Notice of Probable Violation involving TRANSCONTINENTAL GAS PIPE LINE COMPANY. PHMSA's enforcement data identifies the cited regulations as 192.457(a),  192.465(d). The case was opened on 2009-08-06 and is reported as closed as of 2009-11-17. Proposed civil penalty: $952,500. Assessed civil penalty: $952,500. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120091007_FinalOrder_11172009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_FinalOrder_11172009.pdf

120091007_FinalOrder_11172009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_FinalOrder_11172009_text.pdf

120091007_NOPV PCP_08062009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_NOPV%20PCP_08062009.pdf

120091007_NOPV PCP_08062009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_NOPV%20PCP_08062009_text.pdf

120091007_Operator Response_09042009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_Operator%20Response_09042009.pdf

120091007_FinalOrder_11172009_text.pdf

NOV 17 2009
Mr. Randall Barnard
Senior Vice President
Williams Gas Pipeline Company, LLC
2800 Post Oak Boulevard
P.O. Box 1396
Houston, TX 77251-1396
Re: CPF No. 1-2009-1007
Dear Mr. Barnard:
Enclosed is the Final Order issued in the above-referenced case. It makes findings of violation
and assesses a civil penalty of $952,500. I acknowledge receipt of your wire transfer of
$952,500 on September 4, 2009, and accept it as payment in full of the civil penalty. This case is
now closed. Your receipt of the Final Order constitutes service of that document under 49
C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Byron Coy, Director, Eastern Region, PHMSA
CERTIFIED MAIL – RETURN RECEIPT REQUESTED[7005 0390 0005 6162 5111]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Williams Gas Pipeline Company, LLC, ) CPF No. 1-2009-1007
)
Respondent. )
____________________________________)
FINAL ORDER
Pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety (OPS), conducted a post-accident
investigation of a pipeline failure that occurred on September 14, 2008, in Appomattox, Virginia
(Accident). Williams Gas Pipeline Company, LLC (Williams or Respondent) is the owner and
operator of the 30-inch pipeline (Line B) that ruptured. Williams is a major transmission
pipeline operator in the United States and owns and operates approximately 14,200 miles of
natural gas pipeline through its subsidiaries, Transcontinental Gas Pipe Line Corporation
(Transco) and Northwest Pipeline GP.1
As a result of the Accident and the ensuing explosion and fire, several homes were damaged or
destroyed. Five people were hospitalized with first- and second-degree burns. Twenty-three
families living in the vicinity of the failure site were evacuated and dozens of fire-fighters and
police officers responded to the scene.2 On September 25, 2008, PHMSA issued a Corrective
Action Order (CAO No. 1-2008-1004H) to Williams, requiring the company to take immediate
corrective actions to protect public safety.3
As a result of the post-accident investigation, the Director, Eastern Region, OPS (Director),
issued to Respondent, by letter dated August 6, 2009, a Notice of Probable Violation and
Proposed Civil Penalty (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that Respondent had violated 49 C.F.R. §§ 192.457(a) and 192.465(d) and assessing a
civil penalty of $952,500 for the alleged violations.
1 Transcontinental Gas Pipe Line Corporation operates a 10,500-mile natural gas pipeline system extending across
twelve states from Texas to New York City. Northwest Pipeline GP operates 3,900 miles of natural gas pipeline
through Washington, Oregon, Idaho, Wyoming, Utah, and Colorado.
2 See Pipeline Safety Violation Report (Violation Report), pg. 4 (August 7, 2009) (on file with PHMSA).
3 This Corrective Action Order (CAO) is currently open and will remain so until the required actions are deemed
complete by the OPS Eastern Region Director.



2
Williams responded to the Notice by letter dated September 4, 2009 (Response). The company
did not dispute the allegations of violation but clarified the remedial efforts it had undertaken in
response to the Accident. Williams did not request a hearing and therefore waived its right to
one. Respondent paid the full proposed civil penalty of $952,500 on September 4, 2009.
FINDINGS OF VIOLATION
Williams did not contest the allegations in the Notice that it violated 49 C.F.R. Part 192, as
follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.457(a), which states:
§ 192.457 External corrosion control: Buried or submerged
pipelines installed before August 1, 1971.
(a) Except for buried piping at compressor, regulator, and
measuring stations, each buried or submerged transmission line installed
before August 1, 1971, that has an effective external coating must be
cathodically protected along the entire area that is effectively coated, in
accordance with this subpart….
The Notice alleged that Williams violated 49 C.F.R. § 192.457(a) by failing to maintain cathodic
protection sufficient to control corrosion along that portion of its pipeline that had “an effective
external coating.
” Specifically, it alleged that Williams failed to maintain cathodic protection
along Line B in the area where the Accident occurred. Line B is a transmission pipeline
originally installed in 1955 with an external coating that required cathodic protection.
During the accident investigation, PHMSA reviewed the company’s corrosion control records for
the pipe in the vicinity of the Accident site, including the records of Williams’ 2003 and 2006
Close-Interval Survey (CIS) results. These records graphically depicted a dip in the pipe-to-soil
readings in the vicinity of the rupture site that were well below the -0.85 volt criteria of 49
C.F.R. Part 192, Appendix D (“Criteria for Cathodic Protection and Determination of
Measurements”). The 2003 CIS readings for Line B in the vicinity of the Accident site were
-0.530 and -0.690. The 2006 readings for the same test stations were measured at -0.542 and
-0.399. These readings demonstrated insufficient cathodic protection in the area of the Accident.
A third-party metallurgical lab tested a section of pipe after the Accident and confirmed that
external corrosion was the cause of the rupture. Accordingly, upon consideration of all of the
evidence, I find that Respondent violated 49 C.F.R. § 192.457(a) by failing to maintain cathodic
protection along the entire coated portion of Line B.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 192.465(d), which states:
§ 192.465 External corrosion control: Monitoring
(d) Each operator shall take prompt remedial action to correct any
deficiencies indicated by the monitoring….



