modifier Name: Awareness of condition

Finding Report Text: Environment/Infrastructure - Task environment - Pressures/demands - Awareness of condition

Finding Tier1Name: Personnel

Finding Tier2Name: Action/decision

Finding Tier3Name: Action

Finding Modifier Name: Other government personnel

Finding Report Text: Personnel - Action/decision - Action - Other government personnel

Finding Tier1Name: Environment/Infrastructure

Finding Tier2Name: Conditions/weather/phenomena

Finding Tier3Name: Precipitation

Finding Modifier Name: Awareness of condition

Finding Report Text: Environment/Infrastructure - Conditions/weather/phenomena - Precipitation - Awareness of condition

Finding Tier1Name: Environment/Infrastructure

Finding Tier2Name: Conditions/weather/phenomena

Finding Tier3Name: Precipitation

Finding Modifier Name: Contributed to outcome

Finding Report Text: Environment/Infrastructure - Conditions/weather/phenomena - Precipitation - Contributed to outcome

Official NTSB investigation data. NTSB findings determine probable cause and make safety recommendations; they do not adjudicate civil liability or regulatory violations.

What Happened
On March 12, 2014, about 9:30 a.m. eastern daylight time, two adjacent multiuse five story buildings were destroyed by a natural gas fueled explosion and resulti ng fire. The buildings were situated on the west side of Park Avenue between East 116th Street and East 117th Street in the East Harlem district of the Borough of Manhattan in New York City. The violent explosion damaged buildings on the east and west side s of Park Avenue and along East 116th and East 117th Streets. The Metro North R ailroad suspended rail service for about 7 1/2 hours on the elevated railway along Park Avenue because of debris from the explosion on the track. Eight people died, more than 50 people were injured, and more than 100 families were displaced from their homes as a result of this accident. The cost to Consolidated Edison Company of New York, Inc. (Con Edison), of equipment damages, emergency response activities, remediation, and replacement exceeded $1.9 million.

What We Found
We determined that the probable cause of the accident was (1) the failure of the defective fusion joint at the service tee, installed by Consolidated Edison Company of New York, Inc., in 2011, that allowed natural gas to leak from the gas main and migrate into the building where it ignited and (2) a breach in the sewer line that went unrepaired by the New York City Department of Environmental Protection since at least 2006 that allowed groundwater and soil to flow into the sewer, resulting in a loss of support for the gas main, which caused the line to sag and overstressed the defective fusion joint.

What We Recommended
As a result of this investigation, We made the following new safety recommendations:
To the City of New York: Implement a written program or procedure to ensure the integrity of your sewer lines, repair breaches in a timely manner, and coordinate with other agencies to identify and address potential soil disruption and voids. (P-15-33)
To Consolidated Edison Company of New York, Inc.:
Revise your plastic pipe fusion welding procedure to require cleaning of the surfaces to be welded with suitable solvents to remove all dirt, water, oil, paint, and other contaminants as recommended in ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings. (P-15-34)
Revise your plastic pipe fusion welding procedure to specify that the solidified beads should be visually examined after completing a joint to ensure the beads are uniformly shaped and sized around the joint as recommended in ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings. (P-15-35)
Provide clear written guidance to the Gas Emergency Response Center staff on the conditions for promptly notifying the New York City Fire Department and provide additional staff training. (P-15-36)
Extend your gas main isolation valve installation program to include strategic locations where long distribution mains currently cannot be isolated, giving priority to pipelines in more densely populated areas. (P-15-37)
To the New York State Public Service Commission: Revise the New York State Department of Public Service gas utility operator program to ensure all elements of the regulations are included in the 5-year audit plan. (P-15-38)

PAR-15-01
<<<PAGE 1>>>

Natural Gas-Fueled Building Explosion and Resulting Fire
New York City, New York
March 12, 2014
Accident Report
NTSB/PAR-15/01
PB2015-104889
National
Transportation
Safety Board

<<<PAGE 2>>>

NTSB/PAR-15/01
PB2015-104889
Notation 8696
Adopted June 9, 2015
Pipeline Accident Report
Natural Gas-Fueled Building Explosion and Resulting Fire
National
Transportation
Safety Board
490 L’Enfant Plaza, S.W.
Washington, D.C. 20594

<<<PAGE 3>>>

National Transportation Safety Board. 2015. Natural Gas-Fueled Building Explosion and Resulting
Fire. Pipeline Accident Report NTSB/PAR-15/01. Washington, DC.
Abstract:
On March 12, 2014, about 9:30 a.m. eastern daylight time, two adjacent multiuse five-story buildings
were destroyed by a natural gas-fueled explosion and resulting fire. The buildings were situated on the
west side of Park Avenue between East 116th Street and East 117th Street in the East Harlem district of
the Borough of Manhattan in New York City. The violent explosion damaged buildings on the east and
west sides of Park Avenue and along East 116th and East 117th Streets. Eight people died, more than 50
people were injured, and more than 100 families were displaced from their homes as a result of this
accident. The accident investigation focused on the following safety issues: the adequacy of Consolidated
Edison’s (Con Edison) quality assurance and quality control procedures for joining plastic pipes, the
effectiveness of Con Edison’s public awareness program, the adequacy of Con Edison’s gas odor report
response, the effectiveness of the New York City Department of Environmental Protection sewer integrity
program, and the effectiveness of federal and state oversight. Safety recommendations are made to the
New York State Public Service Commission, the City of New York, and Con Edison.
The National Transportation Safety Board (NTSB) is an independent federal agency dedicated to promoting
aviation, railroad, highway, marine, and pipeline safety. Established in 1967, the agency is mandated by Congress
through the Independent Safety Board Act of 1974 to investigate transportation accidents, determine the probable
causes of the accidents, issue safety recommendations, study transportation safety issues, and evaluate the safety
effectiveness of government agencies involved in transportation. The NTSB makes public its actions and decisions
through accident reports, safety studies, special investigation reports, safety recommendations, and statistical
reviews.
The NTSB does not assign fault or blame for an accident or incident; rather, as specified by NTSB regulation,
“accident/incident investigations are fact-finding proceedings with no formal issues and no adverse parties … and
are not conducted for the purpose of determining the rights or liabilities of any person.” 49 C.F.R. § 831.4.
Assignment of fault or legal liability is not relevant to the NTSB’s statutory mission to improve transportation safety
by investigating accidents and incidents and issuing safety recommendations. In addition, statutory language
prohibits the admission into evidence or use of any part of an NTSB report related to an accident in a civil action for
damages resulting from a matter mentioned in the report. 49 U.S.C. § 1154(b).
For more detailed background information on this report, visit http://www.ntsb.gov/investigations/dms.html and
search for NTSB accident ID DCA14MP002. Recent publications are available in their entirety on the Internet at
http://www.ntsb.gov. Other information about available publications also may be obtained from the website or by
contacting:
National Transportation Safety Board
Records Management Division, CIO-40
490 L’Enfant Plaza, SW
Washington, DC 20594
(800) 877-6799 or (202) 314-6551
NTSB publications may be purchased from the National Technical Information Service. To purchase this
publication, order product number PB2015-104889 from:
National Technical Information Service
5301 Shawnee Rd.
Alexandria, VA 22312
(800) 553-6847 or (703) 605-6000
http://www.ntis.gov/

<<<PAGE 4>>>

NTSB Pipeline Accident Report
Contents
Figures ........................................................................................................................................... iii
Table ................................................................................................................................................v
Acronyms and Abbreviations ..................................................................................................... vi
Executive Summary .................................................................................................................... vii
1 Factual Information ....................................................................................................................1
1.1 Accident Synopsis ......................................................................................................................1
1.2 Accident Site ..............................................................................................................................2
1.3 Gas Odor Calls to Con Edison ...................................................................................................2
1.4 Emergency Response .................................................................................................................4
1.5 Injuries .......................................................................................................................................5
1.6 Damages .....................................................................................................................................5
1.7 Natural Gas and Other Utilities..................................................................................................6
1.8 Preaccident Activities ................................................................................................................8
1.8.1 Gas Odor Reports ............................................................................................................8
1.8.2 Gas Leak Surveys ..........................................................................................................10
1.8.3 Water Leak Surveys .......................................................................................................10
1.8.4 Sewer Inspections ..........................................................................................................10
1.8.5 Street Cave-ins and Repairs ...........................................................................................11
1.9 Con Edison Operations ............................................................................................................12
1.9.1 Heat Fusion Procedure ...................................................................................................12
1.9.2 Emergency Call Response .............................................................................................13
1.9.3 Pipeline Integrity Management ......................................................................................14
1.9.4 Emergency Preparedness and Response ........................................................................14
1.10 Tests and Research .................................................................................................................15
1.10.1 Materials Laboratory Examination of Accident Pipe and Joint ...................................15
1.10.2 Saddle Fusion Joints ....................................................................................................17
1.10.3 Accident Service Tee ...................................................................................................19
1.10.4 Accident Saddle Joint Fusion Bead Size .....................................................................21
1.10.5 Gas Pipe Size and Dimensional Conformity ...............................................................22
1.10.6 Mechanical and Physical Properties ............................................................................22
1.10.7 Finite Element Modeling .............................................................................................23
1.10.8 Metallurgical Examination of Cast Iron Water Pipe ...................................................23
1.11 Public Awareness ...................................................................................................................25
1.11.1 Regulatory Requirements ............................................................................................25
1.11.2 Con Edison Public Awareness Program ......................................................................26
1.11.3 Con Edison Public Awareness Program Leak Recognition and Response .................27
1.11.4 Con Edison Public Awareness Program Effectiveness ...............................................27
i

<<<PAGE 5>>>

NTSB Pipeline Accident Report
1.12 Regulatory Oversight .............................................................................................................28
1.12.1 Federal Oversight .........................................................................................................28
1.12.2 New York State Oversight ...........................................................................................29
1.12.3 Comparison of Federal and State Regulations .............................................................30
1.13 Postaccident Activities ...........................................................................................................32
1.13.1 FDNY Fire Investigation .............................................................................................32
1.13.2 Con Edison Heat Fusion Procedure Upgrade ..............................................................32
1.13.3 Sewer Inspection and Excavation ................................................................................32
1.13.4 Gas Pressure Tests .......................................................................................................33
1.13.5 Examination of Area Below the Pavement ..................................................................33
1.13.6 New York City Underground Infrastructure Working Group .....................................36
1.13.7 Use of 911 for Gas Odor Calls ....................................................................................37
1.13.8 Plastic Fusion Welder Qualifications ..........................................................................38
1.13.9 New York Public Service Commission Notice of Proposed Rulemaking ...................40
2 Analysis ......................................................................................................................................41
2.1 Water Main Damage ................................................................................................................41
2.2 Sewer Damage .........................................................................................................................41
2.3 Gas Main and Service Tee .......................................................................................................42
2.3.1 Service Tee Failure Examination ...................................................................................42
2.3.2 Fusion Joint Operator Qualification ..............................................................................44
2.4 Con Edison Emergency Call Response ....................................................................................45
2.5 Con Edison Public Awareness Program ..................................................................................46
2.6 Alignment of State and Federal Gas Pipeline Regulations ......................................................46
3 Conclusions ................................................................................................................................48
3.1 Findings....................................................................................................................................48
3.2 Probable Cause.........................................................................................................................49
4 Recommendations .....................................................................................................................50
Appendix A. Investigation ...........................................................................................................52
Appendix B. Timeline ..................................................................................................................53
References .....................................................................................................................................55
ii

<<<PAGE 6>>>

NTSB Pipeline Accident Report
Figures
Figure 1. Buildings on west side of Park Avenue between East 116th and
East 117th Streets before March 12, 2014, accident. ...................................................................... 1
Figure 2. Buildings 1644 and 1646 Park Avenue in New York City after
March 12, 2014, explosion.............................................................................................................. 6
Figure 3. Overhead view of accident block. .................................................................................. 7
Figure 4. Gas main, water main, and sewer main positions below road at gas
service tee location. ......................................................................................................................... 8
Figure 5. Sewer damage on south-facing video frame from October 2006 inspection. .............. 11
Figure 6. Exemplar gas main with service tee welded to it ........................................................ 13
Figure 7. Saddle fusion machine................... .............................................................................. 13
Figure 8. Exemplar service tee showing cutter and seal cap. ...................................................... 15
Figure 9. Accident 8-inch-diameter HDPE service main (top) and HDPE service tee
at left of 2-inch-diameter HDPE service pipe (bottom). ............................................................... 16
Figure 10. Installed configuration of accident 2-inch-diameter service pipe and
8-inch-diameter main. ................................................................................................................... 16
Figure 11. Exemplar saddle fusion joint service tee assembly with a round base
portion and showing three distinct fusion beads. .......................................................................... 17
Figure 12. Inlet face of exemplar service tee that was pressed against heater
adapter plate (heating iron) preheated to about 500°F but not fusion joined to a pipe. ................ 18
Figure 13. Fracture faces after drop weight tests on exemplar service tee inlet fusion
joint from the sound fusion joint (left) and the oil-contaminated fusion joint (right). ................. 19
Figure 14. Upper fracture face (saddle end) recovered from accident saddle fusion joint ......... 20
Figure 15. Fusion joint on 8-inch gas main recovered from accident site. .................................. 20
Figure 16. Exemplar saddle fusion joint service tee assembly with a round base portion
showing three distinct fusion beads. ............................................................................................. 22
Figure 17. Mating fracture faces of 12-inch cast iron water main. .............................................. 24
iii

<<<PAGE 7>>>

NTSB Pipeline Accident Report
Figure 18. North water main pipe segment fracture face showing regions of graphitic
corrosion that appear as dark features adjacent to outer and inner surfaces. ................................ 25
Figure 19. Schematic comparing federal and New York regulatory definitions of
service line leading to a gas meter inside a building. ................................................................... 31
Figure 20. Water containing fluorescent dye flowing into sewer main through damaged
area in east side of sewer main as shown in a video frame from March 28, 2014, inspection. .... 33
Figure 21. Circumferential crack in exposed 12-inch cast iron water main near 8-inch
HDPE gas main. ............................................................................................................................ 34
Figure 22. Eight-inch HDPE gas main, detached service tee, and service line
in front of Building 1642 with closeup of detached service tee. .................................................. 35
Figure 23. Voids and gaps in ground beneath sidewalk in front of Buildings 1642
and 1644. Inset photo shows void above brick basement foundation at Building 1644. .............. 36
iv

<<<PAGE 8>>>

NTSB Pipeline Accident Report
Table
Table 1. Injuries. ..............................................................................................................................5
v

<<<PAGE 9>>>

NTSB Pipeline Accident Report
Acronyms and Abbreviations
API American Petroleum Institute
ASTM ASTM International
Buildings 1642, 1644, 1646 1642, 1644, and 1646 Park Avenue
Call Center Con Edison Customer Service Call Center
CFR Code of Federal Regulations
Con Edison Consolidated Edison Company of New York, Inc.
CSR customer service representative
DOT US Department of Transportation
FDNY New York City Fire Department
FDS Manhattan Fire Dispatch System
GERC Gas Emergency Response Center
HDPE high-density polyethylene
mechanic gas distribution service mechanic
Metro-North Metro-North Railroad
NGA Northeast Gas Association
NTSB National Transportation Safety Board
NYCDEP New York City Department of Environmental Protection
NYCDOT New York City Department of Transportation
NYCRR New York Codes, Rules and Regulations
NYPD New York City Police Department
NYPSC New York Public Service Commission
NYSDPS New York State Department of Public Service
OPS Office of Pipeline Safety
PHMSA Pipeline and Hazardous Materials Safety Administration
psig pounds per square inch, gauge
vi

