# ALGONQUIN GAS TRANSMISSION, L.L.C. (SPECTRA ENERGY PARTNERS, LP) — Notice of Amendment

**Citation:** CPF 120171019M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2017-12-05

CLOSED notice of amendment citing 192.605(b)(1).

## Document text

Notice of Amendment involving ALGONQUIN GAS TRANSMISSION, L.L.C. (SPECTRA ENERGY PARTNERS, LP). PHMSA's enforcement data identifies the cited regulation as 192.605(b)(1). The case was opened on 2017-12-05 and is reported as closed as of 2018-10-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120171019M_Closure Letter_10182018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171019M/120171019M_Closure%20Letter_10182018.pdf

120171019M_Closure Letter_10182018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171019M/120171019M_Closure%20Letter_10182018_text.pdf

120171019M_Notice of Amendment_12052017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171019M/120171019M_Notice%20of%20Amendment_12052017.pdf

120171019M_Notice of Amendment_12052017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171019M/120171019M_Notice%20of%20Amendment_12052017_text.pdf

120171019M_Closure Letter_10182018_text.pdf

OVERNIGHT EXPRESS DELIVERY
October 18, 2018
Michele Harradence
Vice President, Operations & EHS
Algonquin Gas Transmission, L.L.C. (Spectra Energy Partners, LP)
5400 Westheimer Court
Houston, TX 77056
CPF 1-2017-1019M
Dear Ms. Harradence:
On May 2 to 5, 2017, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-site
pipeline safety inspection of Algonquin Gas Transmission, L.L.C.’s (Algonquin), a subsidiary of
Enbridge Inc. (Enbridge) procedures. As a result of the inspection, Algonquin was issued a Notice
of Amendment on December 5, 2017, which proposed amendment of your procedures.
Algonquin submitted its amended procedures on September 12, 2018. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

120171019M_Notice of Amendment_12052017_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
December 5, 2017
J. Andrew Drake
Vice President, Operations & EHS
Algonquin Gas Transmission, L.L.C. (Spectra Energy Partners, LP)
5400 Westheimer Court
Houston, TX 77056
CPF 1-2017-1019M
Dear Mr. Drake:
From May 2 to 5, 2017, the Connecticut Department of Energy and Environmental Protection
(CT DEEP) acting as Agent for the Pipeline and Hazardous Materials Safety Administration
(PHMSA) pursuant to Chapter 601 of 49 United States Code, inspected the procedures of
Algonquin Gas Transmission, L.L.C. (Algonquin), a subsidiary of Enbridge Inc. (Enbridge).
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Algonquin’s plans or procedures, as described below:
1. § 192.605 Procedural manual for operations, maintenance, and emergencies.
(b) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following, if applicable, to provide safety
during maintenance and operations.
(1) Operating, maintaining, and repairing the pipeline in accordance with each of the
requirements of this subpart and Subpart M of this part.
Algonquin’s procedures for conducting operations and maintenance activities and for emergency
response were inadequate. Specifically, Algonquin’s gas detector maintenance procedure #4-3030,
Stationary Gas & Fire Detection Systems, dated 03/03/2017 (Gas Detection Procedure), and
associated record forms, did not contain sufficient details for documenting the performance testing
of gas detectors in accordance with § 192.736.



CPF 1-2017-1019M
Section 192.736 (b) and (c) state:
“(b) Except when shutdown of the system is necessary for maintenance under paragraph (c) of
this section, each gas detection and alarm system required by this section must-
(1) Continuously monitor the compressor building for a concentration of gas in air of not more
than 25 percent of the lower explosive limit; and
(2) If that concentration of gas is detected, warn persons about to enter the building and persons
inside the building of the danger.
(c) Each gas detection and alarm system required by this section must be maintained to function
properly. The maintenance must include performance tests.”
During the inspection, the CT DEEP Inspector reviewed Algonquin’s Gas Detection Procedure,
and Work Order records of gas detector testing and inspection. The Gas Detection Procedure states
in part:
2.0 T&I – Gas Detectors
…
2.2.1 Verify the following action:
2.2.1.1 20% LEL – low alarm trip point
2.2.1.2 40% LEL – high alarm trip point, if applicable.
…
7.0 Reporting
Solution Database.
7.1 Complete testing and inspection activities in the applicable Work Order within the EAM
Algonquin provided Work Order Details for Work Order Number 401132096 as records of gas
detector testing and inspection. The records reviewed did not contain documented values,
responses or dates for any of the steps outlined in the “Operations” portion of the record, including
“0050 Verify Audible and Visual Alarms”. The only information supplied in these records to
indicate that work was done was a “Completed Indicator” marking for each of the 17 gas detectors
at the associated location, and a finish date for the work order. The record did not indicate any
actual or set alarm trip points, or contain fields requiring that this information be documented.
Records of required maintenance activities must contain adequate details to demonstrate the work
completed. A record not indicating the performance test trip or set point is unable to verify that the
low alarm trip point is 20% LEL, as required by the Gas Detection Procedure, or below 25% LEL
as required by § 192.736 (b). The records did not provide adequate information to demonstrate
compliance with the Procedure or with § 192.736.
Therefore, Algonquin’s procedure and associated record form were inadequate with regards to gas
detector testing to demonstrate compliance with § 192.736.
120171019M_Notice of Amendment_12052017_text Page 2 of 4



