# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT \#11 - DETAILS OF CONSTRUCTION HYDROTEST FAILURE \#2

**Citation:** PLD19FR002 docket item 33  
**Type / status:** incident / current  
**Agency:** National Transportation Safety Board  
**Effective:** Not stated  
**Published:** Not stated

PLD19FR002; docket item 33; Text/Image.

## Document text

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #11 - DETAILS OF CONSTRUCTION HYDROTEST FAILURE #2 PLD19FR002 docket item 33. 1 page. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.

## Provenance

- Official: Yes
- Source: <https://data.ntsb.gov/Docket/Document/docBLOB?ID=11904240&FileExtension=pdf&FileName=%2311%20-%20DR141B%20Hydrostatic%20Test%20Failure%20%232-c2_Redacted-Rel.pdf>
- Source ID: `ntsb-dockets`
- SHA-256: `744c2cbbd82a35be2d35dcb4fd38978c90f61ebe31560ea2ea8b70de8857278d`
- Retrieved: 2026-08-20T04:58:09.797Z
- Exported: 2026-08-22T10:34:45.581Z
- Document slug: `ntsb-docket-item-11904240`

### Source metadata

```json
{
  "materialSubtype": "ntsb_docket_item_metadata",
  "ntsbNumber": "PLD19FR002",
  "blobId": "11904240",
  "ordinal": 33,
  "pages": 1,
  "photos": 0,
  "publishedMediaType": "Text/Image",
  "fileExtension": "pdf",
  "fileName": "#11 - DR141B Hydrostatic Test Failure #2-c2_Redacted-Rel.pdf",
  "docketUrl": "https://data.ntsb.gov/Docket/?NTSBNumber=PLD19FR002",
  "tableOfContentsUrl": "https://data.ntsb.gov/Docket/TOCPrintable?data=99981",
  "docketReportedMode": "Pipeline",
  "docketCreationDate": "2019-12-23",
  "docketLastModifiedDate": "2023-01-09",
  "docketPublicReleaseDate": "2021-03-11",
  "metadataOnly": true,
  "binaryMirrored": false,
  "caveat": "Docket item metadata and official link only. The title does not establish authorship, evidentiary weight, NTSB endorsement, legal effect, or a current regulatory finding; party submissions and evidence binaries are not mirrored.",
  "jurisdiction": "US"
}
```