<<<PAGE 10>>>

NTSB Pipeline Accident Report
Executive Summary
On March 12, 2014, about 9:30 a.m. eastern daylight time, two adjacent multiuse
five-story buildings were destroyed by a natural gas-fueled explosion and resulting fire. The
buildings were situated on the west side of Park Avenue between East 116th Street and
East 117th Street in the East Harlem district of the Borough of Manhattan in New York City. The
violent explosion damaged buildings on the east and west sides of Park Avenue and along
East 116th and East 117th Streets. The Metro-North Railroad suspended rail service for about
7 1/2 hours on the elevated railway along Park Avenue because of debris from the explosion on
the track. Eight people died, more than 50 people were injured, and more than 100 families were
displaced from their homes as a result of this accident. The cost to Consolidated Edison
Company of New York, Inc. (Con Edison), of equipment damages, emergency response
activities, remediation, and replacement exceeded $1.9 million.
The National Transportation Safety Board determines that the probable cause of the
accident was (1) the failure of the defective fusion joint at the service tee, installed by
Consolidated Edison Company of New York, Inc., in 2011, that allowed natural gas to leak from
the gas main and migrate into the building where it ignited and (2) a breach in the sewer line that
went unrepaired by the New York City Department of Environmental Protection since at least
2006 that allowed groundwater and soil to flow into the sewer, resulting in a loss of support for
the gas main, which caused the line to sag and overstressed the defective fusion joint.
The accident investigation focused on the following safety issues:
 Adequacy of Con Edison’s quality assurance and quality control procedures for
joining plastic pipes. A Con Edison contractor installed the service tee in 2011 using
a Con Edison heat fusion procedure for plastic pipe. Postaccident examination of the
separated service tee joint showed fracture features indicating that the surfaces were
contaminated, resulting in a weak joint. Review of the Con Edison plastic pipe fusion
procedure revealed that some industry-standard steps, such as cleaning the surface
with alcohol, were omitted. In addition, inspection of the fusion joint revealed
inconsistent bead sizes.
 Effectiveness of Con Edison’s public awareness program. Con Edison had an
extensive public awareness program that included informing the public and gas
customers to call Con Edison in the event of a suspected gas leak. This information
was included in customer billings, in newspaper advertisements, and in flyers posted
in apartment buildings. However, the investigation found that people who said they
smelled gas the day before the accident did not call Con Edison, the fire department,
or 911.
 Adequacy of Con Edison’s gas odor report response. About 25 minutes before the
accident, Con Edison received a call from a resident of an adjacent building who
reported a gas odor inside and outside of his residence. He said the gas was coming
from one of the accident buildings. During the call, the Con Edison customer service
vii

<<<PAGE 11>>>

NTSB Pipeline Accident Report
representative’s computer stopped responding, which delayed the notifications.
Although a gas service mechanic was dispatched, the fire department was not notified
as required by Con Edison’s response procedure.
 Effectiveness of the New York City Department of Environmental Protection
sewer integrity program. Investigators discovered a large breach in the sewer main
near the destroyed buildings that had gone unrepaired for more than 8 years. They
also learned of recurring major street repair work in the vicinity of the sewer breach
over several years. This work included a repair that was made a few days before the
accident to correct significant ground settling below the pavement in the vicinity of
the gas main and building service lines.
 Effectiveness of federal and state oversight. The state pipeline safety program
certifications in Title 49 United States Code section 60105(a) allow states to inspect
and enforce intrastate pipeline safety. The state must adopt the minimum federal
regulations for pipeline safety. Examination of the New York state pipeline safety
regulations revealed that they are less stringent than the federal regulations in two
areas: definition of service line and pipeline pressure testing. These deficiencies were
not identified by the Pipeline and Hazardous Materials Safety Administration during
state program recertifications.
As a result of this investigation, the National Transportation Safety Board makes safety
recommendations to the New York State Public Service Commission, the City of New York, and
Consolidated Edison Company of New York, Inc.
viii

<<<PAGE 12>>>

NTSB Pipeline Accident Report
1 Factual Information
1.1 Accident Synopsis
On March 12, 2014, about 9:30 a.m. eastern daylight time, two adjacent multiuse
five-story buildings were destroyed by a natural gas-fueled explosion and resulting fire. The
buildings were situated on the west side of Park Avenue between East 116th Street and
East 117th Street in the East Harlem district of the Borough of Manhattan in New York City.
(See figure 1.)
Figure 1. Buildings on west side of Park Avenue between East 116th and East 117th Streets
before March 12, 2014, accident.
The violent explosion damaged buildings on the east and west sides of Park Avenue and
along East 116th and East 117th Streets. The Metro-North Railroad (Metro-North) suspended
rail service on March 12 for about 7 1/2 hours on the elevated railway along Park Avenue
because of debris from the explosion on the track.
Eight people died, more than 50 people were injured, and more than 100 families were
displaced from their homes as a result of this accident. Although the amount of natural gas
released from the distribution system could not be accurately estimated, Consolidated Edison
Company of New York, Inc. (Con Edison) stated that in the worst-case scenario, at the operating
pressure of 8 inches of water column (about 1/3 pound per square inch, gauge [psig]), up to
1

<<<PAGE 13>>>

NTSB Pipeline Accident Report
158 cubic feet of natural gas could be released per minute through the 1 7/8-inch-diameter hole
that was tapped into the 8-inch-diameter high-density polyethylene (HDPE) gas main in front of
Building 1642. The cost of equipment damages, emergency response activities, remediation, and
replacement to Con Edison exceeded $1.9 million.
1.2 Accident Site
The building at 1644 Park Avenue (Building 1644) was a five-story walk-up built about
1898. It contained the Spanish Christian Church, which occupied the basement and the first two
floors, and three residential floors with two apartments on each floor.1 This building had an
oil-fired heating system, with natural gas used for cooking. Five fatalities occurred in this
building. The building at 1646 Park Avenue (Building 1646) also was a five-story walk-up built
about 1898. This building contained a piano store that occupied the basement and the first floor
and four residential floors with two apartments on each floor; one of the eight apartments was
vacant. Three fatalities occurred in this building. The building at 1642 Park Avenue
(Building 1642) had four stories and four apartments and was built in 2011. It was significantly
damaged in the explosion.
1.3 Gas Odor Calls to Con Edison
About 9:06 a.m. on March 12, a resident of Building 1652 called the Con Edison
Customer Service Call Center (Call Center) to report a natural gas odor.2 The caller’s building
was north of and next to Building 1646. (See figure 1.) The caller reported smelling gas both
inside and outside and said that the odor was coming from “another building … right next to
[this one].” The caller further described the odor as coming from a building with a piano store.
During the call, the Call Center computer system stopped responding to the customer service
representative’s [CSR] entries), and the CSR put the call on hold several times. The call took
about 6 minutes to complete. The CSR told the caller to evacuate immediately, and added, “we’ll
be there within 45 minutes.”
At 9:12 a.m., the CSR called the Con Edison Gas Emergency Response Center (GERC)
and spoke with a dispatcher about the gas odor report. Con Edison’s Gas Operations Emergency
Response Plan describes GERC in section 3.2. a. (4) (Con Edison 2014):
The GERC is responsible for the safe and reliable operation of the company’s gas
distribution system. Activities include dispatching and directing gas crews in
response to gas odor reports and other gas system problems, and monitoring
excavation activities in the vicinity of gas transmission mains and
identifying/initiating contingency plans. The GERC coordinates emergency
response efforts associated with incidents on the gas distribution system and
1 The New York City Fire Department (FDNY) determined that the explosion and fire originated inside of
1644 Park Avenue, in the Spanish Christian Church on the first and second floors, when a mixture of natural gas and
air was ignited by an unidentified ignition source (FDNY 2014).
2 See appendix B for a timeline of the activities of Con Edison and first responders beginning with the call to
Con Edison.
2

<<<PAGE 14>>>

NTSB Pipeline Accident Report
implements the incident command system. GERC is responsible for notifying and
receiving information from appropriate federal, state, or local agencies, including
first responders, regarding gas distribution system status. The GERC maintains
the Emergency Contact and Notification list for Gas Operations and first
responders. …
The Con Edison computer system was designed so that data from the call taken by the
CSR—time, location, content—was transmitted to the GERC computer system. In addition, the
Con Edison procedure required the CSR to call GERC to confirm that the key information from
the report was received and correctly understood as it had been entered into the computer. On
March 12, when the CSR called GERC after receiving the gas odor call from Building 1652, she
told the dispatcher that her computer was down, but then she noted that it was back up and said
that she was entering a ticket for an indoor gas leak.3 The dispatcher asked the CSR to call back.
About 9:13 a.m., the CSR made a second call to GERC to confirm receipt by the
dispatcher of the indoor gas leak ticket that she had just entered and to confirm the key
information provided by the caller. During this call, the CSR gave the address and details of the
ticket to the dispatcher. The CSR indicated that the caller had stated that there was a smell of gas
both inside and outside. The dispatcher told the CSR that another ticket, for a report of gas odor
outside, should be entered into the computer.
About 9:15 a.m. the dispatcher called a gas distribution service mechanic (mechanic) who
was about 4 miles away from the location of the gas odor report. The dispatcher told the
mechanic that he would receive two tickets for gas odor, one for inside the building and one for
outside.
About 9:16 a.m. the CSR made a third call to the GERC dispatcher to follow up the
outside gas leak ticket. The CSR told the dispatcher that the computer system was “freezing” and
asked if the ticket for Building 1652 had been received. The dispatcher said that it had not.
About 9:19 a.m. the dispatcher called the New York City Fire Department (FDNY) to
report the gas odor at Building 1652. During the call, the dispatcher said, “Hold up, no, sorry,
hold on one second, hold on, hold on, I’ll call you right back.” After this call, GERC made no
calls to the FDNY before the buildings exploded at 9:30 a.m.
About 9:39 a.m. the GERC operations manager called the Manhattan Fire Dispatch
System (FDS), which is part of the FDNY, to ask whether the FDNY had received any reports of
fire at the Park Avenue location of the gas odor report. The FDNY operator said that there was a
report of a “building that exploded” at Park Avenue and 114th Street, it had “collapsed, and it’s
on fire.” About 9:46 a.m. the operations manager called all Manhattan gas operations personnel
to request that all available personnel respond to the explosion location.
3 A ticket is a work order for a mechanic to investigate a gas odor report.
3

<<<PAGE 15>>>

NTSB Pipeline Accident Report
The GERC operations manager called a gas construction planner about 9:55 a.m. to
discuss where to dig fire banks to stop the flow of natural gas to the two destroyed buildings.4
The operations manager told the planner that he would call back once he determined the distance
from the curb line to the gas mains. About 10:08 a.m. he called the New York State Department
of Public Service (NYSDPS) to report where the fire banks would be located. Fire bank
excavation began in three locations about 10:45 a.m.
By 1:44 p.m. Con Edison had completed the emergency excavations and the necessary
pipe work, mechanics had placed stoppers at three locations, and gas flow to the accident scene
had stopped.
1.4 Emergency Response
Fire department personnel in the fire station at 5th Avenue and West 113th Street,
5 blocks away, heard and felt the explosion and saw a plume of smoke in the direction of
Park Avenue and East 114th Street. The two FDNY companies at the station dispatched trucks,
and the first unit arrived at the scene about 9:34 a.m. Fire suppression and rescue operations
began immediately.
The initial 911 call about the explosion was received at 9:31 a.m. from a witness near the
accident site. The details of the call were forwarded immediately to the FDNY and the
New York City Police Department (NYPD).
Beginning about 10:00 a.m. about 100 patrol officers were at the accident scene to
provide evacuation support, site security, and traffic control. As needed, additional NYPD
resources were dispatched to investigate arson and conduct interviews of victims and witnesses
to the event.
Also about 10:00 a.m., the deputy commissioner for operations in the New York City
Department of Emergency Management arrived at the accident scene and started several
activities. These included removal of debris from the railroad track with the help of Metro-North
and the NYPD and providing heavy equipment and assisting the FDNY in debris search and
removal. Body identification and recovery operations with the office of the chief medical
examiner began later, after the gas flow was stopped.
Sometime between 1:30 p.m. and 2:00 p.m., during fire suppression and recovery
activities, a hole about 18 inches wide opened up on Park Avenue in front of Building 1642 and
began to increase in size. Inside the hole, a high-velocity water stream was spraying against the
overhanging pavement until the water main was shut off at 5:20 p.m. Between 3:00 p.m. and
3:30 p.m., firefighters observed a small explosion in the hole that was most likely fueled by
natural gas. Late that evening, the hole and the area around it were excavated, filled with gravel,
4 Fire banks are trenches or excavations dug to expose gas mains so gas main stoppers can be installed in the
pipes to stop the gas flow.
4

<<<PAGE 16>>>

NTSB Pipeline Accident Report
and covered with steel plates so the FDNY could resume rescue and recovery operations using
heavy excavation equipment.
Fire suppression and recovery activities continued for 6 more days and were concluded
on March 18 about 5:40 p.m.
1.5 Injuries
Eight occupants of the two buildings died in the accident. Several vehicle occupants were
injured when debris from the two buildings fell onto the sidewalk and into the street. In addition,
several people who were near the two buildings were injured by falling debris. In total, 46 people
were transported to local hospitals for treatment for serious or minor injuries.
Two firefighters and 12 police officers were injured during the emergency response. A
New York City contractor who was removing debris after the explosion also sustained a minor
injury. Table 1 summarizes the injuries.
Table 1. Injuries.
Injury Type Civilians Emergency
Responders Total
Fatal 8 0 8
Serious 2 0 2
Minor 44 15 59
Total 54 15 69
a Title 49 CFR 830.2 defines fatal injury as any injury that results in death within 30 days of the accident and serious injury as an
injury that (1) requires hospitalization for more than 48 hours, commencing within 7 days of the date the injury was received;
(2) results in a fracture of any bone (except simple fractures of fingers, toes, or nose); (3) causes severe hemorrhages or nerve or
tendon damage; (4) involves any internal organ; or (5) involves second- or third-degree burns, or any burn affecting more than
5 percent of the body surface.
1.6 Damages
As a result of the explosion, the buildings at 1644 and 1646 Park Avenue collapsed, and
fire erupted in the debris. (See figure 2.) Most of the rear masonry wall of Building 1646
remained standing, with substantial damage. Rescue and recovery operations were hindered by
the risk that the wall might collapse.
5

<<<PAGE 17>>>

NTSB Pipeline Accident Report
Figure 2. Buildings 1644 and 1646 Park Avenue in New York City after March 12, 2014,
explosion.
Building 1642 sustained structural damage from the explosion. The New York City
Department of Buildings determined that it was unsafe for occupancy. The explosion also broke
windows in many nearby buildings.
Explosion debris fell on the railroad tracks of the Metro-North viaduct. As a result,
Metro-North suspended service on the tracks for about 7 1/2 hours to clear the tracks and to
inspect the tracks for damage. Upon service resumption, trains were operated at reduced speeds
through the accident site area as a precaution to protect personnel and reduce vibrations as rescue
and recovery work continued.
1.7 Natural Gas and Other Utilities
Natural gas to the buildings on the west side of Park Avenue between East 116th and
East 117th Streets, including Buildings 1642, 1644, and 1646, was supplied through a buried
8-inch natural gas pipeline (gas main) owned and operated by Con Edison. The low-pressure
(about 8 inches of water column or about 1/3 psig) gas main consisted of 8-inch cast iron pipe,
installed about 1887, and 8-inch high-density polyethylene (HDPE) pipe, installed in 2011. Other
public utilities buried underneath the pavement in the accident block included a water main, a
sewer main, and an electrical conduit. (See figure 3.)
6

