# 753-3.1 Timing of notice for excavation or demolition.

**Citation:** 16 NYCRR 753-3.1  
**Type / status:** regulation / current  
**Agency:** New York State Public Service Commission  
**Effective:** Not stated  
**Published:** Not stated

Protection of Underground Facilities. (1) Before commencing or engaging in any nonemergency excavation or demolition, each excavator shall provide notice of the location and date of the planned excavation or demolition to the one-call notification system serving the vicinity in which the excavation or demolition is to take place.

(2) Such notice shall be served at least two but not more than 10

## Document text

(1) Before commencing or engaging in any nonemergency excavation or demolition, each excavator shall provide notice of the location and date of the planned excavation or demolition to the one-call notification system serving the vicinity in which the excavation or demolition is to take place.

(2) Such notice shall be served at least two but not more than 10 working days, not including the date of the call, before the commencement date of the excavation or demolition.

(b) Excavation or demolition which is required to be performed promptly as a result of an emergency, disaster or to correct an immediate hazard may proceed immediately without prior notification to operators, if the situation is so serious that the excavation or demolition cannot reasonably be delayed. However, excavators shall notify the one-call notification system as soon as possible that such excavation or demolition is commencing or is underway. Extreme caution shall be employed by the excavator to prevent damage to existing underground facilities and to avoid endangering persons and property.

(c) At least seven working days in advance of the commencement date of a demolition, the excavator shall request a pre-demolition conference, through the one-call notification system, with all member operators who have underground facilities at or near the demolition area. A pre-demolition conference may encompass one or more demolition(s) in the project area. A request for a pre-demolition conference is not a substitute for the notice of intent to perform demolition work required by this section.

(d) Whenever an excavator cancels an excavation or demolition, he or she shall promptly communicate the cancellation to facility operators utilizing the one-call notification system.

(1) Whenever an excavator postpones the commencement date for 10 or less working days, no call to the one-call notification system or operators is required.

(2) Whenever an excavator postpones an excavation or demolition more than 10 working days, the same requirements for notice shall pertain to the revised commencement date as listed in subdivision (a) of this section.

(e) Information requested from an operator for design purposes shall not be a substitute for the notice of intent to perform excavation or demolition as required by this Subpart.

## Provenance

- Official: Yes
- Source: <https://govt.westlaw.com/nycrr/Document/I50696857cd1711dda432a117e6e0f345?viewType=FullText&originationContext=documenttoc&transitionType=CategoryPageItem&contextData=(sc.Default)>
- Source ID: `ny-dps-nycrr`
- SHA-256: `6ec2c43f99544952eb84de65caee6710bc2e0a4c575a270f17cc9f436f9647da`
- Retrieved: 2026-08-12T06:20:40.894Z
- Exported: 2026-08-26T03:52:51.968Z
- Document slug: `ny-nycrr-753-3-1`

### Source metadata

```json
{
  "jurisdiction": "US-NY",
  "title": 16,
  "part": "753",
  "partTitle": "Protection of Underground Facilities",
  "scopeKind": "underground-damage-prevention",
  "tocPath": [
    "Part 753 Protection of Underground Facilities",
    "Subpart 753-3 Duties of Excavators"
  ],
  "legalScope": "Complete current terminal legal unit exposed by the DPS-designated Title 16 NYCRR pipeline-safety part inventory.",
  "applicabilityCaveat": "Applicability depends on the part and section, Commission jurisdiction, commodity and facility type, intrastate or interstate status, operator and activity, exemptions, waivers, federal preemption, Commission orders, and incorporated law. DPS inspects portions of interstate systems for PHMSA, but PHMSA retains federal enforcement authority. DPS states that all jurisdictional Part 256 gas-holder and Part 257 LPG-plant facilities have been decommissioned even though those regulations remain unrepealed.",
  "incorporationCaveat": "These parts incorporate or rely on federal pipeline regulations, federal and New York statutes, Commission rules and orders, and privately authored technical standards. Part 10 supplies incorporation details. References metadata preserves explicit citations but does not reproduce external material, determine licensing rights, or decide whether a particular incorporation is static or dynamic.",
  "publicationCaveat": "The New York Department of Public Service identifies these eleven Title 16 NYCRR parts as its state pipeline-safety regulations and links to the public DOS/Westlaw NYCRR reading copy. That site labels the online text unofficial and directs users needing evidentiary accuracy to the Official NYCRR maintained by the Department of State Division of Administrative Rules. Each section's 'Current through' date is the most recent official NYCRR supplement covering that section, not a uniform corpus-wide amendment date.",
  "rights": "New York government-edict text is preserved with DPS, Department of State, and publisher attribution. The public reading site's presentation and enhancements, agency marks, forms, annotations, and incorporated federal or privately authored standards require separate rights review; this connector does not claim rights in those materials.",
  "rightsReviewRequired": true,
  "currentThrough": "2023-02-28",
  "historyEvents": "No event is emitted because the section reading copy does not supply an explicit adoption, filing, or effective-date history.",
  "publisherCitation": "16 CRR-NY 753-3.1",
  "identityAnomaly": null,
  "references": [],
  "region": "NY"
}
```