Notice of Amendment involving EASTERN SHORE NATURAL GAS CO. PHMSA's enforcement data identifies the cited regulation as 192.225(b). The case was opened on 2017-12-21 and is reported as closed as of 2018-01-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120171023M_Closure Letter_01222018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Closure%20Letter_01222018.pdf

120171023M_Closure Letter_01222018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Closure%20Letter_01222018_text.pdf

120171023M_Notice Of Amendment _12212017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Notice%20Of%20Amendment%20_12212017.pdf

120171023M_Notice Of Amendment_12212017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Notice%20Of%20Amendment_12212017_text.pdf

120171023M_Operator Response to Notice_01182018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Operator%20Response%20to%20Notice_01182018.pdf

120171023M_Notice Of Amendment _12212017.pdf

of Transportation
U.S. Department
820 Bear Tavern Road, Suite 103
Pipeline and
West Trenton, NJ 08628
Hazardous Materials
609.771.7800
Safety Administration
NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
December 21, 2017
Steven Thompson, Senior VP
Eastern Shore Natural Gas Company
909 Silver Lake Boulevard
Dover, DE 19901
CPF 1-2017-1023M
Dear Mr. Thompson:
From December 7-9, 2015, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Eastern
Shore Natural Gas Company's procedures for construction in Dover, DE.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
Eastern Shore Natural Gas Company's procedures, as described below:
1. § 192.225 Welding Procedures.
(b) Each welding procedure must be recorded in detail, including the results of the
is used.
qualifying tests. This record must be retained and followed whenever the procedure
Eastern Shore Natural Gas' (ESNG) welding procedures were inadequate. Specifically,
ESN's Construction Standards Manual did not record adequate details regarding time
between weld passes, as required by API Standard 1104 - Welding of Pipelines and Related
Facilities, 20th Edition (API 1104).
During the inspection, a PHMSA inspector reviewed ESN's Construction Standards Manual
- SMAW Procedure No 10, dated 03/16/2013 (Procedure).



CPF 1-2017-1023M
The Procedure stated in part under Section 10, Time Lapse Between Passes, "The time lapse
between subsequent passes is unlimited."
API 1104, Section 5.3.2.10 states:
The maximum time between the completion of the root bead and the start of the second
bead, as well as the maximum time between the completion of the second bead and the
start of other beads, shall be designated.
On January 15, 2016, API issued a technical interpretation clarifying the intent of Section
5.3.2.10 of API 1104 20th edition, stating "Yes, the intent of API 1104, Section 5.3.2.10 is
to identify the maximum time betcen the 1* pass and 2n' pass and the maximum time
between the 2d pass and 3rd
Therefore, ESNG's Procedure did not satisfy in part, the maximum time between the completion
of the second bead and the start of other beads, per the requirements of API 1104 Section 5.3.2.10.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 60 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 60 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 60 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Eastern Shore Natural Gas Company maintain documentation
of the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Robert Burrough, Director,
PHMSA Eastern Region, 820 Bear Tavern Road, Suite 103, West Trenton, NJ 08628. Please refer
to CPF 1- 2017-1023M on each document you submit, and whenever possible provide a signed
PDF copy in electronic format. Smaller files may be emailed to robert.burrough@dot.gov. Larger
files should be sent on a CD accompanied by the original paper copy to the Eastern Region Office.
120171023M_NOA_12212017(149831)
Page 2 of 3



CPF 1-2017-1023M
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Dit BaR
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
120171023M_NOA_12212017 (149831)
Page 3 of 3

120171023M_Notice Of Amendment_12212017_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
December 21, 2017
Steven Thompson, Senior VP
Eastern Shore Natural Gas Company
909 Silver Lake Boulevard
Dover, DE 19901
CPF 1-2017-1023M
Dear Mr. Thompson:
From December 7-9, 2015, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Eastern
Shore Natural Gas Company’s procedures for construction in Dover, DE.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
Eastern Shore Natural Gas Company’s procedures, as described below:
1. § 192.225 Welding Procedures.
…
(b) Each welding procedure must be recorded in detail, including the results of the
qualifying tests. This record must be retained and followed whenever the procedure
is used.
Eastern Shore Natural Gas’ (ESNG) welding procedures were inadequate. Specifically,
ESNG’s Construction Standards Manual did not record adequate details regarding time
between weld passes, as required by API Standard 1104 – Welding of Pipelines and Related
Facilities, 20th Edition (API 1104).
During the inspection, a PHMSA inspector reviewed ESNG’s Construction Standards Manual
‐ SMAW Procedure No 10, dated 03/16/2013 (Procedure).



