# COLUMBIA GAS TRANSMISSION, LLC — Notice of Amendment

**Citation:** CPF 120121010M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2012-04-12

CLOSED notice of amendment citing 192.605(b)(2).

## Document text

Notice of Amendment involving COLUMBIA GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulation as 192.605(b)(2). The case was opened on 2012-04-12 and is reported as closed as of 2013-02-20. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120121010M_Closure Letter_02202013 _text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_Closure%20Letter_02202013%20_text.pdf

120121010M_Closure Letter_02202013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_Closure%20Letter_02202013.pdf

120121010M_NOA_04122012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_NOA_04122012.pdf

120121010M_NOA_04122012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_NOA_04122012_text.pdf

120121010M_Operator Response _05112012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_Operator%20Response%20_05112012.pdf

120121010M_Closure Letter_02202013.pdf

@
U,S. Deportment
Of Tronsportotlon
Pipellne and
Hazardous Materials
Safety Adminlstration
820 Bear Tavem Road, Suits 103
West Trenton, NJ 08628
609.989.2171
UPS OVERNIGIIT DELIVERY
February 20, 2013
Mr. Shawn L. Patterson
President Engineering & Project Delivery
Columbia Pipeline Group
1700 MacCorkle Avenue SE
Charleston, WV 25314
cPF', t-2012-1010M
Dear Mr. Patterson:
3T1g ll".y::k ?ls"p,:Tqg. 19, ?_Ql_l . represenratives from the pipeline and Hazardous
y:,i"1:r^1i11y 1g11Tp!i."JpHrvtSA),.pursuanr.to chapter 60r bf 49 united states code,
'
:::::,":::-T gi;,tll:p,R:rtn" sarety inspection of Columbia Cas Transmission,s (Columbia)
procedues m Mlrtord. pennsylvania. As a result of the inspection, columbia *ui i..uid u
Notice of Amendment on Apiit 12,2012, which proposed imendment of your pioceduies.
columbia submitted its amended procedures on February g, 2013. My staffreviewed the
amended procedures, and it appears that the inadequaciei outlined in ihis Notice ofAmendment
have been corrected.
This letter is to inform you no fi'ther action is necessary and this case is now closed. Thank you
tor your cooperation.
Sincerely,
-a I
n/yw7 tr"l{. r[/
Byron Coy, PE
Director, Eastem Region
Pipeline and Hazardous Materials Safety Administration

120121010M_Closure Letter_02202013 _text.pdf

U.S. Department Of Transportation Pipeline and 609.989.2171
Hazardous Materials
Safety Administration
820 Bear Tavern Road, Suite 103
West Trenton, NJ 08628
UPS OVERNIGHT DELIVERY
February 20, 2013
Mr. Shawn L. Patterson
President Engineering & Project Delivery
Columbia Pipeline Group
1700 MacCorkle Avenue SE
Charleston, WV 25314
CPF 1-2012-1010M
Dear Mr. Patterson:
During the week of September 19, 2011, representatives from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Columbia Gas Transmission’s (Columbia)
procedures in Milford, Pennsylvania. As a result of the inspection, Columbia was issued a
Notice of Amendment on April 12, 2012, which proposed amendment of your procedures.
Columbia submitted its amended procedures on February 8, 2013. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Byron Coy, PE
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/120121010M>
- Source ID: `phmsa-enforcement`
- SHA-256: `2fb1b8e8ea81b18416e05b9662acdfe0c0ab58037dfd5a33df97a94cafe2fd86`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T08:42:56.702Z
- Document slug: `phmsa-enforcement-120121010m`

### Source metadata

```json
{
  "cpf": "120121010M",
  "operator": "COLUMBIA GAS TRANSMISSION, LLC",
  "region": "Eastern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.605(b)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "120121010M_Closure Letter_02202013 _text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_Closure%20Letter_02202013%20_text.pdf",
      "bytes": 26701,
      "category": "agency_document"
    },
    {
      "name": "120121010M_Closure Letter_02202013.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_Closure%20Letter_02202013.pdf",
      "bytes": 245605,
      "category": "agency_document"
    },
    {
      "name": "120121010M_NOA_04122012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_NOA_04122012.pdf",
      "bytes": 1341234,
      "category": "case_document"
    },
    {
      "name": "120121010M_NOA_04122012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_NOA_04122012_text.pdf",
      "bytes": 24732,
      "category": "case_document"
    },
    {
      "name": "120121010M_Operator Response _05112012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120121010M/120121010M_Operator%20Response%20_05112012.pdf",
      "bytes": 307568,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "COLUMBIA GAS TRANSMISSION, LLC"
}
```
