# 258.4 Notification of proposed construction or pressure increase.

**Citation:** 16 NYCRR 258.4  
**Type / status:** regulation / current  
**Agency:** New York State Public Service Commission  
**Effective:** Not stated  
**Published:** Not stated

Transportation of Liquid Petroleum (Hazardous Liquid Pipelines). (a) At least 30 days prior to the start of scheduled construction or reconstruction of any liquid petroleum pipeline, the corporation shall file with the office of gas and water of the department in Albany, a letter of intent and a report of specifications as required under section 258.13 of this Part. The letter of intent need not include said specification

## Document text

(a) At least 30 days prior to the start of scheduled construction or reconstruction of any liquid petroleum pipeline, the corporation shall file with the office of gas and water of the department in Albany, a letter of intent and a report of specifications as required under section 258.13 of this Part. The letter of intent need not include said specifications if the length of the pipeline is less than 500 feet. The office of gas and water of the department in Albany shall be promptly notified in writing of any significant change affecting the initial filing.

(b) Before any liquid petroleum pipeline is placed in operation, a report shall be filed with the office of gas and water of the department in Albany certifying the maximum operating pressure to which the pipeline is intended to be operated and also certifying that the pipeline has been constructed and tested in accordance with the rules prescribed herein.

(c) The maximum operating pressure of a liquid petroleum pipeline shall not be increased without the written permission of the office of gas and water of the department in Albany. At least 90 days prior to a proposed increase in the maximum operating pressure of any liquid petroleum pipeline, an acceptable program stating the investigative, testing, and corrective measures (including cathodic protection, leak history, detection and repair of leaks, and specifications of pipe and other facilities) to be taken before the pressure increase is made, shall be submitted.

## Provenance

- Official: Yes
- Source: <https://govt.westlaw.com/nycrr/Document/I505e1d88cd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)>
- Source ID: `ny-dps-nycrr`
- SHA-256: `1cb3f390e00d55459b445c412e10567779b05ed7996b11dbad398c07e1fd5a95`
- Retrieved: 2026-08-12T06:20:40.894Z
- Exported: 2026-08-24T04:13:27.395Z
- Document slug: `ny-nycrr-258-4`

### Source metadata

```json
{
  "jurisdiction": "US-NY",
  "title": 16,
  "part": "258",
  "partTitle": "Transportation of Liquid Petroleum (Hazardous Liquid Pipelines)",
  "scopeKind": "hazardous-liquid-pipeline-safety",
  "tocPath": [
    "Part 258 Transportation of Liquid Petroleum"
  ],
  "legalScope": "Complete current terminal legal unit exposed by the DPS-designated Title 16 NYCRR pipeline-safety part inventory.",
  "applicabilityCaveat": "Applicability depends on the part and section, Commission jurisdiction, commodity and facility type, intrastate or interstate status, operator and activity, exemptions, waivers, federal preemption, Commission orders, and incorporated law. DPS inspects portions of interstate systems for PHMSA, but PHMSA retains federal enforcement authority. DPS states that all jurisdictional Part 256 gas-holder and Part 257 LPG-plant facilities have been decommissioned even though those regulations remain unrepealed.",
  "incorporationCaveat": "These parts incorporate or rely on federal pipeline regulations, federal and New York statutes, Commission rules and orders, and privately authored technical standards. Part 10 supplies incorporation details. References metadata preserves explicit citations but does not reproduce external material, determine licensing rights, or decide whether a particular incorporation is static or dynamic.",
  "publicationCaveat": "The New York Department of Public Service identifies these eleven Title 16 NYCRR parts as its state pipeline-safety regulations and links to the public DOS/Westlaw NYCRR reading copy. That site labels the online text unofficial and directs users needing evidentiary accuracy to the Official NYCRR maintained by the Department of State Division of Administrative Rules. Each section's 'Current through' date is the most recent official NYCRR supplement covering that section, not a uniform corpus-wide amendment date.",
  "rights": "New York government-edict text is preserved with DPS, Department of State, and publisher attribution. The public reading site's presentation and enhancements, agency marks, forms, annotations, and incorporated federal or privately authored standards require separate rights review; this connector does not claim rights in those materials.",
  "rightsReviewRequired": true,
  "currentThrough": "2024-05-31",
  "historyEvents": "No event is emitted because the section reading copy does not supply an explicit adoption, filing, or effective-date history.",
  "publisherCitation": "16 CRR-NY 258.4",
  "identityAnomaly": null,
  "references": [
    {
      "citation": "16 NYCRR 258.13",
      "referenceType": "new-york-administrative-code",
      "url": "https://govt.westlaw.com/nycrr/Document/I505e1da3cd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)"
    }
  ],
  "region": "NY"
}
```