CPF 1-2017-1023M
The Procedure stated in part under Section 10, Time Lapse Between Passes, “The time lapse
between subsequent passes is unlimited.”
API 1104, Section 5.3.2.10 states:
The maximum time between the completion of the root bead and the start of the second
bead, as well as the maximum time between the completion of the second bead and the
start of other beads, shall be designated.
On January 15, 2016, API issued a technical interpretation clarifying the intent of Section
5.3.2.10 of API 1104 20th edition, stating “Yes, the intent of API 1104, Section 5.3.2.10 is
to identify the maximum time between the 1st pass and 2nd pass and the maximum time
between the 2nd pass and 3rd pass.”
Therefore, ESNG’s Procedure did not satisfy in part, the maximum time between the completion
of the second bead and the start of other beads, per the requirements of API 1104 Section 5.3.2.10.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 60 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 60 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 60 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Eastern Shore Natural Gas Company maintain documentation
of the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Robert Burrough, Director,
PHMSA Eastern Region, 820 Bear Tavern Road, Suite 103, West Trenton, NJ 08628. Please refer
to CPF 1- 2017-1023M on each document you submit, and whenever possible provide a signed
PDF copy in electronic format. Smaller files may be emailed to robert.burrough@dot.gov. Larger
files should be sent on a CD accompanied by the original paper copy to the Eastern Region Office.
120171023M_Notice Of Amendment_12212017_text Page 2 of 3



CPF 1-2017-1023M
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
120171023M_Notice Of Amendment_12212017_text Page 3 of 3

120171023M_Closure Letter_01222018_text.pdf

OVERNIGHT EXPRESS DELIVERY
January 22, 2018
Steven Thompson, Senior VP
Eastern Shore Natural Gas Company
909 Silver Lake Boulevard
Dover, DE 19901
CPF 1-2017-1023M
Dear Mr. Thompson:
From December 7-9, 2015, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-site
pipeline safety inspection of Eastern Shore Natural Gas Company’s procedures in Dover, DE. As
a result of the inspection, Eastern Shore Natural Gas Company was issued a Notice of Amendment
on December 21, 2017, which proposed amendment of your procedures.
Eastern Shore Natural Gas Company submitted its amended procedures on January 18, 2018. My
staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice
of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/120171023M>
- Source ID: `phmsa-enforcement`
- SHA-256: `5c269492f865153e59a0cc66696f7c714d4b5817823226b55c671f0773544c52`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T21:27:37.135Z
- Document slug: `phmsa-enforcement-120171023m`

### Source metadata

```json
{
  "cpf": "120171023M",
  "operator": "EASTERN SHORE NATURAL GAS CO",
  "region": "Eastern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.225(b)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "120171023M_Closure Letter_01222018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Closure%20Letter_01222018.pdf",
      "bytes": 67705,
      "category": "agency_document"
    },
    {
      "name": "120171023M_Closure Letter_01222018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Closure%20Letter_01222018_text.pdf",
      "bytes": 66956,
      "category": "agency_document"
    },
    {
      "name": "120171023M_Notice Of Amendment _12212017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Notice%20Of%20Amendment%20_12212017.pdf",
      "bytes": 229221,
      "category": "agency_document"
    },
    {
      "name": "120171023M_Notice Of Amendment_12212017_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Notice%20Of%20Amendment_12212017_text.pdf",
      "bytes": 138381,
      "category": "agency_document"
    },
    {
      "name": "120171023M_Operator Response to Notice_01182018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120171023M/120171023M_Operator%20Response%20to%20Notice_01182018.pdf",
      "bytes": 181226,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 3,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "EASTERN SHORE NATURAL GAS CO"
}
```