<<<PAGE 18>>>

NTSB Pipeline Accident Report
Figure 3. Overhead view of accident block.
The 12-inch cast iron water main, installed about 1887, supplied domestic water,
typically between 45 and 55 psig, to customers on the west side of Park Avenue in the accident
block. The water main was buried about 4 1/2 feet deep. The water main was situated close and
about parallel to the 8-inch natural gas main. The New York City Department of Environmental
Protection (NYCDEP) was responsible for the water main.
The oval-shaped brick-lined sewer main, constructed about 1873, served customers in the
accident block. The sewer main was 32 inches wide by 48 inches high and was situated about
15 feet below the street at the north end, near 117th Street, and about 26 feet below the street at
the south end, near 116th Street. The NYCDEP was responsible for the sewer and for collecting
and treating wastewater.
In 2011, major work was performed in front of 1642 Park Avenue to connect a sewer
lateral and water and gas service lines to the new building.5 The sewer connection involved
digging a trench about 8 feet wide and up to 19 feet deep and connecting an 8-inch sewer lateral
to the existing sewer main. The water service line was installed about 4 feet deep and connected
to the existing 12-inch cast iron water main. According to the contractor, the excavated area was
backfilled and compacted after each installation using material from an approved Department of
Transportation yard, and the street was repaved.
5 A sewer lateral is a service line that connects a building to a main sewer line.
7

<<<PAGE 19>>>

NTSB Pipeline Accident Report
The gas service line for Building 1642 was installed about 3 feet deep and about
18 inches horizontally from the water service line. When a cast iron gas main is exposed in
connection with utility work, such as the sewer and water installations in 2011, Con Edison
policy is to replace the cast iron gas main with HDPE pipe. In the case of Building 1642, in 2011
Con Edison replaced about 72 feet of 8-inch-diameter cast iron pipe with 8-inch HDPE pipe in
the vicinity of the construction area. A 2-inch-diameter HDPE gas service line and a fusion-
welded plastic service tee were connected to the new 8-inch HDPE low-pressure gas main to
supply natural gas to the new building. The vertical separation between the bottom of the HDPE
gas main and the top of the cast iron water main was less than 2 inches in the vicinity of the new
service tee installation. (See figure 4.)
Figure 4. Gas main, water main, and sewer main positions below road at gas service tee
location.
1.8 Preaccident Activities
1.8.1 Gas Odor Reports
During postaccident interviews conducted by the FDNY, several people residing in
Buildings 1642, 1644, and 1646 said that they smelled gas the evening of March 11, 2014 (the
night before the accident). For example, a person living in an apartment in Building 1646 said he
smelled gas about 11:00 p.m., when he went out the front exterior door to throw out garbage. A
bookkeeper for the Spanish Christian Church in Building 1644, who left the church about
8

<<<PAGE 20>>>

NTSB Pipeline Accident Report
9:50 p.m. on March 11, said that she smelled gas outside the church and told the person at the
counter in the deli next door. A woman living in an apartment in Building 1642 said she smelled
gas in her apartment the evening of March 11. She said she smelled gas again in the lobby of the
building about 8:35 a.m. the next day, March 12 (the day of the accident), as she was leaving the
building. However none of these people who said they smelled gas before the accident called the
Con Edison Call Center to report the gas odor.
In addition to the emergency reporting provided through traditional 911 services,
New York City operates a 311 line to provide the public with easy access to New York City
government information and nonemergency services. The 311 system offers users the ability to
access and enter information online, through text messaging, by phone, over Skype, or using a
smartphone application.6
The 311 electronic reporting system does not offer a selection specifically for reporting
natural gas releases or odors, but reports called into the 311 operator are logged into the system.
At the time of the accident, 311 operators directed people with gas odor reports to call the gas
company.
In an interview conducted by the FDNY on April 1, 2014, a resident of Building 1644
said she had called 311 to report “… the gas smell …” the day before the accident. An online
search of the 311 database for Park Avenue addresses between East 116th and East 117th Streets
returned 226 entries; none was a gas odor report. Furthermore, no reports of gas odor were made
to 311 around the time of the accident.
Gas odor reports also may be reported through the NYSDPS. The NYSDPS is the staff
arm of the New York Public Service Commission (NYPSC), which is the state agency
responsible for inspecting natural gas pipelines for the Pipeline and Hazardous Materials
Administration’s (PHMSA) Office of Pipeline Safety (OPS). To better direct gas leak and odor
calls received by the NYSDPS, the department has developed a procedure for reporting
incidents. If a caller is reporting a leak inside a building, the caller is instructed to leave the
building and call the gas company or 911 from a safe location. The caller may follow up with
NYSDPS if further assistance is necessary. If a caller is reporting a gas odor outside, the
department records the call and contacts the gas company while the caller remains on the line. A
copy of the gas odor report is sent to the New York state Office of Gas Safety, which determines
whether followup is required.
6 The 311 system supports payments such as those for parking tickets, dog licenses, and water and sewer bills;
accepts complaints such as those about noise, public hazards, and parking; and provides neighborhood information,
such as the police precinct number and trash and recycling pickup. Online reporting is available for more than 50
languages; the 311 number supports more than 170 languages.
9

<<<PAGE 21>>>

NTSB Pipeline Accident Report
1.8.2 Gas Leak Surveys
In residential districts, Con Edison conducted walking leak surveys using infrared gas
detectors.7 Con Edison conducted these surveys over gas service lines every 3 years and over gas
distribution mains every year. The most recent service line survey before the explosion was
conducted on August 3, 2011. In addition, Con Edison annually conducted mobile 5-mph leak
surveys of distribution mains in nonbusiness areas. The most recent mobile survey of the
accident block was in July 2013. Con Edison also conducted weather-related mobile 15-mph leak
surveys on 4-inch, 6-inch, and 8-inch cast iron pipelines as needed.8 In the month before the
explosion, on February 10 and 28, 2014, Con Edison conducted two of these surveys in the
accident block. No natural gas leaks were detected in the distribution main in the accident block
in any of these three surveys.
1.8.3 Water Leak Surveys
To detect leaks in water distribution lines, the NYCDEP used acoustic equipment to
survey pipes for the noise made by leaking water. The NYCDEP surveyed the water main and
service lines in the accident block six times between January 2012 and March 5, 2014, and no
leaks were detected.
National Transportation Safety Board (NTSB) investigators reviewed the record of calls
to the New York City 311 line between March 20, 2004, and March 20, 2014. No calls reporting
water leaks on the street or into any property basements were made from the accident block
during the 10 years before the accident.
1.8.4 Sewer Inspections
The NYCDEP conducted internal inspections of the sewer main in the accident block
using a video camera. The most recent inspections were conducted on October 16, 2006, and
August 24, 2011. (See figure 5.) Both video inspections show damage to the sewer line in the
same location and to the same extent. The sewer breach was about 12 inches high by about
40 inches wide. The observed damage, shown in figure 5, identified in the October 2006
inspection, is in front of Buildings 1644 and 1646. When the NYCDEP becomes aware of a
sewer breach, it makes a determination either to repair the breach or to monitor it.
7 An infrared gas detector is a device that passes infrared light through an atmospheric gas sampling chamber
and a reference gas chamber to determine the gas concentration in the sample chamber.
8 A weather-related survey is conducted when the weather conditions meet certain parameters that match those
that have resulted in an increased number of cast iron pipe leaks. Examples are temperatures below 32°F and
significant variations in temperature that fluctuate above and below 32°F.
10

<<<PAGE 22>>>

NTSB Pipeline Accident Report
Figure 5. Sewer damage on south-facing video frame from October 2006 inspection.
1.8.5 Street Cave-ins and Repairs
The New York City Department of Transportation (NYCDOT) had performed road repair
work in the accident block on several occasions in the years before the accident. On June 2 and
June 8, 2004, both the NYCDOT and the NYCDEP received similar reports about a cave-in on
Park Avenue between East 116th and East 117th Streets. The NYCDEP wrote in its report that it
had not found the reported cave-in. The NYCDOT repaired the street on December 17, 2004.
Additional reports of a cave-in or depressed pavement on Park Avenue between East 116th and
East 117th Streets were made to the NYCDEP in 2004 and 2007; in 2004, the NYCDOT
reported “a sewer undermining condition,
” and in 2007, the NYCDEP received a report of
depressed pavement. On October 13, 2009, an anonymous caller reported an area of the street at
1646 Park Avenue that had sunk several inches. The NYCDOT inspector noted that the area was
about 7 feet by 20 feet, had sunk 2 to 3 inches, and had been patched previously. On June 3,
2010, a 5-inch-deep depression in front of Building 1644, measuring about 20 feet by 30 feet,
was reported to the NYCDOT. The depressed area included a 10- by 20-foot road patch from a
previous repair. On September 6, 2013, a 9- by 15-foot area of the road that was about 1 inch
deep was repaired with an asphalt patch. On March 9, 2014, an area in front of Building 1646
11

<<<PAGE 23>>>

NTSB Pipeline Accident Report
measuring about 14 feet by 18 feet and about 1 1/2 inches deep was repaired using hot asphalt.
According to the repair foreman, the repaired area was an asphalt patch from a previous repair.
1.9 Con Edison Operations
1.9.1 Heat Fusion Procedure
In 2011, to supply natural gas to the new building at 1642 Park Avenue, a
2-inch-diameter HDPE gas service line and a fusion-welded plastic service tee were connected to
the new 8-inch HDPE low-pressure gas main.9 Con Edison used a saddle fusion joint to connect
the service tee to the gas main. A saddle fusion joint is the welded portion between a service tee
and a pipe. The term also refers to a joint that results when sections of pipe and fittings are fusion
joined and those segments are oriented perpendicular to each other. (See figure 6.) The
Con Edison heat fusion procedure for making a plastic pipe saddle fusion joint is “Heat Fusion
Joining of Polyethylene Plastic Pipe/Tubing Fittings for Gas Mains and Services,” specification
G-8123-12. It is supplemented by “Operation of Butt Fusion and Sidewall Fusion Equipment,”
which provides detailed instructions for operating the saddle fusion machine (shown in figure 7)
and specific fusion parameters for making the saddle fusion joint.10
9 Fusion welding is a welding process in which materials of similar compositions and melting points are melted
together, or fused, to create a strong bond.
10 A saddle fusion machine is an apparatus used to hold and align the fitting to the pipe and the contoured heater
blocks during fusion welding. A butt-fusion joint is the welded portion between two pipe segments that are aligned
end to end.
12

<<<PAGE 24>>>

NTSB Pipeline Accident Report
Figure 6. Exemplar gas main with service Figure 7. Saddle fusion machine.
tee welded to it.
The Con Edison fusion procedure required that the surfaces to be joined be roughened
with emery cloth. The emery cloth leaves behind dirt fragments, but the procedure did not
require the technician to clean the surfaces after using the emery cloth. The procedure also did
not require the technician to use a cleaning solution on the surfaces before fusing the joint. Oil or
other contaminants on the surfaces can result in a weak joint. The industry standard
ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings,
specifies the use of alcohol to clean the surfaces before they are fusion joined.11
1.9.2 Emergency Call Response
In his interview with NTSB investigators, the Con Edison GERC dispatcher received a
call from the CSR at 9:12 a.m. informing the dispatcher that she was entering information from a
gas odor call. The second call from the CSR to the dispatcher occurred a minute later. The
11 ASTM (ASTM International, formerly known as the American Society for Testing and Materials).
13

<<<PAGE 25>>>

NTSB Pipeline Accident Report
dispatcher said he thought the message from the CSR (about a gas odor report on Park Avenue)
was abnormal because it was about a gas odor both inside and outside the apartment. He said
further that GERC has certain conditions that require the CSR to notify the fire department. A
report of a gas odor both inside and outside is one such condition.
The dispatcher said that he considered the situation hazardous, and that is why his fellow
dispatcher called the fire department at 9:19 a.m. However, the dispatcher did not complete the
call about the odor report but promised to call the fire department back, which he never did.
The GERC operations manager told investigators that it was his understanding that the
dispatcher who called the FDNY believed he had provided all the pertinent information, and that
the dispatcher meant to say “good-bye” and not “I will call you back.” The operations manager
further stated that if the call to the fire department had been completed properly, it was his
understanding that the fire department would have dispatched personnel to the reported leak site.
The Con Edison mechanic arrived in the general area of` the accident less than 25 minutes after
he was dispatched, about 9:39 a.m., which was a few minutes after the explosion.
The explosion prompted numerous 911 calls to the fire department. The first FDNY
responders, from a nearby fire station, arrived at the scene less than 3 minutes after the first
911 call.
1.9.3 Pipeline Integrity Management
Con Edison implemented its gas distribution integrity management program in
August 2011. Federal regulations require review of the program every 5 years. Con Edison did
so more frequently, conducting complete plan updates in 2011 and 2012 and an annual update in
2013. Con Edison used a risk scoring process to evaluate and rank the gas distribution system.
Some of the threat types evaluated include corrosion, natural forces, and excavation damages.
The Con Edison policy requires installation of an isolation valve at each street
intersection when a new or replacement pipe is installed. This is intended to improve
Con Edison’s ability to quickly isolate a leaking pipeline and reduce the number of customers
who are disrupted by a gas supply interruption. The isolation valve installation program does not
consider currently installed pipelines, nor does it take into account the length of the pipe or the
population density. The 2011 replacement of cast iron pipe with HDPE pipe on Park Avenue did
not include the installation of an isolation valve, contrary to Con Edison policy.
1.9.4 Emergency Preparedness and Response
Con Edison has developed and maintains various preparedness plans that include training
activities and exercises. The company has conducted at least 38 formal training activities and
drills specific to gas pipeline operations with various New York City emergency services
agencies. In addition, Con Edison has conducted at least one internal unannounced
communications drill involving GERC and Con Edison employees in all regions who respond to
emergencies.
14

<<<PAGE 26>>>

NTSB Pipeline Accident Report
1.10 Tests and Research
1.10.1 Materials Laboratory Examination of Accident Pipe and Joint
The NTSB examined segments of the 8-inch-diameter HDPE gas main, the HDPE
service tee, and the 2-inch-diameter HDPE service line to Building 1642. A special type of
service tee incorporates an internal circular steel cutter. (See figure 8.) This type of service tee
can be installed onto a pressurized main without shutting off the natural gas supply and without
interrupting service to other customers. Figure 9 shows the segments of the accident pipes and
the service tee used to tap into the gas main.
Figure 8. Exemplar service tee showing cutter and seal cap.
15

<<<PAGE 27>>>

NTSB Pipeline Accident Report
Figure 9. Accident 8-inch-diameter HDPE service main (top) and HDPE service tee at left of
2-inch-diameter HDPE service pipe (bottom).
Figure 10 shows the positions of the accident HDPE service main, service tee, and HDPE
service line relative to each other as they were installed. The service tee was attached to the top
of the 8-inch-diameter main by a saddle fusion joint. Preliminary visual examination of the
separated joint between the service tee and the gas main revealed a fracture in the saddle fusion
joint. The service tee also contained a crack at the lower corner outlet portion that leads to the
service line. (See Crack “c” in figure 9.)
Figure 10. Installed configuration of accident 2-inch-diameter service pipe and 8-inch-diameter
main.
16

<<<PAGE 28>>>

NTSB Pipeline Accident Report
1.10.2 Saddle Fusion Joints
Making a saddle fusion joint includes the following three essential steps: the two surfaces
to be joined are roughened with emery cloth, both surfaces are heated simultaneously using a hot
plate preheated to between 475°F and 525ºF under pressure, and then the two surfaces are joined
under pressure. The heat fusion process for making a saddle fusion joint produces three distinct
fusion beads: tee bead, pipe bead, and heating iron bead. (See figure 11.)
Figure 11. Exemplar saddle fusion joint service tee assembly with a round base portion and
showing three distinct fusion beads.
After the saddle fusion joint cools to ambient temperature and the service pipe is installed
downstream of the service tee to a closed valve, the internal steel cutter of the service tee is
screwed into the gas main using a wrench. This cuts a hole in the plastic gas main. The cutter is
then backed out of the new hole and into the top of the service tee, allowing gas to flow through
the service tee into the downstream pipe. The wrench is removed from the cutter and the service
tee cap is installed.
As a part of the investigation, several experiments and exemplar saddle fusion joints were
made at Georg Fischer Central Plastics facility in Shawnee, Oklahoma, using a service tee of the
same model and material as the accident tee.12 The fusion machine, heater plate, and heater
12 Georg Fischer Central Plastics is the manufacturer of the service tee that was involved in the accident.
17

