CLOSED notice of amendment citing 192.12(c).

## Document text

Notice of Amendment involving PEOPLES GAS LIGHT & COKE CO. PHMSA's enforcement data identifies the cited regulation as 192.12(c). The case was opened on 2023-01-12 and is reported as closed as of 2023-06-01. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12023003NOA_Closure Letter_06012023_(21-220263).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Closure%20Letter_06012023_(21-220263).pdf

12023003NOA_Closure Letter_06012023_(21-220263)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Closure%20Letter_06012023_(21-220263)_text.pdf

12023003NOA_Notice of Amendment_01122023_(21-220263).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Notice%20of%20Amendment_01122023_(21-220263).pdf

12023003NOA_Notice of Amendment_01122023_(21-220263)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Notice%20of%20Amendment_01122023_(21-220263)_text.pdf

12023003NOA_Operator Response to Notice_02092023_(21-220263).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Operator%20Response%20to%20Notice_02092023_(21-220263).pdf

12023003NOA_Notice of Amendment_01122023_(21-220263)_text.pdf

NOTICE OF AMENDMENT
OVERNIGHT EXPRESS DELIVERY
January 12, 2023
Mr. Torrence Hinton
President
Peoples Gas Light and Coke Co
200 E Randolph Street
Chicago, Illinois 60601
CPF 1-2023-003-NOA
Dear Mr. Hinton:
From September 27, 2021 through September 30, 2021, the Illinois Department of Natural
Resources, Office of Oil and Gas Resource Management (IDNR), acting as a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49
United States Code (U.S.C.) inspected Peoples Gas Light and Coke Co’s (PGL) procedures for the
Manlove Underground Gas Storage Facility located in Champaign County, Illinois.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
PGL’s plans or procedures, as described below1:
1. § 192.12 Underground natural gas storage facilities.
(a) …
(c) Procedural manuals. Each operator of a UNGSF must prepare
and follow for each facility one or more manuals of written procedures
for conducting operations, maintenance, and emergency preparedness
and response activities under paragraphs (a) and (b) of this section.
Each operator must keep records necessary to administer such
procedures and review and update these manuals at intervals not
exceeding 15 months, but at least once each calendar year. Each
operator must keep the appropriate parts of these manuals accessible
at locations where UNGSF work is being performed. Each operator
1 All citations are to Title 49 of the Code of Federal Regulations.



must have written procedures in place before commencing
operations or beginning an activity not yet implemented.
PGL’s written procedures for underground storage were inadequate to assure safe operation of a
pipeline facility. Specifically, PGL’s procedures, required by API RP 1171 (incorporated by
reference, see § 192.7), Section 11.2.1 failed to address API RP 1171, Sections 6.3.6 and 6.3.72
.
Section 11.2.1 states in part that “[t]he operator shall develop and follow procedures for the
construction, operation, and maintenance of natural gas storage wells and reservoirs to establish
and maintain functional integrity.”
During the inspection, PGL was unable to provide procedures addressing how it follows and
maintains records relative to the requirements of these sections of API RP 1171. PGL was unable
to demonstrate that it had adopted procedures meeting the provisions of API 1171 by January 18,
2018, and prior to the construction/workovers of well numbers 1, 10, and 20, or the plugging and
abandoning of well numbers 2 and 33.
Therefore, PGL’s procedures were inadequate regarding portions of Section 6 of API RP 1171.
PCL must develop and follow procedures relative to these portions of Section 6 as required by
Section 11.2.1.
2. § 192.12 Underground natural gas storage facilities.
(a) …
(c) Procedural manuals. Each operator of a UNGSF must prepare
and follow for each facility one or more manuals of written procedures
for conducting operations, maintenance, and emergency preparedness
and response activities under paragraphs (a) and (b) of this section.
Each operator must keep records necessary to administer such
procedures and review and update these manuals at intervals not
exceeding 15 months, but at least once each calendar year. Each
operator must keep the appropriate parts of these manuals accessible
at locations where UNGSF work is being performed. Each operator
must have written procedures in place before commencing operations
or beginning an activity not yet implemented.
2 Section 6.3.6 states, in part:
Casing shall be stored, transported, lifted and installed as specified by the manufacturer and in accordance with API
5C1.
Section 6.3.7 states, in part:
Casing connections shall be designed to accommodate loads associated with placement. The operator should
calculate the expected mechanical load conditions for casing in the vertical and/or directionally oriented conditions
during running, cementing, drilling, and operations and design the casing to have mechanical properties in excess of
the mechanical load conditions. The casing shall maintain a gas seal under anticipated wellbore flow conditions and
subsequent work in the wellbore (drilling, stimulation, and remediation).
Casing connections shall be made up according to manufacturer specifications or in accordance with API 5CT.
Thread compound or lubricant shall be compatible with the expected wellbore environment and shall be consistent
with the manufacturer’s recommended lubricant or API 5A3.



