# COLUMBIA GAS TRANSMISSION, LLC — Notice of Amendment

**Citation:** CPF 12025024NOA  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2025-07-01

CLOSED notice of amendment citing 192.303.

## Document text

Notice of Amendment involving COLUMBIA GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulation as 192.303. The case was opened on 2025-07-01 and is reported as closed as of 2025-09-10. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

12025024NOA_Closure Letter_09102025_(24-296184).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Closure%20Letter_09102025_(24-296184).pdf

12025024NOA_Closure Letter_09102025_(24-296184)_txt.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Closure%20Letter_09102025_(24-296184)_txt.pdf

12025024NOA_Notice of Amendment_07012025_(24-296184).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Notice%20of%20Amendment_07012025_(24-296184).pdf

12025024NOA_Notice of Amendment_07012025_(24-296184)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Notice%20of%20Amendment_07012025_(24-296184)_text.pdf

12025024NOA_Operator Response to Notice_07302025_(24-296184).pdf: https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Operator%20Response%20to%20Notice_07302025_(24-296184).pdf

12025024NOA_Notice of Amendment_07012025_(24-296184)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: tina faraca@tcenergy.com
July 1, 2025
Ms. Tina Faraca
Executive Vice President and Chief Operating Officer
U.S. Natural Gas Pipelines
Columbia Gas Transmission, LLC, a subsidiary of TC Energy Corporation
700 Louisiana Street
Houston, Texas 77002
CPF 1-2025-024-NOA
Dear Ms. Faraca:
From February 27 through December 12, 2024, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.) inspected Columbia Gas Transmission, LLC’s (CGT) construction project at the Artemas
Compressor Station and the related CGT construction procedures in Artemas, Pennsylvania.
As a result of the inspection, PHMSA has identified the apparent inadequacy found within CGT’s
plans or procedures. The item inspected, alleged inadequacy, and proposed revision is described
below:
1. § 192.303 Compliance with specifications or standards.
Each transmission line or main must be constructed in accordance
with comprehensive written specifications or standards that are
consistent with this part.
CGT’s written procedures for constructing its pipeline are inadequate to assure safe operation in
accordance with section 192.303. Specifically, CGT’s TC Energy Engineering List: TEL-MA-
STD-G Materials List for Gas Piping System, Rev-1 (10/1/21) (Materials List), failed to reference
the edition of the American Society of Mechanical Engineers (ASME), Standard ASME/ANSI
B16.5, that is required by section 192.147(a) (Jan. 5, 2015).
1
1 § 192.147 Flanges and flange accessories.
(a) Each flange or flange accessory (other than cast iron) must meet the minimum requirements of ASME/ANSI B
16.5 and MSS SP-44 (incorporated by reference, see § 192.7), or the equivalent.



During the inspection, PHMSA reviewed TC Energy’s Engineering Specification: TES-MA-
FLGEU-GL Carbon Steel Butt-Welding Flanges, Rev-04 (4/19/24) (Engineering Spec), which
contained information regarding CGT’s use of manufactured carbon steel butt-welding flanges
with a specified outside diameter of NPS 16 (406.4 mm) and larger, and Carbon Steel Grade F42
(Grade 290) to Grade F80 (Grade 550). In accordance with the Engineering Spec, smaller sizes
(less than NPS 16) and lower grades of flanges may be used in accordance with its Materials List.
PHMSA then reviewed the Materials List, which stated in part that it is intended to list acceptable
industry standards and specifications applicable to CGT’s material requirements for new piping
systems. Tables 1-1, 1-2, and 1-3 of the Materials List included the standards and specifications
applicable to high-pressure gas pipeline and pipeline facilities, particularly specifying ASME
B16.5 as the standard applicable to flanges with NPS 4 to 14 for pipeline and to flanges with NPS
½ to 3 for pipeline assemblies and facilities. However, none of the tables, or any other section of
the Materials List or Engineering Spec, indicated the specific edition of the ASME B16.5 Standard
that is applicable to the listed flanges.
Therefore, CGT’s written procedures for constructing its pipeline are inadequate to assure safe
operation in accordance with section 192.303. PHMSA proposes that CGT must revise its
procedures to address this inadequacy.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 CFR § 190.206. Enclosed as part
of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you submit
in response to this enforcement action is subject to being made publicly available. If you believe
that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. §
552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under section 190.211. If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your plans
or procedures are found inadequate as alleged in this Notice, you may be ordered to amend your
plans or procedures to correct the inadequacies (49 CFR § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.