<<<PAGE 29>>>

NTSB Pipeline Accident Report
adapter plates with serrated surfaces were the same model as those that were used to make the
saddle fusion joint involved in the accident.
In one experiment, the surfaces of the pipe and the service tee to be joined were heated
with heater adapters with serrated surfaces, but the pipe and the service tee surfaces were not
joined, and the parts were allowed to cool to room temperature. Figure 12 shows the serrated
impression pattern on the service tee inlet consistent with the serrated pattern of the heater
adapters.
Figure 12. Inlet face of exemplar service tee that was pressed against heater adapter plate
(heating iron) preheated to about 500°F but not fusion joined to a pipe.
In another experiment, the surfaces of an exemplar pipe and exemplar service tee were
heated using heater adapters with serrated surfaces and joined using the fusion joining procedure.
Another set of an exemplar pipe and service tee had a soybean oil mold release agent sprayed on
the surfaces to be joined and the heater adapters to simulate contamination in the fusion joint.
Both sets of exemplar pipes and tees were then heated and joined using the fusion joining
procedure. The service tee fusion joint correctly made and the joint that was contaminated before
joining were subjected to drop weight tests.
13 In the drop weight test, which is designed to cause
a fracture in a fusion joint, including correctly made joints, a 40-pound weight is dropped from a
height of 4 feet. Both service tee fusion joints fractured through the fusion interface (that is,
between the tee bead and the pipe bead) as intended. The mating fracture faces of the correctly
made joint were smooth, indicating complete fusion. In contrast, the joint that had contaminated
surfaces exhibited a radial band pattern consistent with incomplete fusion. (See figure 13.)
Incomplete fusion results in a weak bond.
13 The drop weight test is one of a series of tests used by industry for qualification of polyethylene saddle-fused
joints. “Standard Practice for Qualification of Polyethylene Saddle-Fused Joints,” ASTM F905.
18

<<<PAGE 30>>>

NTSB Pipeline Accident Report
Figure 13. Fracture faces after drop weight tests on exemplar service tee inlet fusion joint from
the sound fusion joint (left) and the oil-contaminated fusion joint (right).
1.10.3 Accident Service Tee
Postaccident examination of the service tee revealed that the service tee-to-pipe fusion
joint was completely separated. The service tee also contained a crack in the lower corner of the
tee outlet. (see “Crack c” in figures 9 and 14.) The two faces of the joint fracture are shown in
figures 14 and 15.
19

<<<PAGE 31>>>

NTSB Pipeline Accident Report
Figure 14. Upper fracture face (saddle end) Figure 15. Fusion joint on 8-inch gas main
recovered from accident saddle fusion joint. recovered from accident site.
The upper face of the fracture showed fracture features in eight regions (labeled
1 through 8). The fracture intersected the fusion interface between the tee bead and the pipe bead
through about 60 percent of the circumference of the service tee fracture face. This arc length
around the separated saddle fusion joint exhibited a radial band pattern consistent with
incomplete fusion, which is a weld defect. The radial band pattern extended into regions 1 and 2.
On the upper fracture face the radial band pattern in region 2 was obliterated by mechanical
damage. The dashed line in region 2 in the lower right quadrant indicates a portion of the fracture
face (in region 5) that extended underneath region 2. The curved rib markings in regions 3 and 5
show the general direction of crack propagation (indicated by arrows), consistent with a crack
that propagated away from the radial band portion of the fracture in regions 1 and 2. Region 4 is
located at the fractured tee bead portion and contains elongated fibrils.14 Region 6 contains
features consistent with void coalescence. Regions 4 and 6 are both consistent with final
overstress fracture. The fracture portion in region 7 contained Wallner lines and rib marks
consistent with a fracture that generally propagated radially outward.
15 Region 8 contains coarse
14 A fibril is polymer drawn out and oriented into an elongated filament.
15 Wallner lines are regular, periodic lines on a fracture surface caused by the interaction of reflected stress
waves with the front of a propagating crack. The curvature of the lines often indicates the general direction of
fracture propagation. Rib marks are prominent randomly spaced lines on a fracture face that typically are indicative
of crack arrest or changes in crack velocity. The curvature of rib marks often indicates the general direction of
fracture propagation.
20

<<<PAGE 32>>>

NTSB Pipeline Accident Report
white dimple features and the longest fibril typical of ductile deformation, consistent with its
being the last portion of the fusion joint to fracture.
The coiled plastic portion in the center, at the bore, in figure 15 is a remnant of the gas
main from the tapping process. The radial band pattern is visible on this side of the fracture face,
and extends into regions 1 and 2. The Con Edison fusion procedure requires that the surfaces to
be joined are roughened with emery cloth. The surface of the pipe in the area of the fusion joint
exhibited a rough texture consistent with a surface that had been roughened with emery cloth.
The surface texture of the fusion beads shows a serrated pattern consistent with the use of a
serrated heater adapter to heat the surfaces to be joined.
The accident service tee also contained a crack at the corner junction between the main
body and the service line fitting. (See “Crack c” in figures 9 and 14.) The crack extended through
the thickness of the tee wall. The circumferential crack on the outer surface was about 3 inches
long on the outer surface and 2.3 inches long on the inner surface. The widest portion of the
crack measured about 0.08 inch and was located at the bottom of the tee outlet.
The fracture features indicated that the crack emanated from the outer surface at the
lower corner fillet (relief radius) between the vertical tube portion of the tee and the horizontal
outlet portion of the tee that leads to the service line. The fracture extended up and through the
wall thickness of the horizontal outlet portion of the tee, then propagated laterally to both sides
of the tee. Examination of the fracture features showed that some locations had evidence of
parallel (step-like) lines that were oriented perpendicular to the direction of fracture propagation,
consistent with Wallner lines. The fracture face exhibited features consistent with an overstress
fracture. The fracture face of the crack at the bottom corner of the outlet exhibited round or
volcano-like crater fracture features that were similar to those found in portions of the fracture
face of an exemplar saddle fusion joint that was subjected to drop weight testing.
1.10.4 Accident Saddle Joint Fusion Bead Size
According to the Con Edison joint fusion specifications for the 8-inch-diameter main and
service tee combination, the proper size of the tee bead that extends entirely around the service
tee should be between 3/16 inch (0.1875 inch) and 1/4 inch (0.25 inch). This size requirement
applies only to a molten tee bead as it is squeezing out between the joint tee and the heater
adapter during the fusion process and is also referred to as the “melt bead size.” This size
requirement does not apply to any of the beads after they have cooled. (See figure 16.)
21

<<<PAGE 33>>>

NTSB Pipeline Accident Report
Figure 16. Exemplar saddle fusion joint service tee assembly with a round base portion
showing three distinct fusion beads.
On the accident main and the service tee, the sizes of the three solidified fusion beads
were measured at 12 locations about evenly spaced around the circumference of the separated
saddle fusion joint. The sizes of the solidified beads around the joint were not uniform. The size
of the tee bead measured between 0.133 and 0.180 inch, the size of the pipe bead measured
between 0.041 inch and 0.165 inch, the size of the iron bead measured between 0.048 inch and
0.182 inch. Industry standards, such as ASTM D2657, Standard Practice for Heat Fusion of
Polyolefin Pipe and Fittings, indicate that the beads should be uniformly shaped and sized all
around the joint.
1.10.5 Gas Pipe Size and Dimensional Conformity
NTSB investigators measured the dimensions of the 8-inch main and the 2-inch service
line in accordance with ASTM D2513, Standard Specification for Thermoplastic Gas Pressure
Pipe, Tubing and Fittings, and ASTM D2122, Standard Test Method for Determining
Dimensions of Thermoplastic Pipe and Fittings. For each pipe they measured the average outer
diameter and the thickness. They also calculated the variation in pipe wall thickness around the
circumference of each pipe. All of these, for both the 2-inch pipe and the 8-inch pipe, were
within the ranges specified in the ASTM standards.
1.10.6 Mechanical and Physical Properties
NTSB investigators removed plastic material samples from the gas main and the service
tee for testing. They tested the samples to determine the tensile strength at yield and elongation
at break. They analyzed the samples to determine melt flow indexes, carbon black contents,
densities, melting temperatures, and molecular weight distributions and to obtain Fourier
transform infrared spectra.
16 The results indicated that the material properties were consistent
with HDPE.
16 Fourier transform infrared spectroscopy is used to identify the composition of polymeric and organic
materials.
22

<<<PAGE 34>>>

NTSB Pipeline Accident Report
1.10.7 Finite Element Modeling
Finite element modeling17 was used to study possible loading scenarios applied to the
plastic pipe assembly. A three-dimensional finite element model of the main pipe, service tee,
and service line was constructed using specification drawings and measurements of the accident
parts. The lengths of the main pipe and service line varied for different load cases examined. The
stress-strain behavior of the HDPE material in the assembly was extracted from tensile tests of
samples taken from the accident parts. A failure strain was calculated from the tensile test and
validated using a finite element model of a test on an exemplar main pipe/service tee assembly
that was loaded in combined bending and tension.
Two zones of cracking in the pipe assembly were of interest. The first zone of cracking
was in the saddle fusion joint between the main pipe and the service tee. The second zone of
cracking was at the lower corner outlet portion leading to the service line. All of the loads were
applied quasi-statically.
Five of the nine loading cases examined simulated sagging during normal service as a
result of loss of support from the surrounding soil coupled with deadweight loads from the soil
and pavement above the gas main. The finite element modeling showed that the loads from
sagging in normal service were unlikely to cause the crack in the service tee body.
Four of the nine cases applied higher loads or displacements that could have been
introduced during postaccident excavation. The loads simulating the postaccident excavation
were large enough to cause the service tee body crack.
For either of the assumed initial separations at the saddle fusion joint, it was possible for
the remaining ligament (regions 3 through 6, or regions 4 through 6 in figure 14) to carry
sufficient load to allow the crack to initiate in the service tee body. In addition, the modeling
showed that sagging of the gas main in normal service would open a portion of the assumed
initial separation by about 0.05 inch to 0.10 inch.
1.10.8 Metallurgical Examination of Cast Iron Water Pipe
The NTSB examined the 12-inch-diameter cast iron water main, which contained a
circumferential crack. About 2 inches of the circumference at the bottom of the pipe remained
intact when the pipe was excavated. Metallographic examination of a polished and etched
specimen taken from an arbitrary location of the water main showed evidence of graphite flakes
consistent with the microstructure of cast iron. Chemical analysis of the sample taken from the
pipe was consistent with the composition of gray cast iron, which is typical for pipe used in
natural gas service.
17 Finite element modeling is a simulation of a structure under applied loads using a computer model of its
geometry and material properties. A finite element model consists of a virtual assembly of many simplified structural
elements used to approximate a complex structure. The behavior of the complex structure is then calculated by
combining the actions of the interconnected simpler elements.
23

<<<PAGE 35>>>

NTSB Pipeline Accident Report
Small sections of the pipe were cut for further evaluation. The wall of the 12-inch cast
iron pipe measured between 0.62 inch and 0.71 inch thick. Tubercles as thick as 1 inch were
observed on the inside surface of the pipe.18 Two ring segments about 6 inches long that included
each side of the separation were cut from the pipe. (See figure 17.) After the segments and
fracture faces were extensively cleaned, small black-brown oxide-like features were observed on
the bottom half of the fracture face in isolated areas. (See figure 18.)
Detailed examination of the north face of the separated joint revealed areas adjacent to
the inner and outer pipe surfaces that exhibited black regions consistent with graphitic
corrosion.19 Graphitic corrosion extended through the pipe wall at about the 4 o’clock,
10 o’clock, and 12 o’clock positions. In general, graphitic corrosion on the inner surface of the
pipe was greater than that on the outer surface. In several areas of the pipe, graphitic corrosion
on the inner surface extended to as much as 50 percent of the wall cross section.
Figure 17. Mating fracture faces of 12-inch cast iron water main.
18 Tubercles are knoblike mounds resulting from localized corrosion. They can grow into tubes or plates, which
can, in time, occlude the entire pipe interior.
19 Graphitic corrosion is selective leaching of iron from gray cast iron or conversion of iron to corrosion
products, where iron matrix are removed and a network of graphite flakes remain intact.
24

<<<PAGE 36>>>

NTSB Pipeline Accident Report
Figure 18. North water main pipe segment fracture face showing regions of graphitic corrosion
that appear as dark features adjacent to outer and inner surfaces.
1.11 Public Awareness
1.11.1 Regulatory Requirements
Title 49 Code of Federal Regulations (CFR) 192.616 requires local gas distribution
companies to have a written continuing public education program. Part of the objective of a
public education program is to increase the awareness of the affected public and stakeholders of
the presence of gas pipelines and to help the public understand what actions can be taken to
respond to pipeline emergencies. The programs are required to follow the general
recommendations in the American Petroleum Institute (API) recommended practice, Public
Awareness Programs for Pipeline Operators, API RP 1162, 2003. Part 192 requires the public
awareness programs to educate both the public and appropriate government organizations about
the hazards associated with unintended releases from gas pipelines, the physical indications that
a release may have occurred, the steps that should be taken for public safety in the event of a gas
pipeline release, and the procedures for reporting natural gas releases.
API RP 1162 covers public awareness for both intrastate and interstate natural gas and
hazardous liquid pipelines and for local distribution and gathering systems. It is divided into
eight sections that cover program development, intended audiences, message content and
25

<<<PAGE 37>>>

NTSB Pipeline Accident Report
delivery methods, supplemental enhancements to the program, program documentation and
record keeping, and evaluation of program effectiveness. A public awareness program should be
evaluated to determine whether the program is effective in meeting the objectives documented in
the program so that pipeline operators can measure the success of the program and implement
needed improvements. The recommended practice identifies four areas for measuring the
effectiveness of a public awareness program:
 Is the information reaching its intended audience?
 Is the audience understanding the message from the operator?
 Is the audience acting in accordance with the information supplied to them?
 Is the program resulting in fewer accidents such as in the case of excavation damage?
These “evaluations of effectiveness of program implementation,” should be conducted not more
than 4 years apart.
1.11.2 Con Edison Public Awareness Program
The Con Edison public awareness program was developed from a template developed by
the Northeast Gas Association (NGA). The template, Regional Public Awareness and Education
Program for Gas Distribution and Transmission Pipelines, follows the requirements in 49 CFR
192.616 and incorporates all of the elements covered by API RP 1162. Con Edison tailored the
NGA template specifically for its operations with the addition of appendices. The Con Edison
public awareness program was first released in June 2006; the most recent version (revision B2),
which was in effect at the time of the accident, is dated July 2012.20 The document covers
stakeholder audiences, message type and content, frequency and method of message delivery,
supplemental program materials, and evaluation of the program. The appendices are updated
continuously as new content is delivered to stakeholders or new program evaluations are added.
The Con Edison program states that its overall goal is to enhance public, environmental,
and property protection through increased public awareness and knowledge. Two key elements
of the public awareness program include educating stakeholders on how to notify the pipeline
operator in the event of an emergency or with general questions or concerns; and educating
stakeholders on how to respond safely to a pipeline emergency. The stakeholder audiences
identified are the affected public, emergency officials, local public officials, and excavators. The
definition of each audience follows those in API RP 1162.
20 The program was revised in January 2009 (Rev. A), April 2011 (Rev B), November 2011 (Rev. B1) and July
2012 (Rev. B2).
26

