# ENLINK OHIO RIVER VALLEY PIPELINE, LLC — Warning Letter

**Citation:** CPF 120196001W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2019-01-08

CLOSED warning letter citing 195.428(a).

## Document text

Warning Letter involving ENLINK OHIO RIVER VALLEY PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulation as 195.428(a). The case was opened on 2019-01-08 and is reported as closed as of 2019-01-08. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120196001W_Warning Letter_01082019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120196001W/120196001W_Warning%20Letter_01082019.pdf

120196001W_Warning Letter_01082019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120196001W/120196001W_Warning%20Letter_01082019_text.pdf

120196001W_Warning Letter_01082019_text.pdf

WARNING LETTER
OVERNIGHT EXPRESS DELIVERY
January 8, 2019
Michael LeBlanc
Senior Vice President - Operations
EnLink LBU-ORV
60995 Derrick Road
Plaquemine, LA 70764
CPF 1-2019-6001W
Dear Mr. LeBlanc:
From March 20 to May 24, 2018, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected
the EnLink LBU-ORV (EnLink) crude oil pipeline system in the vicinity of Nashport, Ohio.
As a result of the inspection, it is alleged that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violation(s) are:
1. § 195.428 Overpressure safety devices and overfill protection systems.
(a) Except as provided in paragraph (b) of this section, each operator shall, at
intervals not exceeding 15 months, but at least once each calendar year, or in the
case of pipelines used to carry highly volatile liquids, at intervals not to exceed 7½
months, but at least twice each calendar year, inspect and test each pressure
limiting device, relief valve, pressure regulator, or other item of pressure control
equipment to determine that it is functioning properly, is in good mechanical
condition, and is adequate from the standpoint of capacity and reliability of
operation for the service in which it is used.
EnLink failed to adequately document its inspection and testing of pressure limiting devices.
Specifically, the records of inspection and testing of the overpressure protection (OPP) devices



CPF 1-2019-6001W
(pump outlet high pressure switches) at Corning Station and Black Run Station failed to
demonstrate that the devices functioned properly or were adequate from the standpoint of
reliability of operation.
During the inspection, records of the inspection and testing of OPP devices at the Corning and
Black Run Stations were reviewed for 2015-2018. It was established that the MOP of the pipeline
downstream of the Corning Station is 939 psig. The records documenting the 2015 and 2016 tests
of the pump OPP device noted that the set pressure was left below this MOP. The 2017 and 2018
test records for the OPP device documented the set pressure was left above the MOP of the
pipeline, in both years, at 950 psig. No comments noting a change were included in the records,
and no documentation through a Management of Change (MOC) memorandum was provided
during the inspection.
In addition, the 2016 test record did not clearly document what “as-left” set pressure was
confirmed, since a range of values were recorded.
For the Black Run Station OPP device, the records demonstrated that it was set to operate at 900
psig in 2017. The MOP of the pipeline downstream of the Black Run Station is 892 psig, and the
2017 test record documented that the set pressure was left above the MOP of the pipeline. No
comments noting a change were included in the records, and no documentation through a
Management of Change (MOC) memorandum was provided during the inspection.
Additionally, the 2018 test record does not document any “as-left” set pressure, but only notes that
the gauge is “in spec.”.
Therefore, EnLink failed to adequately document its inspection and tests of the OPP devices at the
Corning and Black Run Stations.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$213,268 per violation per day the violation persists, up to a maximum of $2,132,679 for a related
series of violations. For violation occurring on or after November 2, 2015 and before November
27, 2018, the maximum penalty may not exceed $209,002 per violation per day, with a maximum
penalty not to exceed $2,090,022. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty not to
exceed $2,000,000 for a related series of violations. We have reviewed the circumstances and
supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct the
item(s) identified in this letter. Failure to do so will result in EnLink being subject to additional
enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 1-2019-6001W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
120196001W_Warning Letter_01082019_text Page 2 of 3



CPF 1-2019-6001W
you believe qualify for confidential treatment redacted and an explanation of why you believe the
redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
No reply to this letter is required. If you choose to reply, please submit all correspondence in this
matter to Robert Burrough, Director, PHMSA Eastern Region, 840 Bear Tavern Road, Suite 300,
West Trenton, NJ 08628. Please refer to CPF 1-2019-6001W on each document you submit, and
whenever possible provide a signed PDF copy in electronic format. Smaller files may be emailed
to robert.burrough@dot.gov. Larger files should be sent on a CD accompanied by the original
paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
120196001W_Warning Letter_01082019_text Page 3 of 3

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/120196001W>
- Source ID: `phmsa-enforcement`
- SHA-256: `a36bf437193de04c989d64bba49933d04b2c33e68a1968e4c25e52f112ffaa69`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T23:14:39.358Z
- Document slug: `phmsa-enforcement-120196001w`

### Source metadata

```json
{
  "cpf": "120196001W",
  "operator": "ENLINK OHIO RIVER VALLEY PIPELINE, LLC",
  "region": "Eastern",
  "pipelineType": "INTRASTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.428(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "120196001W_Warning Letter_01082019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120196001W/120196001W_Warning%20Letter_01082019.pdf",
      "bytes": 235302,
      "category": "agency_document"
    },
    {
      "name": "120196001W_Warning Letter_01082019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120196001W/120196001W_Warning%20Letter_01082019_text.pdf",
      "bytes": 98672,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ENLINK OHIO RIVER VALLEY PIPELINE, LLC"
}
```