CPF 1-2017-1019M
2. § 192.605 Procedural manual for operations, maintenance, and emergencies.
(b) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following, if applicable, to provide safety
during maintenance and operations.
(1) Operating, maintaining, and repairing the pipeline in accordance with each of the
requirements of this subpart and Subpart M of this part.
Algonquin’s procedures for conducting operations and maintenance activities and for emergency
response were inadequate. Specifically, Algonquin’s written procedure 1-6010, Pipeline Patrol
and Leakage Survey Frequency Criteria, dated 06/08/2010 (Survey Procedure), fails to provide
guidance consistent with Algonquin’s current practice of utilizing leak detection equipment in
areas where vegetation survey is impractical.
During the inspection, the CT DEEP inspector reviewed Algonquin’s Survey Procedure. The
Survey Procedure did not address right of way conditions that might hinder certain types of survey
methods. Algonquin performed leakage survey through vegetation survey, but in areas of
significant pavement, where vegetation survey is impractical, Algonquin used leak detection
equipment. This practice is consistent with PHMSA’s interpretation PI-09-0018 of § 192.706,
dated 11/5/2009, which states in part (emphasis added):
“…Therefore, under the current code language an operator could potentially utilize an alternate
leakage survey method such as an over-the-line vegetation survey in Class 1 and Class 2 locations
and for transmission lines with odor or odorant in Class 3 and Class 4 locations, but only if the
operator can demonstrate that such a survey would be effective in identifying any leaks. This
means that an over-the-line vegetation survey must be performed during the time of year when
vegetation is in its growth cycle (i.e., spring or summer) and the operator must be able to document
that such a survey would be effective based on the time of year, weather conditions, ground
visibility, soil conditions, location of the pipeline, etc. Even under these circumstances,
additional leakage survey methods potentially involving leak detection equipment would be
necessary in locations without vegetation cover such as road crossings, paved areas, dead soil
areas with no vegetation, and other such areas.”
The Survey Procedure did not require this use of an additional, effective leak detection method in
areas of significant pavement or areas where other conditions hinder the use of vegetation survey.
Therefore, Algonquin’s procedure was inadequate as it fails to provide guidance for taking
additional action in areas where vegetation survey is impractical.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
120171019M_Notice of Amendment_12052017_text Page 3 of 4



CPF 1-2017-1019M
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 90 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Algonquin Gas Transmission Co. (Spectra Energy Corp)
maintain documentation of the safety improvement costs associated with fulfilling this Notice of
Amendment (preparation/revision of plans, procedures) and submit the total to Robert Burrough,
Acting Director, PHMSA Eastern Region, 820 Bear Tavern Road, Suite 103, West Trenton,
NJ 08628. Please refer to CPF 1-2017-1019M on each document you submit, and whenever
possible provide a signed PDF copy in electronic format. Smaller files may be emailed to
robert.burrough@dot.gov. Larger files should be sent on a CD accompanied by the original paper
copy to the Eastern Region Office.
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Acting Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
Cc: Karl Baker, CT DEEP
120171019M_Notice of Amendment_12052017_text Page 4 of 4

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/120171019M>
- Source ID: `phmsa-enforcement`
- SHA-256: `e78ac588c18763cf0fa1738961171ed3dd748eb730da6c4cbcbdc1c96264c26b`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T14:17:37.549Z
- Document slug: `phmsa-enforcement-120171019m`

### Source metadata

```json
{
  "cpf": "120171019M",
  "operator": "ALGONQUIN GAS TRANSMISSION, L.L.C. (SPECTRA ENERGY PARTNERS, LP)",
  "region": "Eastern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.605(b)(1)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 4,
  "attachments": [
    {
      "name": "120171019M_Closure Letter_10182018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171019M/120171019M_Closure%20Letter_10182018.pdf",
      "bytes": 68624,
      "category": "agency_document"
    },
    {
      "name": "120171019M_Closure Letter_10182018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171019M/120171019M_Closure%20Letter_10182018_text.pdf",
      "bytes": 238483,
      "category": "agency_document"
    },
    {
      "name": "120171019M_Notice of Amendment_12052017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171019M/120171019M_Notice%20of%20Amendment_12052017.pdf",
      "bytes": 389264,
      "category": "agency_document"
    },
    {
      "name": "120171019M_Notice of Amendment_12052017_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171019M/120171019M_Notice%20of%20Amendment_12052017_text.pdf",
      "bytes": 129749,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ALGONQUIN GAS TRANSMISSION, L.L.C. (SPECTRA ENERGY PARTNERS, LP)"
}
```