<<<PAGE 38>>>

NTSB Pipeline Accident Report
1.11.3 Con Edison Public Awareness Program Leak Recognition and Response
The Con Edison public awareness program includes the following regarding pipeline leak
recognition and response:21
“What should you do if you suspect a leak?”
 Move to a safe environment,
 Call 1-800-75-CONED (1-800-752-6633),
 Do not strike match, use telephones, switch on/off appliances, lights, or even a
flashlight in the area where you smell gas. These items can produce sparks
that might ignite the gas and cause an explosion.
Before March 2014, the Con Edison public awareness communications did not include
the information that the public could report suspected natural gas leaks to the fire department, the
police department, or to the 911 emergency telephone number. The materials stressed the
importance of contacting the company in the event of a gas leak. The public awareness materials
directed only to excavators stated that blowing gas should be reported as an emergency to 911.
After the March 12, 2014, accident, Con Edison added to its public awareness materials
and communications the information that the public could report suspected natural gas leaks to
the fire department through the 911 emergency number. The company also launched a new
public awareness campaign in March 2014: “Smell Gas Act Fast.” This new message notes that
members of the public may report suspected gas leaks to 911 or 1-800-75-CONED. To reach its
customers in master-metered buildings, Con Edison mailed bilingual (English and Spanish)
“Smell Gas. Act Fast.” peel-and-sniff postcards to about 1 million households.22 Materials for the
new campaign are provided in English, Spanish, Chinese, Korean, Russian, and Haitian Creole.
1.11.4 Con Edison Public Awareness Program Effectiveness
Northeast Gas Association Evaluations
Con Edison contracts with the NGA to evaluate the effectiveness of its public awareness
program every 4 years. The evaluations measure four areas of the program: outreach,
understandability of the message, behaviors by the intended audience, and measurable results.
The NGA evaluated the Con Edison program in 2006, 2010, and 2014.
21 “Regional Public Awareness and Education Program for Gas Distribution and Transmission Pipelines,”
revision B2, July 17, 2012; page 13.
22 A master-metered building is one where multiple users share a common meter and pay for their utilities based
on some measure other than their specific use, These can be apartment buildings, condos, shopping malls, and office
buildings.
27

<<<PAGE 39>>>

NTSB Pipeline Accident Report
In 2013, GreatBlue Research conducted the Pipeline Media Ad Campaign Evaluation
Study that evaluated the effectiveness of five areas of public awareness for all NGA member
companies. The study surveyed a sample of 538 people; the Con Edison territory represented
65 respondents (up from 58 respondents in 2012). Particularly relevant to this accident are the
answers of Con Edison respondents to the question, “If you did detect a natural gas leak, what
would you do?” Forty-nine percent said they would call 911, whereas 40 percent said they would
call the natural gas company or the pipeline operator. These percentages represent an increase
over the previous year. In 2012, 32.8 percent said they would call 911, and 31 percent said they
would call the gas company.
New York State Department of Public Service Assessment
After the accident, NYSDPS investigators interviewed tenants living along Park Avenue
between East 116th and East 117th Streets, as well as people associated with the church and the
businesses that operate within the buildings. Interviewees were asked whether they recalled the
public awareness information sent to them from Con Edison and the numbers they would call to
report natural gas odor. Seven of the 11 people interviewed said that to report gas odors they
would call the fire department. Some of the interviewees expressed confusion over whether odor
alone was an emergency. One tenant said he did not call 911 when he smelled gas because he did
not realize it was a dangerous condition. Another tenant told investigators that he would call
Con Edison to report odors because “that is the information provided.” One tenant said the smell
of gas would not have prompted him to call 911 because he associates 911 with a fire
emergency.
Several interviewees were aware that Con Edison has a specific phone number
(1-800-75-CONED) to report gas safety issues, and they noted that the number is not easy to
remember. Most interviewees were aware of the safety information included in Con Edison
utility bills, but they did not read the information. One of the tenants interviewed was a
roommate of the primary leaseholder and never saw the gas bill or the safety inserts. Many could
not recall seeing any information about gas safety in newspapers, billboards, television, or radio,
although Con Edison also uses those methods to inform the public. None of the people
interviewed mentioned seeing information about gas safety posted on the bulletin boards inside
the main doors of their buildings.
1.12 Regulatory Oversight
1.12.1 Federal Oversight
The Pipeline and Hazardous Material Safety Administration (PHMSA) in the
US Department of Transportation (DOT) oversees the national regulatory program for the safe
transportation of natural gas through the OPS. After the passage of the Natural Gas Pipeline
Safety Act of 1968, the OPS established minimum safety standards for natural gas transmission
and distribution pipeline operators under 49 CFR Part 192. Federal pipeline safety regulations
include a provision for states to assume regulatory, inspection, and enforcement responsibilities
for intrastate pipeline systems under an annual certification program administered by PHMSA.
28

<<<PAGE 40>>>

NTSB Pipeline Accident Report
1.12.2 New York State Oversight
The state pipeline safety program certifications in Title 49 United States Code
section 60105(a) allow states, which perform annual certification through the US Secretary of
Transportation, to inspect and enforce intrastate pipeline safety. When qualifying for
certification, a state must adopt the minimum federal regulations for pipeline safety. However,
states may mandate more stringent safety regulations as long as they are not in conflict with the
established federal minimum standard.
The New York state natural gas pipeline safety regulations are contained in the New York
Codes, Rules and Regulations (NYCRR), which comprises all state agency rules and regulations
adopted under the State Administrative Procedure Act. The state laws governing natural gas
transmission and distribution are contained under Title 16 NYCRR Chapter III, Subchapter C,
Part 255, “Transmission and Distribution of Gas.”
Natural gas distribution safety and oversight under Part 255 of the NYCRR is the
responsibility of the NYPSC. The NYPSC is certified by the US Secretary of Transportation as
the state agent responsible for inspecting both interstate and intrastate natural gas and hazardous
liquid pipelines for the OPS.23 The NYPSC oversees about 49,000 miles of distribution pipeline
and about 3,400 miles of transmission pipeline. The NYSDPS is the staff arm of the NYPSC and
is responsible for developing an inspection program and conducting intrastate inspections of
regulated state operators. The NYSDPS has a written annual plan and a 5-year plan for
conducting these inspections, which inspect operations and maintenance functions primarily. In
the 5-year plan, inspections are based on risk categories, that is, high, moderate, and low risk.
Requirements considered high risk are inspected every year, those considered moderate risk are
inspected every 3 years, and low-risk conditions are inspected every 5 years. In addition, all
issues identified from a previous audit are addressed to determine compliance.
In the 5-year plan, each section of the state code is assessed by a records audit or a field
inspection. Records audits are performed at the pipeline operator’s office and may include areas
such as operations procedures and leak survey records. NYSDPS inspectors conduct field
inspections at an operator’s job site. Inspectors conduct unannounced visits to a construction site
or operations activity and observe the work being performed and review the work against the
operator’s written procedures and state regulations. In addition, inspectors check the
qualifications of workers for performing covered tasks.24 Further, the NYPSC (through the
NYSDPS) conducts field inspections to evaluate compliance with the operator (staff)
qualification program. However, the 5-year plan did not specifically address audits of operator
qualifications.
Field inspections are a means of observing covered tasks and whether the tasks are being
performed as required under the procedure and by qualified individuals.25 When visiting a
23 New York is one of eight states that act as the PHMSA agent for the inspection of interstate pipelines. The
OPS enforces the federal regulations.
24 Covered task is defined in 49 CFR Part 192 Subpart N and 16 NYCRR 255.3(40).
25 Qualified is defined in 49 CFR Part 192 Subpart N and 16 NYCRR 255.604.
29

<<<PAGE 41>>>

NTSB Pipeline Accident Report
construction site, NYSDPS inspectors ask to see operator qualification cards. Previous NYSDPS
inspections have cited Con Edison for operator-qualification lapses, but none of the citations
were for plastic fusion work. Also, the NYPSC reported no violations in this area in the 5 years
before this accident.
1.12.3 Comparison of Federal and State Regulations
In the course of the investigation, NTSB investigators reviewed NYCRR Title 16,
Part 255 and compared it with the federal minimum standards of 49 CFR Part 192, which are
incorporated by reference under NYCRR Title 16, Part 10.2. Investigators identified at least two
subsections of the state regulations that were less stringent than the federal regulations. These
included the definition of “service line” and pressure test requirements for short sections of
newly installed pipe.
Service Line Scope Inside a Building
Under 49 CFR Subpart A, 192.3, PHMSA defines service line endpoint as “the outlet of
the customer meter or … the connection to a customer’s piping, whichever is further
downstream, ….” Contrary to the PHMSA definition, under NYCRR Title 16 part 255.3, when
the meter is inside the building, the service line ends at the first indoor valve: “Service line means
the piping … that transports gas below grade from a main or transmission line to the first
accessible fitting inside a wall of the customer’s building where a meter is located within the
building ….
”
In the federal definition of a service line, the operator remains responsible for the
maintenance and leak survey of the service line up to the outlet of the gas meter. Under the New
York state regulation, the operator’s responsibility to maintain a service line ends at the first
fitting inside the building wall, so the operator is not responsible for leak survey or maintenance
of the service line between the first fitting inside the building and the outlet of the gas meter.
(See figure 19.) Although this discrepancy in the state regulations is not related to this accident
investigation, the NTSB is concerned because the discrepancy means that significant lengths of
natural gas service pipe and associated pipe fittings inside buildings may not be adequately
maintained or inspected. Therefore unsafe conditions such as leaks or improper pipe installations
inside affected buildings could go undetected.
30

<<<PAGE 42>>>

NTSB Pipeline Accident Report
Figure 19. Schematic comparing federal and New York regulatory definitions of service line
leading to a gas meter inside a building.
Plastic Pipe Pressure Test Requirements
For testing plastic pipe, 49 CFR 192.513(c) requires that “the test pressure must be at
least 150 percent of the maximum operating pressure or 50 psig, whichever is greater. …” and
does not provide any exceptions for the length of the pipe.
For testing plastic pipe, 16 NYCRR Part 255.507(f), Test requirements for pipelines to
operate at less than 125 psig, states, “On short sections (100 feet (30.5 meters) or less) of pipe,
and tie-in sections, where all joints, uncoated portions of longitudinal seams, and/or fittings are
exposed, a soap test is acceptable at line pressure….
” A soap test for pipeline leaks involves
application of liquid soap to the outside of the pipe at the fusion joints and threaded fitting
connections. If there is a leak, a soap bubble will form.
Con Edison performed a leak test on the new 8-inch HDPE gas main in front of
1642 Park Avenue when the cast iron main was replaced in 2011. The test was performed before
the service tee was installed and was conducted at the operating pressure of about 1/3 psig using
soap solution. Federal regulations required a pressure test at 50 psig minimum.
31

<<<PAGE 43>>>

NTSB Pipeline Accident Report
1.13 Postaccident Activities
1.13.1 FDNY Fire Investigation
The FDNY investigated the accident and determined that the explosion originated inside
Building 1644, in the Spanish Christian Church on the first and second floors. The FDNY report
stated that the explosion was caused by a mixture of natural gas and air that was ignited by an
unidentified ignition source (FDNY 2014).
1.13.2 Con Edison Heat Fusion Procedure Upgrade
After the accident, Con Edison revised its plastic pipe fusing procedure. The new edition
of Heat Fusion Joining of Polyethylene Plastic Pipe/Tubing Fittings for Gas Mains and Services
is dated 2014. The new procedure requires that after the surface of the pipe to be joined is
roughened with emery cloth, any residues from the roughened surface shall be removed using a
dry, clean cloth. However, the revised procedure still does not include a requirement to use
alcohol wipes or another solvent to clean and degrease the surfaces to be joined. The industry
standard ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and
Fittings, specifies the use of alcohol to clean the surfaces before they are fusion joined.
1.13.3 Sewer Inspection and Excavation
At the request of the NTSB, the NYCDEP conducted a video inspection of the sewer
main on March 28, 2014, to determine whether the sewer damage observed in previous
inspections, including one that was performed immediately after the accident on March 19, was
providing a path for groundwater to enter the sewer. Using large hoses, water containing
fluorescent tracing dye was poured from a tanker into the trench in the area of the defective gas
service tee, gas main, and water main in front of Building 1642.26 A robotic camera was inserted
in the sewer main from the upstream manhole near East 117th Street and was pushed south
toward the downstream manhole. The inspection showed that water containing the dye was
flowing freely through the breach in the sewer main. (See figure 20.) The inspection also showed
dyed water dripping from the top and seeping from the side of the sewer at various locations. The
video inspections conducted in 2006 and 2011 show sewer main damage in the same location.
(See figure 5.)
26 At the time of this work, the water main, gas main, and service tee had been exposed by excavation and
removed.
32

<<<PAGE 44>>>

NTSB Pipeline Accident Report
Figure 20. Water containing fluorescent dye flowing into sewer main through damaged area in
east side of sewer main as shown in a video frame from March 28, 2014, inspection.
1.13.4 Gas Pressure Tests
Con Edison conducted postaccident pressure tests of the gas service main along the
accident block, upstream and downstream from the Building 1642 damaged service tee
connection. The tests of two segments at the operating pressure of 8 inches of water column or
1/3 psig, identified very small, insignificant leaks in the service main. The underground portions
of the gas service lines from the main to Buildings 1644 and 1646 also were pressure tested.
These tests showed no leaks.
1.13.5 Examination of Area Below the Pavement
A portion of the west side of Park Avenue in front of the destroyed buildings was
excavated to expose underground utilities. A circumferential crack in the 12-inch water main was
observed in front of Building 1642. (See figure 21.) The crack was wide on the top of the pipe
(12 o’clock position) and narrowed toward the bottom of the pipe. The crack extended about
340° around the circumference, with the pipe intact at the bottom. In addition, a large rock was
underneath the water pipe at the crack location.
33

<<<PAGE 45>>>

NTSB Pipeline Accident Report
Figure 21. Circumferential crack in exposed 12-inch cast iron water main near 8-inch HDPE gas
main.
The 2-inch gas service tee that was detached from the 8-inch gas main was about 12 feet
south of the water main crack and about 35 feet south of the breach in the sewer line. (See
figure 22.)
34

<<<PAGE 46>>>

NTSB Pipeline Accident Report
Figure 22. Eight-inch HDPE gas main, detached service tee, and service line in front of
Building 1642 with closeup of detached service tee.
Layers of concrete and asphalt were more than 12 inches thick in some locations in the
street in front of Buildings 1644 and 1646. The excavated trench showed many areas of
significant underground voids. The sidewalk was removed, which exposed voids and gaps at
least 4 inches high and up to several feet long in front of Buildings 1642 and 1644. Figure 23
shows a large void under the sidewalk next to Building 1642 and a folding ruler inserted into a
void under the sidewalk in front of Building 1644. The insert photo shows the opening directly
above the Building 1644 basement brick foundation that extends more than 85 inches under the
sidewalk.
35

<<<PAGE 47>>>

NTSB Pipeline Accident Report
Figure 23. Voids and gaps in ground beneath sidewalk in front of Buildings 1642 and 1644.
Inset photo shows void above brick basement foundation at Building 1644.
1.13.6 New York City Underground Infrastructure Working Group
After the accident, New York City convened a working group to address the under-street
infrastructure. The working group was made up of members from the Departments of
Transportation, Environmental Protection, Design and Construction, and Buildings; the Fire
Department; the Economic Development Corporation; and the Mayor’s Office of Long-Term
Planning and Sustainability. The working group was convened to address “emergency response
to defective under-street conditions; under-street infrastructure prioritization and street opening
procedures and the pace and schedule for upgrading and replacing the most vulnerable portions
of New York City’s aging utility infrastructure.” The group’s report, New York City
Underground Infrastructure Working Group, was released in June 2014. According to the report,
the working group met with Con Edison in the course of developing recommendations. The
recommendations of the working group include the following:
Improving emergency response to defective under-street conditions by
incorporating private utility notification into street defect response procedures,
instructing FDNY to respond to gas calls, and sending a clear and coordinated
message that people who smell gas should call 911.
The working group initiative included a public awareness campaign that encourages the
public to call 911 if they smell natural gas. Based on the current level of gas calls to utilities,
36

