# UGI ENERGY SERVICES — Notice of Amendment

**Citation:** CPF 120201029M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2020-07-16

CLOSED notice of amendment citing 192.605(b)(2), 192.605(b)(3), 192.605(b)(8), 192.907(a).

## Document text

Notice of Amendment involving UGI ENERGY SERVICES. PHMSA's enforcement data identifies the cited regulations as 192.605(b)(2),  192.605(b)(3),  192.605(b)(8),  192.907(a). The case was opened on 2020-07-16 and is reported as closed as of 2020-10-01. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

120201029M_Closure Letter_10012020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Closure%20Letter_10012020.pdf

120201029M_Closure Letter_10012020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Closure%20Letter_10012020_text.pdf

120201029M_Notice of Amendment_07162020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Notice%20of%20Amendment_07162020.pdf

120201029M_Notice of Amendment_07162020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Notice%20of%20Amendment_07162020_text.pdf

120201029M_Operator Response to Notice_08142020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Operator%20Response%20to%20Notice_08142020.pdf

120201029M_Closure Letter_10012020_text.pdf

OVERNIGHT EXPRESS DELIVERY
October 1, 2020
Joseph L. Hartz
President
UGI Energy Services
1 Meridian Blvd
Wyomissing, PA 19610
CPF 1-2020-1029M
Dear Mr. Hartz:
On August 5 - 15, 2019, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, conducted an on-
site pipeline safety inspection of UGI Energy Service’s (UGI) procedures in Meshoppen,
Allentown, and Mansfield, Pennsylvania. As a result of the inspection, UGI was issued a Notice
of Amendment on July 16, 2020, which proposed amendment of your procedures.
UGI submitted its amended procedures on or about August 17, 2020. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

120201029M_Notice of Amendment_07162020_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
July 16, 2020
Joseph L. Hartz
President
UGI Energy Services
835 Knitting Mills Way
Wyomissing, PA 19610
CPF 1-2020-1029M
Dear Mr. Hartz:
From August 5 – 15, 2019, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.) performed
an integrated inspection of UGI Energy Service’s (UGI) records and procedures at your facilities
in Meshoppen, Allentown, and Mansfield, Pennsylvania.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
UGI’s plans or procedures, as described below:
1. § 192.605 Procedure manual for operations, maintenance and emergencies.
(a) …
(b) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following,
if applicable, to provide safety during maintenance and operations.
(1) …
(2) Controlling corrosion in accordance with the operation and
maintenance requirements of subpart I of this part.
UGI’s manual for operations, maintenance and emergencies was inadequate. Specifically, UGI’s
001-04-SP-101, General Specification, Below Grade Coating Specification, dated May 20, 2015
(Coating Specification) failed to address the field coating of girth welds.
The Coating Specification did not address the field coating of girth welds. The Coating
Specification also did not include information such as the characteristics of coatings to be used,
surface preparation requirements, and application standards specific to field coating of girth welds.



CPF 1-2020-1029M
Therefore, UGI’s Coating Specification was inadequate with regard to field coating of girth welds
as it applies to § 192.455(a)(1)1. UGI must amend its Coating Specification to include procedures
for field coating of girth welds.
2. § 192.605 Procedure manual for operations, maintenance and emergencies.
(a) …
(b) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following,
if applicable, to provide safety during maintenance and operations.
(1) …
(2) Controlling corrosion in accordance with the operation and
maintenance requirements of subpart I of this part.
UGI’s manual for operations, maintenance and emergencies was inadequate. Specifically, UGI’s
Gas Operations Manual, Procedure 40.30.60, Requirements for Corrosion Control – O & M
Procedures, last reviewed 7/24/2019 (Corrosion Control Procedure), failed to include sufficient
guidance regarding the requirements of § 192.467(f).
Section 192.467(f) states:
Where a pipeline is located in close proximity to electrical transmission tower footings,
ground cables or counterpoise, or in other areas where fault currents or unusual risk of
lightning may be anticipated, it must be provided with protection against damage due
to fault currents or lightning, and protective measures must also be taken at insulating
devices.
UGI’s Corrosion Control Procedure did not include guidance for determining when protection
against damage from fault currents or lightning is needed. The procedures did not include guidance
about how to protect the pipeline facility from fault currents and lightning, did not define what
‘close proximity’ means, and did not address what determines that a pipeline facility needs
protection from lightning or other fault currents.
Therefore, UGI’s Corrosion Control Procedure was inadequate regarding the requirements of
§ 192.467(f). UGI must amend its Corrosion Control Procedure to include guidance for
determining when protection against damage from fault currents or lightning is needed.
1 Section 192.455(a)(1) states:
(a) Except as provided in paragraphs (b), (c), (f) and (g) of this section, each buried or submerged pipeline installed
after July 31, 1971, must be protected against external corrosion, including the following:
(1) It must have an external protective coating meeting the requirements of § 192.461.
120201029M_Notice of Amendment_07162020_text Page 2 of 6