PGL’s written procedures for underground storage were inadequate to assure safe operation of a
pipeline facility. Specifically, PGL’s Underground Storage Risk and Integrity Management Plan
(IMP) did not include an adequate emergency preparedness/emergency response plan in
accordance with API RP 1171, Section 10.6.1 (Section 10.6.1).
Section 10.6.1 Emergency Preparedness/Emergency Response Plan states:
For site security and safety, the operator shall develop and implement a structured
emergency preparedness/response plan in order to address accidental releases, equipment
failures, natural disasters, and third-party emergencies. The operator should integrate
natural gas storage emergency procedures with regulatory required procedures covering
pipeline facilities where possible rather than creating storage-specific documents.
During the inspection, PGL’s IMP was reviewed, and third-party emergencies were not addressed
in those procedures.
Therefore, PGL’s written procedures required by § 192.12(c) were inadequate. PGL must revise
its procedures to include all required emergencies and potential possible responses to them in
accordance with API 1171, Section 10.6.1.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. 552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Peoples Gas Light and Coke Co maintain documentation of the



safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Robert Burrough, Director,
Eastern Region, Pipeline and Hazardous Materials Safety Administration, 840 Bear Tavern Road,
Suite 300, West Trenton, NJ 08628. In correspondence concerning this matter, please refer to CPF
1-2023-003-NOA and, for each document you submit, please provide a copy in electronic format
whenever possible. Smaller files may be emailed to robert.burrough@dot.gov. Larger files should
be sent on USB flash drive accompanied by the original paper copy to the Eastern Region Office.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings

12023003NOA_Closure Letter_06012023_(21-220263)_text.pdf

OVERNIGHT EXPRESS DELIVERY
June 1, 2023
Mr. Torrence Hinton
President
Peoples Gas Light and Coke Co
200 E Randolph Street
Chicago, Illinois 60601
CPF 1-2023-003-NOA
Dear Mr. Hinton:
From September 27, 2021 through September 30, 2021, the Illinois Department of Natural
Resources, Office of Oil and Gas Resource Management (IDNR), acting as a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49
United States Code (U.S.C.) inspected Peoples Gas Light and Coke Co’s (PGL) procedures for the
Manlove Underground Gas Storage Facility located in Champaign County, Illinois. As a result of
the inspection, PGL was issued a Notice of Amendment on January 12, 2023, which proposed
amendment of your procedures.
PGL submitted its amended procedures on February 9, 2023. PHMSA issued a Request for Further
Amendment on March 16, 2023, and PGL submitted its further amended procedures on April 13,
2023. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in
this Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/12023003NOA>
- Source ID: `phmsa-enforcement`
- SHA-256: `123dbb5a570a024dcefca574c70415d1bdbd75e2caf198fd6e6190f0a4d5f998`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T02:29:42.957Z
- Document slug: `phmsa-enforcement-12023003noa`

### Source metadata

```json
{
  "cpf": "12023003NOA",
  "operator": "PEOPLES GAS LIGHT & COKE CO",
  "region": "Eastern",
  "pipelineType": "INTRASTATE UNDERGROUND NG STORAGE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.12(c)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "12023003NOA_Closure Letter_06012023_(21-220263).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Closure%20Letter_06012023_(21-220263).pdf",
      "bytes": 401824,
      "category": "agency_document"
    },
    {
      "name": "12023003NOA_Closure Letter_06012023_(21-220263)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Closure%20Letter_06012023_(21-220263)_text.pdf",
      "bytes": 80425,
      "category": "agency_document"
    },
    {
      "name": "12023003NOA_Notice of Amendment_01122023_(21-220263).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Notice%20of%20Amendment_01122023_(21-220263).pdf",
      "bytes": 263972,
      "category": "agency_document"
    },
    {
      "name": "12023003NOA_Notice of Amendment_01122023_(21-220263)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Notice%20of%20Amendment_01122023_(21-220263)_text.pdf",
      "bytes": 122151,
      "category": "agency_document"
    },
    {
      "name": "12023003NOA_Operator Response to Notice_02092023_(21-220263).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12023003NOA/12023003NOA_Operator%20Response%20to%20Notice_02092023_(21-220263).pdf",
      "bytes": 807783,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "PEOPLES GAS LIGHT & COKE CO"
}
```