<<<PAGE 48>>>

NTSB Pipeline Accident Report
311, and 911, the FDNY concluded that it will be able to handle all gas odor calls, even if such
calls increase considerably because of high-profile public messaging. The report stated that the
FDNY will respond to all gas odor calls reported to 911, and 311 notifications will be
immediately routed to 911. The report further stated that response to gas odor reports will follow
the standard operating procedures but will include notifying the pipeline operators, disconnecting
leaky appliances, venting the space, and evacuating buildings. According to the report, the
average FDNY response time to suspected gas leak calls was less than 8 minutes; the Con Edison
average response time was 20 to 25 minutes.
On June 23, 2014, the NYPSC asked Con Edison to explain how 911 gas odor and leak
reports that the FDNY responds to will be coordinated with Con Edison.27 The company stated
that New York City “has urged Con Edison to inform the public that gas odors can be reported to
911 for the prompt response of the FDNY.” Con Edison began a public awareness campaign
during the week of March 17, 2014, to encourage the public to notify 911 or Con Edison in the
event of a suspected gas odor.
In its response to the NYPSC, Con Edison further stated the following:
While the June, 2014 report of the New York City Underground Infrastructure
Working Group apparently suggests that the public call only 911 to report gas
odors, it is not Con Edison’s intention to discourage reporting to
1-800-75-CONED. The Working Group that promulgated the report consisted
solely of representatives of the City, and although Con Edison has been working
with the City regarding implementation of report recommendations, we did not
contribute to nor review the report before it was released.
At the request of the NYSDPS, Con Edison has continued to develop coordinated training
with the FDNY to improve the response procedures used by the utilities and the FDNY.
1.13.7 Use of 911 for Gas Odor Calls
After the March 12, 2014, accident, calls to Con Edison reporting gas odors increased
significantly. On May 20, 2014, the NYPSC asked Con Edison whether the company was
capable of responding effectively to the gas odor calls. In its June 10, 2014, response,
Con Edison stated that it was taking measures that included “working more closely with the City
of New York in several areas, including with local emergency services to use the 911 emergency
calling system for the public to report gas odors in order to reduce response time.”28 In addition,
Con Edison discussed assigning additional resources to assist in investigating odor reports and
developing enhanced public education materials that highlight the importance of reporting gas
leaks.
27 June 23, 2014, letter from NYPSC Chair Audrey Zibelman to Con Edison Senior Vice President of Gas
Operations Edward Foppiano.
28 June 10, 2014, letter from Con Edison President Craig S. Ivey to NYPSC Chair Audrey Zibelman.
37

<<<PAGE 49>>>

NTSB Pipeline Accident Report
1.13.8 Plastic Fusion Welder Qualifications
In a May 21, 2014, letter to Con Edison, the NYPSC stated that the annual plastic fusion
qualification of the installer of the service tee at Building 1642 was expired at the time of
installation. His qualification for plastic fusion welding was valid until November 25, 2011. The
accident tee was installed in late December 2011. The NYPSC asked Con Edison for a list of all
plastic fusion joints completed after November 25, 2011, by the installer who installed the
Building 1642 service tee. It also requested a list of all the work performed by all plastic fusion
welders whose annual requalifications were found to be expired.
Con Edison employees and contractors who failed to requalify were prohibited from
performing fusion welds until they had successfully passed the qualifying test. Con Edison’s
qualification procedure followed the New York state natural gas safety regulations for
qualification and required making a plastic fusion joint observed by a skilled fusion weld
instructor in a classroom environment. The qualification process included visual inspection of
the joint and a destructive test to confirm that the fusion joint was a good weld.
In its response to the NYPSC, Con Edison stated that the tee installer, who worked for a
contractor, had been involved in 136 jobs from November 2011 to November 2013. Of these
jobs, 120 involved low-pressure and 16 involved high-pressure pipe joints. In addition,
Con Edison noted that 13 of that contractor’s employees were plastic pipe installers, and 12 of
them, including the accident tee installer, had performed plastic pipe installations during periods
after their qualifications had expired. In addition, Con Edison estimated that the contractor that
employed the tee installer had made about 700 plastic fusion welds from May 1, 2011, to
April 30, 2014, and it noted that 186 Con Edison employees and 115 contractor employees had
lapses in their operator qualifications at different intervals.
On June 27, 2014, the NYPSC issued the Plastic Fusion Order to investigate Con Edison
and its practices of qualifying employees to perform plastic fusions on natural gas facilities. The
Plastic Fusion Order notes that “staff has found no evidence that Con Edison placed into service
any pipe that had not been fused according to acceptable procedures and specifications.”
However, the Plastic Fusion Order requires Con Edison to provide records of compliance and
noncompliance with the state regulations.
The Plastic Fusion Order stated that Con Edison had failed to comply with natural gas
safety regulations for plastic fusion qualification that required, on an annual basis, that
employees and contractors submit a plastic fusion joint in a classroom environment for both a
visual inspection and a destructive test. The order further stated that Con Edison was not
destructively testing the sample fusion joints prepared during annual qualification. In addition,
Con Edison had failed to requalify its employees and contractors on an annual basis as required
under its procedures. The order contained 12 items that require Con Edison to take corrective
action or provide details within 5 to 15 days of the order, including the following:
 Identify how the company will ensure (through inspection or other means)
that the plastic fusion work performed by unqualified contractors or
employees, between 2011 and 2013, is not defective or result in “adverse
consequences.”
38

<<<PAGE 50>>>

NTSB Pipeline Accident Report
 Provide documentation showing how the company will continue to ensure that
employees and contractors are qualified or re-qualified to perform plastic
fusions in the future.
 Commence continuous leakage detection surveys (as defined under
16 New York Codes, Rules and Regulations [NYCRR] 255.3) over all plastic
fusion facilities joined by the plastic fusion process until the NYPSC directs
otherwise.
 A list of people tested since May 29, 2014, (the date when Con Edison began
to requalify contractors and employees) and a list of persons that failed to
requalify.
In its July 2, 2014, response to the NYPSC Plastic Fusion Order, Con Edison offered its
existing programs for material selection, training, visual inspection, pressure testing, and leak
tracking. The response identified two additional initiatives involving enhanced leakage surveys
and on-site fusion joint inspection that would improve the existing programs. Con Edison also
proposed to use high-speed mobile gas leak survey equipment under a pilot program. These
mobile surveys would be capable of surveying about 300 miles of gas distribution mains per
week. Also proposed was gradually increasing the frequency of distribution main surveys from
once per year to 13 times per year. In addition, Con Edison noted that it was developing a
program to provide on-site inspection of existing plastic fusion joints that are exposed during
work.
Con Edison further reasserted the measures currently in place to ensure that plastic fusion
joints are made correctly. Con Edison stated that “the use of visual quality inspection is the
current industry standard method for evaluating the quality of field fusion joints; it also satisfies
the field fusion inspection code requirements.” Con Edison described a visually acceptable
saddle fusion joint as one that has three complete fusion beads around the entire joint. It also
stated that pressure testing pipelines to 90 psig on low-pressure lines and leak testing (soap test)
where pressure testing is not possible “provides assurance they are leak free.” In addition, the
company points to the leak-tracking database it maintains, noting that between January 2011 and
July 2014, in 222 miles of installed plastic mains and 46,000 service lines and associated fittings,
only four fusion-related leaks had been reported, and only one was related to workmanship.
In a July 7, 2014, followup to the NYPSC, Con Edison stated that 288 Con Edison
employees and 155 contractor employees took requalification tests for plastic pipe fusion. The
tests included butt fusion joints, electrofusion fittings, and saddle fusion. Of those tested,
25 Con Edison employees (9 percent) and 37 contractors (24 percent) failed; 34 of those tested
(8 percent) failed the saddle fusion qualification test.29 The accident tee installer passed the
requalification tests.
29 July 7, 2014, letter from Con Edison to Kathleen H. Burgess, NYPSC. NYPSC Case No. 14-G-0212, Con
Edison correspondence to the NYPSC, July 7, 2014; appendices A and B.
39

<<<PAGE 51>>>

NTSB Pipeline Accident Report
1.13.9 New York Public Service Commission Notice of Proposed Rulemaking
On September 11, 2014, the NYPSC issued a Notice of Proposed Rulemaking to revise
16 NYCRR Part 255, Subchapter C, to “make [the regulations] at least as stringent as the federal
rules - 49 CFR Part 192 - Transportation of Natural and other Gas by Pipeline: Minimum Federal
Safety Standards.”30 If adopted, these changes will bring the New York State pipeline safety
regulations in line with the federal minimum safety standards. In this notice of proposed
rulemaking the NYPSC proposed, in part, the following:
 The adoption of the federal definition of Service Line as stated under
49 CFR 192.3
 Changes to the 16 NYCRR 255.723 regarding leakage surveys which, with
the adoption of the federal definition of service line, require local gas
distribution companies to perform leakage surveys of piping interior to a
building, upstream of the meter.
 Elimination of soap testing (leak testing) under 16 NYCRR 255.507 for short
sections of piping before it is placed in service.
The NYPSC adopted the proposed revisions to 16 NYCRR Part 255; the changes were
issued and effective on April 2, 2015.
30 NYPSC Case No. 14-G-0357, “In the Matter of Revising 16 NYCRR Gas Safety Regulations for Consistent
Application of More Stringent Federal Gas Safety Standards in 49 CFR,” issued September 11, 2014.
40

<<<PAGE 52>>>

NTSB Pipeline Accident Report
2 Analysis
2.1 Water Main Damage
The hole that opened up on Park Avenue in front of Building 1642 after the accident and
the discovery of the water main break both raised the possibility that leaking water may have
caused the natural gas leak. For that to be the case, the water main would have had to leak a
significant amount of water for a long time to wash out the soil supporting the gas main, which
would then sag, overstressing the service tee joint. A leak in the 12-inch-diameter water main,
operating at 55 psig, large enough to cause the soil washout and service tee damage, would have
had to occur before the gas odor was detected by residents more than 12 hours before the
explosion.
Emergency responders observed high-velocity water spraying from the water main crack
below the hole in the street and striking the underside of the pavement. Many hours would have
been required for such a water leak to undermine the gas main and break the service tee, then for
gas to accumulate to a level sufficient for residents to smell it. Water flowing at high velocity
and volume sufficient to cause the damage would most likely have manifested itself in the street
or nearby buildings a day or more before the explosion. However, the water leak did not appear
in the street until more than 4 hours after the explosion. In addition, the NYCDEP did not detect
a water main leak during a routine leak survey it conducted along Park Avenue on March 5, 7
days before the explosion. Furthermore, the NTSB review of the 311 call records from before
the accident revealed no calls from the accident block reporting water leaks on the street or into
basements in the days preceding the explosion.
When the water main was excavated, a large rock was discovered directly beneath the
cracked cast iron pipe, which could have created significant bending stress on the cast iron pipe
from the heavy traffic on the street directly above the water pipe during firefighting activities.
The NTSB therefore concludes that the water main break was not a factor in the accident and the
water main most likely failed some time after the explosion when the pipe, weakened by
graphitic corrosion, was shaken by the natural gas explosion shock wave or from the increased
loading from the incident response equipment on the street directly above the water main.
2.2 Sewer Damage
The NYCDEP identified the large hole in the sewer main during inspections in 2006 and
2011 but took no action to repair it. The postaccident fluorescent tracer dye inspection showed
water flowing directly into the sewer through the breach. Resident observations and the NYDOT
street repair records dating back more than 8 years confirm significant and continuing pavement
damage caused by ground settlement in front of Buildings 1642, 1644, and 1646. The water flow
dye testing conducted after the accident confirmed that the sewer breach provided an unrestricted
and direct flow path for groundwater and soil into the sewer main.
The NTSB concludes that the supporting soil under the gas and water mains was washed
into the sewer through the large hole in the sewer wall over many months or years when
groundwater accumulated in the area. The NTSB further concludes that as the soil washed away
41

<<<PAGE 53>>>

NTSB Pipeline Accident Report
after the plastic gas main and service tee were installed in 2011, the gas main was no longer
supported in the vicinity of the service tee for Building 1642, which caused the line to sag and
overstressed the defective fusion joint at the service tee.
The accident service tee was installed about 27 months before the accident. The
disruption of the soil and the underground voids beneath the service tee likely affected the gas
main and service tee, moving the joined pipes and highly stressing the saddle fusion joint. In
addition, the soil disruption caused gaps beneath the street and the sidewalk, providing an
unobstructed path for natural gas leaking from an underground pipeline to enter the building. The
NTSB concludes that had the NYCDEP repaired the breach in the sewer main after it was
discovered in 2006, damage to the street in the vicinity of Buildings 1642, 1644, and 1646 would
have been prevented by minimizing local soil movement and settlement caused by the localized
groundwater movement. The NTSB recommends that the NYCDEP implement a written
program or procedure to ensure the integrity of its sewer lines, repair breaches in a timely
manner, and coordinate with other agencies to identify and address potential soil disruption and
voids.
2.3 Gas Main and Service Tee
The water main break was identified sometime after the explosion when a section of the
street pavement caved in and water was spraying at high velocity against the underside of the
pavement. The plastic gas main became visible in the hole after the water main was shut off and
water in the hole receded. The flowing water from the water main break washed out the dirt
supporting the gas main. On the day of the accident, a large backhoe was brought in to remove
the loose dirt, large chunks of concrete and asphalt pavement, and debris from the hole. The hole
was then backfilled with gravel and partially covered with a steel plate to allow the firefighting
equipment and recovery equipment to access the destroyed buildings. After the firefighting and
recovery operations were completed, the backhoe was used to reexcavate the area to expose the
broken water main and the gas main in front of Buildings 1642 and 1644.
When the 8-inch plastic gas main was exposed, it showed evidence of significant
sagging, likely because of the large asphalt chunks and dirt on top of the pipe. The service tee
connecting Building 1642 was found to be completely separated from the gas main and the cap
was gouged and scratched. After the service line was cut and the service tee removed,
investigators discovered a large through-wall crack at the bottom of the service tee outlet.
2.3.1 Service Tee Failure Examination
The NTSB conducted finite element modeling of the service tee to examine various
loading conditions and resulting stresses and deflections in the two damaged areas, the crack in
the service tee outlet and the incomplete fusion in the service tee-to-gas main joint. Multiple load
and deflection cases were selected to mimic the various loads imposed during operation or
postaccident excavation work. Based on the results, the NTSB concludes that normal loads
during operation, and the abnormal loads that resulted from the soil displacement around and
below the gas main, were not sufficient to cause either the crack in the service tee outlet or the
complete separation of the gas main-to-service tee fusion joint. The NTSB further concludes that
42

