# HOPKINTON LNG CO — Warning Letter

**Citation:** CPF 120073005W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2007-09-24

CLOSED warning letter citing 193.2619(c)(2).

## Document text

Warning Letter involving HOPKINTON LNG CO. PHMSA's enforcement data identifies the cited regulation as 193.2619(c)(2). The case was opened on 2007-09-24 and is reported as closed as of 2007-09-24. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120073005W_Warning Letter_09242007.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120073005W/120073005W_Warning%20Letter_09242007.pdf

120073005w_warning letter_09242007_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120073005W/120073005w_warning%20letter_09242007_text.pdf

120073005w_warning letter_09242007_text.pdf

409 3rd Street, SW, Suae 300
Washington DC 20024
u 5 Department
of Transportation
Pipeline and
Hazardous Mafenals Safety
Administration
WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT RE UESTED
September 24, 2007
Mr Plnl Andreas
Vice President of Operations
NSTAR/Hopktnton LNG Corporation
1 NSTAR Way
Westwood, MA 02090-9230
CPF I-2007-3005W
Dear Mr Andreas
Dunng the week of February 20, 2007, a representative of the Pipelme and Hazardous Matenals
Safety Admnustration (PHMSA) pursuant to Chapter 601 of 49 Umted States Code inspected
your hquefied natural gas (LNG) plant in Hopkinton, Massachusetts
As a result of the inspection, it appears that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations The items inspected and the
probable vtolatton is
1. I'1 193. 2619 Control systems.
(c)(2) Control systems that are intended for fire protection must be inspected and
tested at regular intervals not to exceed six months.
The following control components utihzed for fire protection require testing at intervals not to
exceed six months The required six month mspection and teshng interval for components of the
fire control system were exceeded as indicated in the table below



Component
PSL-FD-1
FSH-FD-1
PSH-1
LS-1
PSL-1
PSL-1306
PSL-1050
PSL-1410B
PSL-1032
PLS-1032A
TSHLC1050
PSL 3073-2
PSL 3073-1
PSL 3072-2
PSL 3071-1
NA
NA
NA
NA
NA
16. 10A
Test 9tstes
11/16/05, 6/8/06, 12/19/06
11/16/05& 6/8/06& 12/19/06
11/16/05, 6/1/06, 12/19/06
11/16/05, 6/8/06, 12/19/06
11/16/05, 6/8/06, 12/19/06
11/18/05& 6/2/06, 12/19/06
11/16/05, 6/2/06, 12/19/06
11/16/05, 6/1/06, 12/19/06
11/16/05, 6/2/06& 12/19/06
11/16/05, 6/2/06, 12/19/06
11/16/05, 6/1/06, 12/19/06
11/18/05, 6/2/06, 12/19/06
11/18/05, 6/2/06, 12/19/06
11/18/05, 6/2/06, 12/19/06
11/18/05, 6/2/06, 12/1906
11/21/05& 6/8/06, 12/19/06
12/12/04, 6/14/05
11/21/05, 6/8/06, 12/19/06
11/21/05, 6/8/06, 12/19/06
12/2/04, 6/14/05,
11/21/05, 6/8/06, 12/19/06
9esegtption
Low pressure settmg for fire water system
Set time delay for flrewater header
Spmnkler water flow
Deluge system tmgger hmit switch
Deluge system mtrogen pressure switch
Start/stop switch for elec Fire water pump
Start/stop switch for diesel tire water pump
Fire water task low level beacon
Jockey water pump set switch
Fire water switch, LP alarm
Suildiag vent control system
Firewater make-up control switch
Low firewater tank level switch
10" firewater makeup set switch
2" tirewater makeup set switch
Vapomzer deluge tlow switch
Vaponzer deluge flow switch *
HHP House foam llew alarm
Trader loadmg deluge flow alarm
Trailer loadiag deluge flow alarm*
Foam flow alarm
6-months exceeded by
'05 to 06' in '06
23 days, 11 days
23 days, 11 days
16 days, 18 days
23 days, 11 days
23 days, 11 days
15 days, 17 days
17 days, 17 days
16 days, 18 days
17 days, 17 days
17 days, 17 days
16 days, 18 days
15 days, 17 days
15 days, 17 days
15 days, 17 days
15 days, 17 days
18 days, 11 days
12 days, ('04 to '05)
18 days, 11 days
18 days, 11 days
12 day ('04 to '05)
18 days, 11 days



16. 10B
FS-2
NA
11/21/05, 6/8/06, 12/19/06
11/16/05, 6/1/06, 12/19/06
11/18/05, 6/2/06, 12/19/06
Foam now alarm
Diesel fw pump bldg sprinkler flow
Seasmg Liae
18 days, 11 days
16 days, 18 days
15 days, 17 days
(*Tins is the same component as in the preceding hne, but a violation was discovered in the
preceding 6-month interval )
The above intervals are based on the maintenance records reviewed dunng the inspection
Under 49 Umted States Code, II 60122, you are sub) ect to a civil penalty not to exceed $100, 000
for each violation for each day the violation persists up to a maximum of $1, 000, 000 for any
related senes of violations. Also, for LNG facilities, an additional penalty of not more than
$50, 000 for each violation may be imposed We have reviewed the circumstances and
supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time We advise you to correct the
item identified in this letter Failure to do so will result in NSTAR/Hopkinton LNG Corporation
being sub) ect to addktkonal enforcement action
No reply to this letter is required If you choose to reply, in your correspondence please refer to
CPF I-2007-3005W. Be advised that all matenal you submit in response to tlus enforcement
action is subJect to being made publicly available If you beheve that any portion of your
responsive material quahfies for confidential treatment under 5 U S C 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you beheve qualify for confidential treatment redacted and an explanation of why you believe
the redacted information quahfies for confidential treatment under 5 U S C 552(b)
Sincerely,
B on Coy, PE
Director, Eastern Region
Pipehne and Hazardous Matenals Safety Admkmstratkon

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/120073005W>
- Source ID: `phmsa-enforcement`
- SHA-256: `acdb6dd6b4878d02e6ff56955c80167f8f197f1fae9e465a5bf3615e2997d4cf`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T16:42:21.003Z
- Document slug: `phmsa-enforcement-120073005w`

### Source metadata

```json
{
  "cpf": "120073005W",
  "operator": "HOPKINTON LNG CO",
  "region": "Eastern",
  "pipelineType": "INTERSTATE LNG ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "193.2619(c)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "120073005W_Warning Letter_09242007.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120073005W/120073005W_Warning%20Letter_09242007.pdf",
      "bytes": 89539,
      "category": "agency_document"
    },
    {
      "name": "120073005w_warning letter_09242007_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120073005W/120073005w_warning%20letter_09242007_text.pdf",
      "bytes": 93444,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "HOPKINTON LNG CO"
}
```