CPF 1-2020-1029M
3. § 192.605 Procedure manual for operations, maintenance and emergencies.
(a) …
(b) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following,
if applicable, to provide safety during maintenance and operations.
(1) …
(2) Controlling corrosion in accordance with the operation and
maintenance requirements of subpart I of this part.
UGI’s manual for operations, maintenance and emergencies was inadequate. Specifically, UGI’s
Corrosion Control Procedure failed to include sufficient guidance regarding the requirements of
§ 192.481(c).
Section 192.481(c) states that: “If atmospheric corrosion is found during an inspection, the
operator must provide protection against the corrosion as required by §192.479.”
During the inspection, the PHMSA inspector reviewed records of atmospheric inspections
performed within the last 6 years. On some of the reports, atmospheric corrosion was noted as
being light or severe, yet the pipe coating was left as found. When asked to provide further
clarification, UGI was unable to provide clear guidance for differentiating between light and severe
corrosion, or the criteria used to determine when pipe impacted by corrosion should be repaired.
UGI was also unable to provide a follow-up mitigation/repair action plan with appropriate
timeframes for mitigating atmospheric corrosion. UGI provided its Corrosion Control Procedure,
but it failed to address these aspects of atmospheric corrosion inspection and follow up.
Therefore, UGI’s Corrosion Control Procedure was inadequate regarding the requirements of
§ 192.481(c). UGI must amend its Corrosion Control Procedure to correct this deficiency.
4. § 192.605 Procedure manual for operations, maintenance and emergencies.
(a) …
(b) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following,
if applicable, to provide safety during maintenance and operations.
(1) …
(3) Making construction records, maps, and operating history
available to appropriate operating personnel.
UGI’s manual for operations, maintenance and emergencies was inadequate. Specifically, UGI
Energy Services Gas Operations Manual (GOM) failed to include a procedure addressing the
requirements of § 192.605(b)(3).
UGI Energy Services GOM did not include a procedure for making construction records, maps,
and operating history available to appropriate operating personnel, if applicable, to provide safety
during maintenance and operations.
120201029M_Notice of Amendment_07162020_text Page 3 of 6



CPF 1-2020-1029M
Therefore, UGI’s O&M Manual was inadequate regarding the requirements of § 192.605(b)(3).
UGI must amend its O&M Manual to address this requirement.
5. § 192.605 Procedure manual for operations, maintenance and emergencies.
(a) …
(b) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following,
if applicable, to provide safety during maintenance and operations.
(1) …
(8) Periodically reviewing the work done by operating personnel to
determine the effectiveness, and adequacy of the procedures used in
normal operations and maintenance and modifying the procedures
when deficiencies are found.
UGI’s manual for operations, maintenance and emergencies was inadequate. Specifically, UGI’s
GOM failed to include a procedure addressing the requirements of § 192.605(b)(8).
Section 3.1 of UGI’s GOM 30.10.10 assigned responsibility for review and necessary modification
of the GOM to the Midstream Engineering Group. However, the procedure did not include a
requirement to perform a review of operating personnel’s work to determine the effectiveness and
adequacy of the procedures used for normal operations and maintenance.
Therefore, UGI’s GOM was inadequate regarding the requirements of § 192.605(b)(8). UGI must
amend its GOM to address this requirement.
6. § 192.907 What must an operator do to implement this subpart?
(a) General. No later than December 17, 2004, an operator of a
covered pipeline segment must develop and follow a written integrity
management program that contains all the elements described in §
192.911 and that addresses the risks on each covered transmission
pipeline segment. The initial integrity management program must
consist, at a minimum, of a framework that describes the process for
implementing each program element, how relevant decisions will be
made and by whom, a time line for completing the work to implement
the program element, and how information gained from experience will
be continuously incorporated into the program. The framework will
evolve into a more detailed and comprehensive program. An operator
must make continual improvements to the program.
UGI’s integrity management program procedures were inadequate. Specifically, UGI’s
Transmission Line Integrity Management Program, dated 12/04/2018 (TIMP), failed to include a
process for performing risk analysis to determine if an automatic shut off (ASV) or remote control
valve (RCV) would be an efficient means of adding protection to a high consequence area in the
event of a gas release, in accordance with § 192.935(c).
120201029M_Notice of Amendment_07162020_text Page 4 of 6