<<<PAGE 54>>>

NTSB Pipeline Accident Report
the complete separation of the fusion joint and the crack in the service tee resulted from damage
sustained during the postaccident excavation work.
Service Tee Branch Crack
The crack at the lower corner outlet portion of the service tee most likely was the result
of a rapid overloading event, such as sudden soil movement resulting from the gas explosion,
local soil disturbance caused by the backhoe bucket during the recovery effort after the accident
or direct impact from the backhoe bucket. A comparison of the fracture surface features between
the service tee branch crack and an exemplar crack created under impact conditions confirmed
the crack was formed by a rapid overloading event. The finite element modeling showed that the
loads from sagging in normal service were unlikely to cause the crack in the service tee body, but
that loads intended to simulate postaccident excavation were large enough to cause the crack in
the service tee body. The finite element modeling also showed that even with an assumed initial
separation as large as regions 1 and 3 in figure 14, the fusion joint was still strong enough to
allow high loads to be applied to the service tee to initiate the crack at the lower corner outlet
portion.
Service Tee-to-Gas Main Fusion Joint
Based on the testing conducted at the service tee manufacturer’s facility, NTSB materials
engineers examined the possible causes of the fusion joint failure. The exemplar saddle fusion
joint made with intentionally oil-contaminated joint surfaces was subjected to the drop weight
test, which is used to evaluate the quality of the fusion joint. Then the exemplar joint fracture
faces were compared to those from the accident service tee fusion joint. The fracture features on
the accident joint and the exemplar joint were similar. A large portion of the saddle fusion joint
fracture face of the accident tee exhibited a radial band pattern consistent with incomplete fusion,
indicating that the joined surfaces were inadvertently contaminated before the fusion bond was
made. The fusion joint was significantly weaker than one made following the correct procedure.
The Con Edison heat fusion procedure that was in effect at the time the accident service
tee was installed required that the surfaces to be joined only be roughened with emery cloth. The
procedure did not require any cleaning method. Contamination such as oil, dirt, water, and other
materials are known to reduce the strength of a fusion bond in plastic pipe materials. Industry
standards, such as ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene
Pipe and Fittings, provide guidance on cleaning pipe surfaces, including the use of alcohol to
clean surfaces to ensure that they are not contaminated before the fusion joint is made. Lacking
such precautions, defective joints caused by incomplete fusion cannot be detected by visual
inspection.
Incomplete fusion causes weak bond strength in fusion joints. A joint with poor bond
strength may pass an on-site pressure test but can fracture or develop a crack under normal
loading conditions, such as soil loads and operating stress, after the pipeline is placed in service.
Construction records indicate that the saddle fusion joint involved in the accident was pressure
tested at 90 psi prior to placing the pipe into service and no leaks were reported. Detection of
fusion joints with poor bond strength continues to be a challenge for the HDPE pipeline industry.
The NTSB therefore concludes that the surfaces of the service tee and the gas main were not
43

<<<PAGE 55>>>

NTSB Pipeline Accident Report
adequately prepared before the tee was fusion welded to the gas main in 2011, resulting in a
defective joint that contained an area of incomplete fusion. Since the accident, Con Edison has
revised its heat fusion procedure to require cleaning to remove dry contaminants, but has not
incorporated a solvent cleaning procedure. The NTSB recommends that Con Edison revise its
plastic pipe fusion welding procedure to require cleaning of the surfaces to be welded with
suitable solvents to remove all dirt, water, oil, paint, and other contaminants as recommended in
ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings.
The heat fusion process for saddle fusion produces a solidified joint that contains three
distinct fusion beads. After the beads solidify, Con Edison requires that operators perform a
visual inspection and verify that the completed joint has three fusion beads and that they extend
all around the joint. Industry standards such as ASTM F2620 also require that the solidified
beads be uniformly shaped and sized all around the joint. However, the failed service tee did not
contain uniform bead sizes around the circumference. The NTSB therefore concludes that visual
inspection of the fusion joint to confirm only the required number of beads are present does not
provide sufficient evidence of a properly welded joint. The NTSB recommends that to ensure
consistent and acceptable heat fusion joints, Con Edison revise its plastic pipe fusion welding
procedure to specify that the solidified beads should be visually examined after completing a
joint to ensure the beads are uniformly shaped and sized around the joint as recommended in
ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings.
Finite element modeling showed that the pipe’s sagging could open the area of the
incomplete fusion wide enough to allow a gas flow rate sufficient over a period of hours to cause
the explosion of Building 1644. The leaking gas flowed through the voids under the street and
sidewalk and entered the basement of Building 1644 through voids in the basement wall. Natural
gas accumulated in the basement and in the church on the ground and second floors. An
unknown ignition source ignited the natural gas, which exploded because it was confined in the
building.
31 The NTSB concludes that stresses created by the vertical displacement of the sagging
gas main opened a crack in the defective service tee fusion joint, allowing natural gas to escape
into the subterranean area and migrate into Building 1644. The NTSB further concludes that the
defective service tee fusion joint was the only credible source of natural gas that could have
provided a large enough flow rate to have fueled the building explosion.
2.3.2 Fusion Joint Operator Qualification
The plastic fusion qualification of the installer of the service tee at Building 1642 was
expired at the time of installation. Con Edison determined that the tee installer, who worked for a
contractor, had been involved in 136 jobs from November 2011 to November 2013. In addition,
Con Edison found that 12 installers, including the accident tee installer, had performed plastic
pipe installations during periods after their qualifications had expired, and it noted that
186 Con Edison employees and 115 contractor employees had lapses in their operator
31 Natural gas, like all flammable gases, will explosively ignite only if it is contained inside a closed volume.
44

<<<PAGE 56>>>

NTSB Pipeline Accident Report
qualifications at different intervals. These qualification deficiencies went undetected by both
Con Edison and its contractors.
The NYSDPS audits utility companies using a 5-year plan. Each section of the state code
is assessed by a records audit or a field inspection. Records audits are performed at the pipeline
operator’s office and may include areas such as operations procedures and leak survey records.
Inspectors conduct unannounced visits to a construction site or operations activity and review the
work against the operator’s written procedures and state regulations. However, the 5-year plan
did not specifically address audits of operator qualifications. The expired qualifications of
Con Edison and contractor employees were undetected by the NYSDPS auditors. The NTSB
concludes that the NYSDPS audit program for pipeline operators does not effectively address all
aspects of the state regulations. Therefore, the NTSB recommends that the NYSPSC revise the
NYSDPS gas utility operator program to ensure all elements of the regulations are included in
the 5-year audit plan.
2.4 Con Edison Emergency Call Response
Some residents who lived in or near the buildings that were destroyed in the explosion
told investigators that they smelled gas the night before the accident. However, the Con Edison
incoming call logs contained no records of any gas odor calls for the accident block the day
before the accident. The NTSB concludes that had Con Edison received a report of the gas odor
on the evening of March 11, it likely would have found the gas leak and taken appropriate
corrective actions to prevent the accident; this accident highlights the critical importance for
members of the public to notify 911 or the gas company when the odor of natural gas is first
detected. On the morning of March 12 at 9:06 a.m., about 25 minutes before the explosion, the
Call Center received a call reporting gas odor inside and outside the building. The Con Edison
computer system, which CSRs use to transfer the information to GERC, stopped responding.
GERC is responsible for dispatching gas mechanics and other response actions, including
notifying the FDNY when necessary. Based on a phone conversation with the CSR, GERC was
aware that the gas odor was reported inside and outside the building, thus requiring GERC to
notify the FDNY. GERC dispatched the mechanic at 9:15 a.m., and at 9:19 a.m. called the FDNY
to inform them of the gas odor. However, GERC ended the call without informing the fire
department of the leak. After the building exploded, the FDNY arrived at the scene within
4 minutes. The NTSB concludes that had Con Edison notified the FDNY at 9:14 a.m., when the
call from the CSR ended, FDNY responders likely could have arrived at the gas leak location up
to 15 minutes before the explosion; it is unclear, however, whether the emergency responders
could have safely evacuated two 5-story buildings that were not equipped with elevators or fire
alarm systems. The NTSB recommends that Con Edison provide clear written guidance to the
GERC staff on the conditions for promptly notifying the FDNY and provide additional staff
training.
Con Edison was unable to turn off the gas to the leaking pipeline until 1:44 p.m., more
than 4 hours after the accident, when the street was excavated in three locations and stoppers
were put on the gas main. The NTSB concludes that had Con Edison installed appropriately
located isolation valves on the gas distribution main, the leaking gas main could have been
isolated sooner after the explosion, minimizing both the danger to the first responders and the
delay in recovery operations. The NTSB recommends that Con Edison extend its gas main
45

<<<PAGE 57>>>

NTSB Pipeline Accident Report
isolation valve installation program to include strategic locations where long distribution mains
currently cannot be isolated, giving priority to pipelines in more densely populated areas.
2.5 Con Edison Public Awareness Program
The Con Edison public awareness program was based on the NGA template for public
awareness and education programs. It included material on how to notify Con Edison in the
event of an emergency. Specifically, all of the Con Edison public awareness materials stress the
importance of contacting the company in the event of a gas leak. However, the results of the
recent evaluations of the effectiveness of the public awareness program show that the most
effective method for reporting suspected gas leaks is not well understood by the general public.
Despite the inclusion of this information on bulletin boards in apartment buildings, in gas bills
mailed to customers, and in newspaper advertisements, people who smelled gas on the accident
block the night before the explosion did not call Con Edison or the fire department to report the
odor. During assessments of the Con Edison public awareness and education programs,
49 percent of respondents said they would call 911 if they detected a natural gas leak. The NTSB
therefore concludes that the Con Edison public awareness and education programs did not
effectively inform customers and the public about both the importance of reporting a gas odor
and the number to call to report a gas odor.
After the March 12, 2014, accident, New York City and Con Edison began providing
new training guides to inform the public how important it is to report gas odors, either to
Con Edison or to the fire department through the 911 emergency number. The company also
launched a new public awareness campaign in March 2014: “Smell Gas Act Fast.” This new
message notes that suspected gas leaks may be reported to either Con Edison at
1-800-75-CONED or the FDNY using 911 or the telephone number of the local fire station.
Materials for the new campaign are provided in English, Spanish, Chinese, Korean, Russian, and
Haitian Creole.
2.6 Alignment of State and Federal Gas Pipeline Regulations
Under 49 CFR 192.3, the operator is responsible for a service line from the distribution
main to the outlet of the gas meter, whereas under NYCRR 255.3, the operator is responsible for
the service line up to the first fitting entering the building. The distinction between the two
definitions is limited to cases where the gas meter is located inside a building, as is common in
New York City. Under the federal definition of service line, the gas operator remains responsible
for the maintenance and leak survey of the service line up to the outlet of the gas meter. Under
the New York state regulation, the operator’s responsibility to maintain a service line ends at the
first fitting inside the building wall, and the operator is not responsible for leak surveys or
maintenance of the service line between the first fitting inside the building and the outlet of the
gas meter, which could be tens of feet away from the first valve. The NTSB found that the New
York state regulation addressing the scope of the definition of natural gas service line did not
comply with the PHMSA regulation. However, effective April 2, 2015, the NYPSC corrected the
deficiency.
After comparing the federal and the New York state regulations relating to pressure
testing of pipelines, NTSB investigators found that the federal regulations are more stringent
46

<<<PAGE 58>>>

NTSB Pipeline Accident Report
than those of New York. The federal regulation does not distinguish between gas pipelines of
differing lengths. In contrast, the New York state regulation allows sections of pipe shorter than
100 feet long to be tested using a less stringent pressure test requirement than that required by
federal regulations. The NTSB found that the New York state regulation at 16 NYCRR
255.507(f) addressing natural gas pipeline pressure testing did not comply with the PHMSA
regulation at Title 49 CFR 192.513(c). However, effective April 2, 2015, the NYPSC also
corrected this deficiency.
47

<<<PAGE 59>>>

NTSB Pipeline Accident Report
3 Conclusions
3.1 Findings
1. The water main break was not a factor in the accident and the water main most likely failed
some time after the explosion when the pipe, weakened by graphitic corrosion, was shaken
by the natural gas explosion shock wave or from the increased loading from the incident
response equipment on the street directly above the water main
2. The supporting soil under the gas and water mains was washed into the sewer through the
large hole in the sewer wall over many months or years when groundwater accumulated in
the area.
3. As the soil washed away after the plastic gas main and service tee were installed in 2011, the
gas main was no longer supported in the vicinity of the service tee for 1642 Park Avenue,
which caused the line to sag and overstressed the defective fusion joint at the service tee.
4. Had the New York City Department of Environmental Protection repaired the breach in the
sewer main after it was discovered in 2006, damage to the street in the vicinity of 1642,
1644, and 1646 Park Avenue would have been prevented by minimizing local soil movement
and settlement caused by the localized groundwater movement.
5. Normal loads during operation, and the abnormal loads that resulted from the soil
displacement around and below the gas main, were not sufficient to cause either the crack in
the service tee outlet or the complete separation of the gas main-to-service tee fusion joint.
6. The complete separation of the fusion joint and the crack in the service tee resulted from
damage sustained during the postaccident excavation work.
7. The surfaces of the service tee and the gas main were not adequately prepared before the tee
was fusion welded to the gas main in 2011, resulting in a defective joint that contained an
area of incomplete fusion.
8. Visual inspection of the fusion joint to confirm only the required number of beads are present
does not provide sufficient evidence of a properly welded joint.
9. Stresses created by the vertical displacement of the sagging gas main opened a crack in the
defective service tee fusion joint, allowing natural gas to escape into the subterranean area
and migrate into 1644 Park Avenue.
10. The defective service tee fusion joint was the only credible source of natural gas that could
have provided a large enough flow rate to have fueled the building explosion.
11. The New York State Department of Public Service audit program for pipeline operators does
not effectively address all aspects of the state regulations.
48

<<<PAGE 60>>>

NTSB Pipeline Accident Report
12. Had Consolidated Edison Company of New York, Inc., received a report of the gas odor on
the evening of March 11, it likely would have found the gas leak and taken appropriate
corrective actions to prevent the accident; this accident highlights the critical importance for
members of the public to notify 911 or the gas company when the odor of natural gas is first
detected.
13. Had Consolidated Edison Company of New York, Inc., notified the New York City Fire
Department at 9:14 a.m., when the call from the customer service representative ended,
New York City Fire Department responders likely could have arrived at the gas leak location
up to 15 minutes before the explosion; it is unclear, however, whether the emergency
responders could have safely evacuated two 5-story buildings that were not equipped with
elevators or fire alarm systems.
14. Had Consolidated Edison Company of New York, Inc., installed appropriately located
isolation valves on the gas distribution main, the leaking gas main could have been isolated
sooner after the explosion, minimizing both the danger to the first responders and the delay in
recovery operations.
15. The Consolidated Edison Company of New York, Inc., public awareness and education
programs did not effectively inform customers and the public about both the importance of
reporting a gas odor and the number to call to report a gas odor.
3.2 Probable Cause
The National Transportation Safety Board determines that the probable cause of the
accident was (1) the failure of the defective fusion joint at the service tee, installed by
Consolidated Edison Company of New York, Inc., in 2011, that allowed natural gas to leak from
the gas main and migrate into the building where it ignited and (2) a breach in the sewer line that
went unrepaired by the New York City Department of Environmental Protection since at least
2006 that allowed groundwater and soil to flow into the sewer, resulting in a loss of support for
the gas main, which caused the line to sag and overstressed the defective fusion joint.
49

<<<PAGE 61>>>

NTSB Pipeline Accident Report
4 Recommendations
As a result of this investigation, the National Transportation Safety Board makes the
following new safety recommendations:
To the City of New York:
Implement a written program or procedure to ensure the integrity of your sewer
lines, repair breaches in a timely manner, and coordinate with other agencies to
identify and address potential soil disruption and voids. (P-15-33)
To Consolidated Edison Company of New York, Inc.:
Revise your plastic pipe fusion welding procedure to require cleaning of the
surfaces to be welded with suitable solvents to remove all dirt, water, oil, paint,
and other contaminants as recommended in ASTM F2620, Standard Practice for
Heat Fusion Joining of Polyethylene Pipe and Fittings. (P-15-34)
Revise your plastic pipe fusion welding procedure to specify that the solidified
beads should be visually examined after completing a joint to ensure the beads are
uniformly shaped and sized around the joint as recommended in ASTM F2620,
Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings. (P-
15-35)
Provide clear written guidance to the Gas Emergency Response Center staff on
the conditions for promptly notifying the New York City Fire Department and
provide additional staff training. (P-15-36)
Extend your gas main isolation valve installation program to include strategic
locations where long distribution mains currently cannot be isolated, giving
priority to pipelines in more densely populated areas. (P-15-37)
To the New York State Public Service Commission:
Revise the New York State Department of Public Service gas utility operator
program to ensure all elements of the regulations are included in the 5-year audit
plan. (P-15-38)
50

