# SOUTHERN STAR CENTRAL GAS PIPELINE, INC — Notice of Amendment

**Citation:** CPF 12021038NOA  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2021-05-20

CLOSED notice of amendment citing 192.12(c).

## Document text

Notice of Amendment involving SOUTHERN STAR CENTRAL GAS PIPELINE, INC. PHMSA's enforcement data identifies the cited regulation as 192.12(c). The case was opened on 2021-05-20 and is reported as closed as of 2021-07-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12021038NOA_Closure Letter_07092021_(20-185140).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Closure%20Letter_07092021_(20-185140).pdf

12021038NOA_Closure Letter_07092021_(20-185140)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Closure%20Letter_07092021_(20-185140)_text.pdf

12021038NOA_Notice of Amendment_05202021_(20-185140).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Notice%20of%20Amendment_05202021_(20-185140).pdf

12021038NOA_Notice of Amendment_05202021_(20-185140)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Notice%20of%20Amendment_05202021_(20-185140)_text.pdf

12021038NOA_Operator Response to Notice_05262021_(20-185140).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Operator%20Response%20to%20Notice_05262021_(20-185140).pdf

12021038NOA_Closure Letter_07092021_(20-185140)_text.pdf

VIA ELECTRONIC MAIL TO: shawn.patterson@southernstar.com
July 9, 2021
Mr. Shawn Patterson
VP & Chief Operations Officer
Southern Star Central Gas Pipeline, Inc.
4700 State Route 56 P.O. Box 20010
Owensboro, Kentucky 42304-0010
CPF 1-2021-038-NOA
Dear Mr. Patterson:
On July 1, 2020, a representative from the Pipeline and Hazardous Materials Safety Administration
(PHMSA), pursuant to Chapter 601 of 49 United States Code, conducted an on-site pipeline safety
inspection of Southern Star Central Gas Pipeline, Inc’s procedures in Blackwell, Oklahoma. As a
result of the inspection, Southern Star Central Gas Pipeline, Inc. was issued a Notice of
Amendment on May 20, 2021, which proposed amendment of your procedures.
Southern Star Central Gas Pipeline, Inc submitted its amended procedures on May 26, 2021. My
staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice
of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

12021038NOA_Notice of Amendment_05202021_(20-185140)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
May 20, 2021
Mr. Jimmy Staton
President and CEO
Southern Star Central Gas Pipeline, Inc
4700 State Route 56
BOX 20010
Owensboro, KY 42301
CPF 1-2021-038-NOA
Dear Mr. Staton:
On June 30, 2020, an Incident occurred at Southern Star Central Gas Pipeline, Inc’s (SSCGP)
Blackwell Storage Field that resulted in the hospitalization of an employee due to an injury. The
Well 30 Incident (Incident) occurred around 12:00 PM during workover operations to isolate a
well that had annular pressures that exceeded operator’s thresholds. SSCGP was in the process of
relieving the pressure in the wellbore when an employee supervising the operations was struck on
the back of the head by equipment that was part of the apparatus used to relieve pressure from the
wellbore. The employee was administered first aid while an ambulance was dispatched and was
later admitted for head injuries.
On July 1, 2020, a representative of the Pipeline and Hazardous Materials Safety Administration
(PHMSA) pursuant to Chapter 601 of 49 United States Code investigated the Incident and
reviewed procedures that were in use at the time of the Incident in Blackwell, Oklahoma.
On the basis of the investigation, PHMSA has identified the apparent inadequacy found within
SSCGP’s plans or procedures, as described below:
1. § 192.12 Underground natural gas storage facilities.
(a) …
(c) Procedural manuals. Each operator of a UNGSF must prepare
and follow for each facility one or more manuals of written procedures
for conducting operations, maintenance, and emergency preparedness
and response activities under paragraphs (a) and (b) of this section.



CPF 1-2021-038-NOA
Each operator must keep records necessary to administer such
procedures and review and update these manuals at intervals not
exceeding 15 months, but at least once each calendar year. Each
operator must keep the appropriate parts of these manuals accessible
at locations where UNGSF work is being performed. Each operator
must have written procedures in place before commencing operations
or beginning an activity not yet implemented.
SSCGP’s written procedures for conducting operations, maintenance, and emergency
preparedness and response activities under § 192.12(b) were inadequate. Specifically, SSCGP’s
procedures did not describe the process used for workover operations in accordance with API RP
1171, Section 11.2 Procedures (Section 11.2).
Section 11.2 states in part:
The operator shall develop and follow procedures for the construction, operation, and
maintenance of natural gas storage wells and reservoirs to establish and maintain functional
integrity.
At the time of the investigation, SSCGP’s procedures did not state the precautions that should be
taken when using equipment that has not been approved for usage during workover operations.
Specifically, SSCGP’s procedures did not have provisions preventing the use of equipment that
can cause an uncontrolled release of gas.
Therefore, SSCGP’s written procedures required by § 192.12(c) were inadequate. SSCGP must
revise its written procedures to address this deficiency.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. 552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
12021038NOA_Notice of Amendment_05202021_(20-185140)_text Page 2 of 3



CPF 1-2021-038-NOA
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Southern Star Central Gas Pipeline, Inc maintain documentation
of the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Robert Burrough, Director,
Eastern Region, Pipeline and Hazardous Materials Safety Administration, 840 Bear Tavern Road,
Suite 300, West Trenton, NJ 08628. In correspondence concerning this matter, please refer to CPF
1-2021-038-NOA and, for each document you submit, please provide a copy in electronic format
whenever possible. Smaller files may be emailed to robert.burrough@dot.gov. Larger files should
be sent on USB flash drive accompanied by the original paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
12021038NOA_Notice of Amendment_05202021_(20-185140)_text Page 3 of 3

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/12021038NOA>
- Source ID: `phmsa-enforcement`
- SHA-256: `c7b2cb17f9f9ca42b6a7e564dfc3045531e7598cacae81886e4774dff1caf3be`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T05:25:28.812Z
- Document slug: `phmsa-enforcement-12021038noa`

### Source metadata

```json
{
  "cpf": "12021038NOA",
  "operator": "SOUTHERN STAR CENTRAL GAS PIPELINE, INC",
  "region": "Eastern",
  "pipelineType": "INTERSTATE UNDERGROUND NG STORAGE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.12(c)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "12021038NOA_Closure Letter_07092021_(20-185140).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Closure%20Letter_07092021_(20-185140).pdf",
      "bytes": 206285,
      "category": "agency_document"
    },
    {
      "name": "12021038NOA_Closure Letter_07092021_(20-185140)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Closure%20Letter_07092021_(20-185140)_text.pdf",
      "bytes": 85958,
      "category": "agency_document"
    },
    {
      "name": "12021038NOA_Notice of Amendment_05202021_(20-185140).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Notice%20of%20Amendment_05202021_(20-185140).pdf",
      "bytes": 737118,
      "category": "agency_document"
    },
    {
      "name": "12021038NOA_Notice of Amendment_05202021_(20-185140)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Notice%20of%20Amendment_05202021_(20-185140)_text.pdf",
      "bytes": 114009,
      "category": "agency_document"
    },
    {
      "name": "12021038NOA_Operator Response to Notice_05262021_(20-185140).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12021038NOA/12021038NOA_Operator%20Response%20to%20Notice_05262021_(20-185140).pdf",
      "bytes": 71702,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "SOUTHERN STAR CENTRAL GAS PIPELINE, INC"
}
```