CPF 1-2020-1029M
Section 192.935(c) states:
Automatic shut-off valves (ASV) or Remote-control valves (RCV). If an operator
determines, based on a risk analysis, that an ASV or RCV would be an efficient means
of adding protection to a high consequence area in the event of a gas release, an operator
must install the ASV or RCV. In making that determination, an operator must, at least,
consider the following factors-- swiftness of leak detection and pipe shutdown
capabilities, the type of gas being transported, operating pressure, the rate of potential
release, pipeline profile, the potential for ignition, and location of nearest response
personnel.
UGI’s TIMP, Section 11 - Preventive and Mitigative Measures, did not have a risk-based
methodology for determining if an ASV or RCV should be added. A procedure providing guidance
on how a risk-based study should be undertaken regarding the need for an ASV or RCV,
considering the factors outlined in § 192.935(c), was not included in the plan.
Therefore, UGI’s TIMP failed to include all the elements described in § 192.911, as required by §
192.907(a). UGI must amend its TIMP to adequately address performing a risk-based study in
accordance with § 192.935(c).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that UGI Energy Services maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Robert Burrough, Director, PHMSA Eastern Region,
120201029M_Notice of Amendment_07162020_text Page 5 of 6



CPF 1-2020-1029M
840 Bear Tavern Road, Suite 300, West Trenton, NJ 08628. Please refer to CPF 1-2020-1029M
on each document you submit, and whenever possible provide a signed PDF copy in electronic
format. Smaller files may be emailed to robert.burrough@dot.gov. Larger files should be sent on
USB flash drive accompanied by the original paper copy to the Eastern Region Office.
Additionally, if you choose to respond to this (or any other case), please ensure that any response
letter pertains solely to one CPF case number.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
120201029M_Notice of Amendment_07162020_text Page 6 of 6

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/120201029M>
- Source ID: `phmsa-enforcement`
- SHA-256: `9b6950636271608e7ec1c2c3b4fac08aadb0f7487f79d2e4bddbc9f8951a2569`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T18:55:16.428Z
- Document slug: `phmsa-enforcement-120201029m`

### Source metadata

```json
{
  "cpf": "120201029M",
  "operator": "UGI ENERGY SERVICES",
  "region": "Eastern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.605(b)(2)",
    "192.605(b)(3)",
    "192.605(b)(8)",
    "192.907(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "120201029M_Closure Letter_10012020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Closure%20Letter_10012020.pdf",
      "bytes": 816528,
      "category": "agency_document"
    },
    {
      "name": "120201029M_Closure Letter_10012020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Closure%20Letter_10012020_text.pdf",
      "bytes": 78611,
      "category": "agency_document"
    },
    {
      "name": "120201029M_Notice of Amendment_07162020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Notice%20of%20Amendment_07162020.pdf",
      "bytes": 816619,
      "category": "agency_document"
    },
    {
      "name": "120201029M_Notice of Amendment_07162020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Notice%20of%20Amendment_07162020_text.pdf",
      "bytes": 153956,
      "category": "agency_document"
    },
    {
      "name": "120201029M_Operator Response to Notice_08142020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/120201029M/120201029M_Operator%20Response%20to%20Notice_08142020.pdf",
      "bytes": 1968393,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "UGI ENERGY SERVICES"
}
```