<<<PAGE 62>>>

NTSB Pipeline Accident Report
BY THE NATIONAL TRANSPORTATION SAFETY BOARD
CHRISTOPHER A. HART Chairman Member
ROBERT L. SUMWALT
T. BELLA DINH-ZARR Vice Chairman Member
EARL F. WEENER
Adopted: June 9, 2015
51

<<<PAGE 63>>>

NTSB Pipeline Accident Report
Appendix A. Investigation
The National Transportation Safety Board (NTSB) received notification of the building
explosion from the National Response Center about 11:11 a.m. on March 12, 2014, and launched
a team of investigators. Investigative groups were formed for pipeline operations, public
awareness, regulatory oversight, survival factors, and pipeline materials. Member
Robert Sumwalt accompanied the team and was the on-scene spokesperson. Sean Dalton, special
assistant to Member Sumwalt, also was on scene.
The City of New York, the New York Public Service Commission, the Pipeline and
Hazardous Materials Safety Administration, Consolidated Edison Company of New York, and
Georg Fischer Central Plastic were parties to the investigation.
The NTSB held no public hearing in connection with this accident.
52

<<<PAGE 64>>>

NTSB Pipeline Accident Report
Appendix B. Timeline
Date Time Event
March 12, 2014 9:06 a.m. Resident of 1652 Park Avenue called Con Edison to report
smelling gas that morning and the night before.
9:12 a.m. The customer service representative (CSR) who took the call
and entered the information into the computer placed a
routine followup call to the Gas Emergency Response Center
(GERC) dispatcher.
9:13 a.m. The CSR called the GERC dispatcher again to confirm receipt
of the indoor gas leak ticket the CSR had just entered in the
computer system and submitted.
9:15 a.m. The dispatcher sent a gas service mechanic (mechanic) to the
1652 Park Avenue address.
9:19 a.m. The dispatcher called to ask the FDNY to respond to the inside
and outside gas leak reports from 1652 Park Avenue. Then the
dispatcher told the FDNY, “Hold on, … I’ll call you right back.”
No additional calls were made from GERC to the FDNY before
the explosion.
9:30 a.m. An explosion destroyed Buildings 1644 and 1646 Park Avenue,
resulting in loss of eight lives and multiple injuries.
The Con Edison mechanic was en route to the accident block.
A Metro-North operations manager 8 blocks away heard and
felt the explosion. He broadcast an emergency radio message,
and all train movements in the area were suspended
immediately thereafter.
FDNY firefighters at the station at 1367 5th Ave. and West
113th St. heard a loud explosion and saw a plume of smoke in
the direction of East 114th Street and Park Avenue.
Firefighters at the station called the Manhattan Fire Dispatch
System (FDS), and two companies dispatched trucks to the
accident scene. The FDS received the first calls reporting the
explosion and fire.
9:31 a.m. A witness called New York City 911 to report the explosion.
The NYPD dispatched patrol officers to the accident scene.
53

<<<PAGE 65>>>

NTSB Pipeline Accident Report
Date Time Event
March 12, 2014 9:34 a.m. The first FDNY truck arrived at the accident scene.
9:35 a.m. Fire suppression and rescue and recovery operations began.
Additional FDNY resources were dispatched as the situation
was elevated through several alarms.
9:39 a.m. The Con Edison mechanic arrived within a few blocks of the
accident scene.
The GERC operations manager called FDS.
9:46 a.m. The GERC operations manager requested that all available
personnel respond to the accident location.
Con Edison began to locate and excavate to isolate and stop
the gas supply to the accident scene.
1:44 p.m. Con Edison put stoppers at three locations on the gas main,
isolating the gas supply to the accident scene.
2:00 p.m. A void opened in the street in front of 1642 Park Avenue. The
hole grew in size and water was seen in the hole.
The hold was temporarily filled with gravel debris so that
heavy equipment could continue excavation.
3:00–3:30
p.m.
A gas explosion occurred at the hole.
March 13–17,
2014
Recovery operations continued.
March 18, 2014 5:41 p.m. The FDNY declared on-scene operations concluded.
54

<<<PAGE 66>>>

NTSB Pipeline Accident Report
References
FDNY (New York City Fire Department). 2014. Fire Incident Report. Bureau of Fire
Investigation, New York City Fire Department. 10257 2014.
Con Edison (Consolidated Edison Company of New York, Inc.). 2014. Gas Operations
Emergency Response Plan. EMP-200. New York City: Con Edison.
55

## Provenance

- Official: Yes
- Source: <https://www.ntsb.gov/investigations/Pages/DCA14MP002.aspx>
- Source ID: `ntsb-pipeline`
- SHA-256: `d613ec35aacea8de3a280ae5cea8dbfdfb8d0ca55a193fd46c933399a867d495`
- Retrieved: 2026-08-20T04:57:25.499Z
- Exported: 2026-08-23T12:12:52.689Z
- Document slug: `ntsb-case-dca14mp002`

### Source metadata

```json
{
  "recordKind": "ntsb_pipeline_investigation",
  "mkey": 88915,
  "ntsbNumber": "DCA14MP002",
  "completionStatus": "Completed",
  "caseClosed": true,
  "hasSafetyRecommendation": true,
  "eventType": null,
  "accidentType": null,
  "operator": null,
  "pipelineType": null,
  "location": {
    "city": "Manhattan",
    "state": "NY",
    "country": "USA",
    "latitude": null,
    "longitude": null
  },
  "reportNumber": null,
  "probableCause": "The National Transportation Safety Board determines that the probable cause of the accident was (1) the failure of the defective fusion joint at the service tee, installed by Consolidated Edison Company of New York, Inc., in 2011, that allowed natural gas to leak from the gas main and migrate into the building where it ignited and (2) a breach in the sewer line that went unrepaired by the New York City Department of Environmental Protection since at least 2006 that allowed groundwater and soil to flow into the sewer, resulting in a loss of support for the gas main, which caused the line to sag and overstressed the defective fusion joint.",
  "events": [
    {
      "eventNumber": 7,
      "sequenceNumber": 4,
      "eventCode": "990337",
      "tier1Number": "990",
      "tier1Name": "Unknown",
      "tier2Number": "337",
      "tier2Name": "Pipe structural malfunction/failure",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 8,
      "sequenceNumber": 5,
      "eventCode": "400337",
      "tier1Number": "400",
      "tier1Name": "System operating",
      "tier2Number": "337",
      "tier2Name": "Pipe structural malfunction/failure",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 10,
      "sequenceNumber": 6,
      "eventCode": "100337",
      "tier1Number": "100",
      "tier1Name": "System not operating",
      "tier2Number": "337",
      "tier2Name": "Pipe structural malfunction/failure",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 13,
      "sequenceNumber": 3,
      "eventCode": "160020",
      "tier1Number": "160",
      "tier1Name": "Initiating product flow",
      "tier2Number": "020",
      "tier2Name": "Servicing event",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 16,
      "sequenceNumber": 8,
      "eventCode": "400050",
      "tier1Number": "400",
      "tier1Name": "System operating",
      "tier2Number": "050",
      "tier2Name": "Inspection event",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 19,
      "sequenceNumber": 9,
      "eventCode": "550060",
      "tier1Number": "550",
      "tier1Name": "System shutdown",
      "tier2Number": "060",
      "tier2Name": "Emergency shutoff",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 20,
      "sequenceNumber": 10,
      "eventCode": "700460",
      "tier1Number": "700",
      "tier1Name": "Post-release",
      "tier2Number": "460",
      "tier2Name": "Evacuation",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 21,
      "sequenceNumber": 11,
      "eventCode": "700800",
      "tier1Number": "700",
      "tier1Name": "Post-release",
      "tier2Number": "800",
      "tier2Name": "Emergency response",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 1,
      "sequenceNumber": 7,
      "eventCode": "401180",
      "tier1Number": "401",
      "tier1Name": "System operating, changing flow/pressure",
      "tier2Number": "180",
      "tier2Name": "Fire/explosion (post-release)",
      "isDefiningEvent": true
    },
    {
      "eventNumber": 9,
      "sequenceNumber": 2,
      "eventCode": "110140",
      "tier1Number": "110",
      "tier1Name": "System maintenance",
      "tier2Number": "140",
      "tier2Name": "System disabled",
      "isDefiningEvent": false
    },
    {
      "eventNumber": 2,
      "sequenceNumber": 1,
      "eventCode": "400900",
      "tier1Number": "400",
      "tier1Name": "System operating",
      "tier2Number": "900",
      "tier2Name": "Miscellaneous/other",
      "isDefiningEvent": false
    }
  ],
  "findings": [
    {
      "findingNumber": 14,
      "sequenceNumber": 14,
      "findingCode": "04025069",
      "findingTier1Name": "Organizational ",
      "findingTier2Name": "Management",
      "findingTier3Name": "Communication (organizational)",
      "findingTier4Name": null,
      "findingModifierName": "Pipeline operator",
      "findingReportText": "Organizational  - Management - Communication (organizational) - Pipeline operator",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 13,
      "sequenceNumber": 13,
      "findingCode": "04032071",
      "findingTier1Name": "Organizational ",
      "findingTier2Name": "Support/oversight/monitoring",
      "findingTier3Name": "Oversight",
      "findingTier4Name": null,
      "findingModifierName": "State/Local agency",
      "findingReportText": "Organizational  - Support/oversight/monitoring - Oversight - State/Local agency",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 5,
      "sequenceNumber": 12,
      "findingCode": "01035201",
      "findingTier1Name": "Pipeline",
      "findingTier2Name": "Pipeline structure",
      "findingTier3Name": "Joint/weld/seam",
      "findingTier4Name": null,
      "findingModifierName": "Failure",
      "findingReportText": "Pipeline - Pipeline structure - Joint/weld/seam - Failure",
      "findingText": null,
      "inProbableCause": true
    },
    {
      "findingNumber": 7,
      "sequenceNumber": 1,
      "findingCode": "01035207",
      "findingTier1Name": "Pipeline",
      "findingTier2Name": "Pipeline structure",
      "findingTier3Name": "Joint/weld/seam",
      "findingTier4Name": null,
      "findingModifierName": "Design",
      "findingReportText": "Pipeline - Pipeline structure - Joint/weld/seam - Design",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 11,
      "sequenceNumber": 2,
      "findingCode": "02032541",
      "findingTier1Name": "Personnel",
      "findingTier2Name": "Experience/knowledge",
      "findingTier3Name": "Skill/ability",
      "findingTier4Name": null,
      "findingModifierName": "Pipeline maintenance personnel",
      "findingReportText": "Personnel - Experience/knowledge - Skill/ability - Pipeline maintenance personnel",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 9,
      "sequenceNumber": 3,
      "findingCode": "02041541",
      "findingTier1Name": "Personnel",
      "findingTier2Name": "Action/decision",
      "findingTier3Name": "Information processing/decision making",
      "findingTier4Name": null,
      "findingModifierName": "Pipeline maintenance personnel",
      "findingReportText": "Personnel - Action/decision - Information processing/decision making - Pipeline maintenance personnel",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 6,
      "sequenceNumber": 4,
      "findingCode": "01011012",
      "findingTier1Name": "Pipeline",
      "findingTier2Name": "Pipeline handling/service",
      "findingTier3Name": "Securing",
      "findingTier4Name": null,
      "findingModifierName": "Unintentional use/operation",
      "findingReportText": "Pipeline - Pipeline handling/service - Securing - Unintentional use/operation",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 8,
      "sequenceNumber": 5,
      "findingCode": "01061007",
      "findingTier1Name": "Pipeline",
      "findingTier2Name": "Pipeline operation/capability",
      "findingTier3Name": "Pipeline integrity/capacity",
      "findingTier4Name": null,
      "findingModifierName": "Design",
      "findingReportText": "Pipeline - Pipeline operation/capability - Pipeline integrity/capacity - Design",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 3,
      "sequenceNumber": 7,
      "findingCode": "03035093",
      "findingTier1Name": "Environment/Infrastructure",
      "findingTier2Name": "Conditions/weather/phenomena",
      "findingTier3Name": "Precipitation",
      "findingTier4Name": null,
      "findingModifierName": "Use of related info",
      "findingReportText": "Environment/Infrastructure - Conditions/weather/phenomena - Precipitation - Use of related info",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 4,
      "sequenceNumber": 8,
      "findingCode": "03035000",
      "findingTier1Name": "Environment/Infrastructure",
      "findingTier2Name": "Conditions/weather/phenomena",
      "findingTier3Name": "Precipitation",
      "findingTier4Name": null,
      "findingModifierName": "Unknown/Not determined",
      "findingReportText": "Environment/Infrastructure - Conditions/weather/phenomena - Precipitation - Unknown/Not determined",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 12,
      "sequenceNumber": 10,
      "findingCode": "03042087",
      "findingTier1Name": "Environment/Infrastructure",
      "findingTier2Name": "Task environment",
      "findingTier3Name": "Pressures/demands",
      "findingTier4Name": null,
      "findingModifierName": "Awareness of condition",
      "findingReportText": "Environment/Infrastructure - Task environment - Pressures/demands - Awareness of condition",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 10,
      "sequenceNumber": 11,
      "findingCode": "02041050",
      "findingTier1Name": "Personnel",
      "findingTier2Name": "Action/decision",
      "findingTier3Name": "Action",
      "findingTier4Name": null,
      "findingModifierName": "Other government personnel",
      "findingReportText": "Personnel - Action/decision - Action - Other government personnel",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 2,
      "sequenceNumber": 6,
      "findingCode": "03035087",
      "findingTier1Name": "Environment/Infrastructure",
      "findingTier2Name": "Conditions/weather/phenomena",
      "findingTier3Name": "Precipitation",
      "findingTier4Name": null,
      "findingModifierName": "Awareness of condition",
      "findingReportText": "Environment/Infrastructure - Conditions/weather/phenomena - Precipitation - Awareness of condition",
      "findingText": null,
      "inProbableCause": false
    },
    {
      "findingNumber": 1,
      "sequenceNumber": 9,
      "findingCode": "03035091",
      "findingTier1Name": "Environment/Infrastructure",
      "findingTier2Name": "Conditions/weather/phenomena",
      "findingTier3Name": "Precipitation",
      "findingTier4Name": null,
      "findingModifierName": "Contributed to outcome",
      "findingReportText": "Environment/Infrastructure - Conditions/weather/phenomena - Precipitation - Contributed to outcome",
      "findingText": null,
      "inProbableCause": true
    }
  ],
  "caveat": "Official NTSB investigation data. NTSB findings determine probable cause and make safety recommendations; they do not adjudicate civil liability or regulatory violations.",
  "investigationPageAvailable": true,
  "investigationPageUrl": "https://www.ntsb.gov/investigations/Pages/DCA14MP002.aspx",
  "docketUrl": "https://data.ntsb.gov/Docket/?NTSBNumber=DCA14MP002",
  "reportArtifacts": [
    {
      "id": "ntsb-report-par1501",
      "title": "PAR-15-01",
      "url": "https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1501.pdf",
      "pageCount": 66,
      "pdfArtifactPath": "data/sources/ntsb-reports/artifacts/reports/ntsb-report-par1501.pdf",
      "pdfArtifactSha256": "8d889a77e787f0e28507e773eb0ba47065fef4e134482c41d75ec90f4ba6c8fd",
      "extractedTextPath": "data/sources/ntsb-reports/artifacts/reports/ntsb-report-par1501.txt",
      "extractedTextSha256": "31ffb98827ef20adc656bb185b2947e74f3f61b51fc6ee6826a26ff139903569",
      "extractionVersion": 2
    }
  ],
  "jurisdiction": "US",
  "region": "NY"
}
```