It is requested (not mandated) that Columbia Gas Transmission, LLC maintain documentation of
the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Robert Burrough, Director,
Eastern Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 1-2025-024-NOA and, for each document you submit,
please provide a copy in electronic format whenever possible.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings

12025024NOA_Closure Letter_09102025_(24-296184)_txt.pdf

U.S. Department
of Transportation
Pipeline and
Hazardous Materials
Safety Administration
840 Bear Tavern Road, Suite 300
West Trenton, NJ 08628
609.771.7800
VIA ELECTRONIC MAIL TO: tina_faraca@tcenergy.com
September 10, 2025
Ms. Tina Faraca
Executive Vice President and Chief Operating Officer
U.S. Natural Gas Pipelines
Columbia Gas Transmission, LLC, a subsidiary of TC Energy Corporation
700 Louisiana Street
Houston, Texas 77002
RE: CPF 1-2025-024-NOA
Dear Ms. Faraca:
From February 27 through December 12, 2024, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code
(U.S.C.), inspected Columbia Gas Transmission, LLC’s (CGT) construction project at the Artemas
Compressor Station and the related CGT construction procedures in Artemas, Pennsylvania. As a
result of the inspection, CGT was issued a Notice of Amendment on July 1, 2025, which proposed
amendment of your procedures
CGT submitted its amended procedures on July 30, 2025. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

12025024NOA_Closure Letter_09102025_(24-296184).pdf

U.S. Department
of Transportation
Pipeline and
Hazardous Materials
Safety Administration
840 Bear Tavern Road, Suite 300
West Trenton, NJ 08628
609.771.7800
VIA ELECTRONIC MAIL TO: tina_faraca@tcenergy.com
September 10, 2025
Ms. Tina Faraca
Executive Vice President and Chief Operating Officer
U.S. Natural Gas Pipelines
Columbia Gas Transmission, LLC, a subsidiary of TC Energy Corporation
700 Louisiana Street
Houston, Texas 77002
RE: CPF 1-2025-024-NOA
Dear Ms. Faraca:
From February 27 through December 12, 2024, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code
(U.S.C.), inspected Columbia Gas Transmission, LLC’s (CGT) construction project at the Artemas
Compressor Station and the related CGT construction procedures in Artemas, Pennsylvania. As a
result of the inspection, CGT was issued a Notice of Amendment on July 1, 2025, which proposed
amendment of your procedures
CGT submitted its amended procedures on July 30, 2025. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Robert Burrough
Director, Eastern Region
Pipeline and Hazardous Materials Safety Administration

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/12025024NOA>
- Source ID: `phmsa-enforcement`
- SHA-256: `bf294c9d35bd21534b4e50cc3281facb0ff43829609affb64f6a541274c4983e`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T12:02:39.461Z
- Document slug: `phmsa-enforcement-12025024noa`

### Source metadata

```json
{
  "cpf": "12025024NOA",
  "operator": "COLUMBIA GAS TRANSMISSION, LLC",
  "region": "Eastern",
  "pipelineType": "INTERSTATE GAS TRANSMISSION",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.303"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "12025024NOA_Closure Letter_09102025_(24-296184).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Closure%20Letter_09102025_(24-296184).pdf",
      "bytes": 245632,
      "category": "agency_document"
    },
    {
      "name": "12025024NOA_Closure Letter_09102025_(24-296184)_txt.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Closure%20Letter_09102025_(24-296184)_txt.pdf",
      "bytes": 177237,
      "category": "agency_document"
    },
    {
      "name": "12025024NOA_Notice of Amendment_07012025_(24-296184).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Notice%20of%20Amendment_07012025_(24-296184).pdf",
      "bytes": 221352,
      "category": "agency_document"
    },
    {
      "name": "12025024NOA_Notice of Amendment_07012025_(24-296184)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Notice%20of%20Amendment_07012025_(24-296184)_text.pdf",
      "bytes": 136689,
      "category": "agency_document"
    },
    {
      "name": "12025024NOA_Operator Response to Notice_07302025_(24-296184).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/12025024NOA/12025024NOA_Operator%20Response%20to%20Notice_07302025_(24-296184).pdf",
      "bytes": 178935,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 3,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "COLUMBIA GAS TRANSMISSION, LLC"
}
```