3
The Notice alleged that Respondent violated § 192.465(d) by failing to take prompt remedial
action to correct deficiencies indicated by the company’s external corrosion monitoring.
Specifically, the Notice alleged that Williams failed to correct the cathodic protection
deficiencies discovered by the 2003 and 2006 CIS testing. In its Response, Williams did not
dispute that it failed to correct the known corrosion problem. The company instead confirmed
certain remedial actions it had conducted prior to the Accident.
Williams stated that it had attempted to address the low readings by installing a remote ground
bed near this location in 2004. Having again received low readings from the 2006 CIS, the
company then installed a linear anode in June 2007. However, follow-up readings were not
taken in 2007 or 2008 and the pipeline ruptured in September 2008. In its Response, Williams
stated that an in-line inspection for Line B was completed on June 23, 2008.4 Williams also
stated that the results of this in-line inspection were not received from the vendor until August
September 14, 2008, as a result of Williams’ failure to correct the low readings. Accordingly,
upon consideration of all of the evidence, I find that Respondent violated 49 C.F.R. § 192.465(d)
by failing to take prompt remedial action to correct the cathodic protection deficiencies
discovered on Line B.
15, 2008, and did not indicate an immediate safety problem.5 Unfortunately, the line ruptured on
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a penalty of $570,000 for the violation of 49 C.F.R. § 192.457(a) (Item 1),
for Williams’ failure to maintain cathodic protection sufficient to control corrosion along that
portion of its pipeline system with “an effective external coating.” Williams did not contest this
allegation of violation. I have reviewed and considered all of the evidence in the record,
including, but not limited to, the seriousness of the injuries, the property damage, and the
evacuation of families in the vicinity of the Accident. The accident in this case serves as a
4 Response, at 1.
5 Id.



4
graphic illustration of the tragic consequences that can result from a pipeline operator’s long-
term failure to address known corrosion problems. Accordingly, I find the proposed civil penalty
amount justified and assess a civil penalty of $570,000 for violation of 49 C.F.R. § 192.457(a).
The Notice further proposed a penalty of $382,500 for the violation of 49 C.F.R. § 192.465(d)
(Item 2), for Respondent’s failure to take prompt remedial action to correct deficiencies indicated
by the company’s own external corrosion monitoring. Williams did not contest this allegation
but asserted that it had taken measures to address corrosion problems, both before and after the
Accident. Despite such efforts, the company failed to conduct follow-up inspections to correct
the deficiencies detected by the monitoring.
It is incumbent upon all pipeline operators not only to monitor external corrosion on their lines
but also to act promptly to address deficiencies that become manifest as a result of monitoring. I
have reviewed and considered all of the evidence in the record, including, but not limited to, the
extent of the injuries and property damage, the evacuation of families in the vicinity of the
Accident, the length of time that external corrosion problems persisted on Line B, as well as the
actions Williams took in response to the corrosion, and find that the proposed civil penalty is
justified. Accordingly, I assess a civil penalty of $382,500 for violation of 49 C.F.R.
§ 192.465(d).
Therefore, I assess Respondent a total civil penalty of $952,500, which Respondent has already
remitted to PHMSA.
The terms and conditions of this Final Order shall be effective upon receipt.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/120091007>
- Source ID: `phmsa-enforcement`
- SHA-256: `3484976ea698664d5d3efa30df5f497fd6c047bfb24894b50635a2af56777009`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T04:59:20.055Z
- Document slug: `phmsa-enforcement-120091007`

### Source metadata

```json
{
  "cpf": "120091007",
  "operator": "TRANSCONTINENTAL GAS PIPE LINE COMPANY",
  "region": "Eastern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.457(a)",
    "192.465(d)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "120091007_FinalOrder_11172009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_FinalOrder_11172009.pdf",
      "bytes": 228647,
      "category": "agency_document"
    },
    {
      "name": "120091007_FinalOrder_11172009_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_FinalOrder_11172009_text.pdf",
      "bytes": 29465,
      "category": "agency_document"
    },
    {
      "name": "120091007_NOPV PCP_08062009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_NOPV%20PCP_08062009.pdf",
      "bytes": 300129,
      "category": "case_document"
    },
    {
      "name": "120091007_NOPV PCP_08062009_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_NOPV%20PCP_08062009_text.pdf",
      "bytes": 25275,
      "category": "case_document"
    },
    {
      "name": "120091007_Operator Response_09042009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120091007/120091007_Operator%20Response_09042009.pdf",
      "bytes": 141133,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TRANSCONTINENTAL GAS PIPE LINE COMPANY"
}
```