# OZARK GAS TRANSMISSION, L.L.C — Notice of Probable Violation

**Citation:** CPF 220021004  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2002-03-07

CLOSED notice of probable violation citing 192.465(a), 192.517, 192.603(b), 192.605(a).

## Document text

Notice of Probable Violation involving OZARK GAS TRANSMISSION, L.L.C. PHMSA's enforcement data identifies the cited regulations as 192,  192.465(a),  192.517,  192.603(b),  192.605(a). The case was opened on 2002-03-07 and is reported as closed as of 2006-10-05. Proposed civil penalty: $41,000. Assessed civil penalty: $36,600. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220021004_Decision On Petition_12312003.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_Decision%20On%20Petition_12312003.pdf

220021004_decision on petition_12312003_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_decision%20on%20petition_12312003_text.pdf

220021004_Final Order_04292003.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_Final%20Order_04292003.pdf

220021004_final order_04292003_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_final%20order_04292003_text.pdf

220021004_Petition for Reconsideration_05282003.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_Petition%20for%20Reconsideration_05282003.pdf

CPF_NO_2-2002-1004.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220021004/CPF_NO_2-2002-1004.pdf

220021004_decision on petition_12312003_text.pdf

U, S. Department
of Transportation
Research and
Special Programs
Administration
400 Seventh Street, S W
Room 8407
Washington, D C 20590
Phone (202) 366-4400
Fax (202) 366-7041
DEC 3 l Zo, "
Mr. E. Keith Mitchell
President
Ozark Gas Transmission L. L. C.
Suite 600
515 Central Park Drive
Oklahoma City, OK 73105
Re. : CPF No. 2-2002-1004
Dear Mr. Mitchell:
Enclosed is a decision on the Petition for Reconsideration filed in the above-referenced case.
The Associate Administrator for Pipeline Safety has denied the petition and therefore, payment of
the $36, 600 civil penalty is due immediately. Respondent must also now comply with the terms of
the Compliance Order contained in the Final Order issued to your company on April 29, 2003. The
penalty payment terms are set forth in the enclosed decision. Your receipt of this decision constitutes
proper service under 49 C. F. R. ) 190. 5.
Sincerely,
James Reynolds
Office of Pipeline Safety
Compliance Registry
Enclosure
CERTIFIED MAIL - RETURN RECEIPT RE UESTED



DEPARTMENT OF TRANSPORTATION
RESEARCH AND SPECIAL PROGRAMS ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
In the Matter of
Ozark Gas Transmission, L. L. C.
Respondent.
CPF No. 2-2002-1004
,
DECISION ON PETITION FOR RECONSIDERATION
This enforcement action began with a Notice of Probable Violation, Proposed Comphance Order,
and Proposed Civil Penalty (Notice) issued to Ozark Gas Transmission, L. L. C. (Respondent), on
March 7, 2002. Following issuance of the Notice, Respondent forwarded a letter to OPS explaining
the actions that it had taken in response to the proposed compliance order and requesting
"ehmination or mitigation" of the proposed civil penalty of $41, 000. The Associate Administrator
for Pipeline Safety took into account the response and issued a Final Order, pursuant to 49 U. S. C
$ 60122, assessing a civil penalty of $36, 600. The Final Order, issued on April 29, 2003, estabhshed
that Respondent violated 49 C. F. R. () 192. 517, 192. 603, and 192. 605.
On May 28, 2003, Respondent filed a Petition for Reconsideration (" Petition" ) formally requesting
reconsideration of the Final Order. Respondent raised several arguments. Respondent first asked
that a consent order be executed. Respondent also sought a further reduction in the civil penalty that
was assessed based upon the criteria estabhshed at 49 C. F. R. ) 190. 225 including Respondent's
"[positive] actions and good faith attempts to be in compliance, " and based upon "rehance of Ozark
on statements by DOT region personnel" that the penalty would be in a "much lower range"
(Petition, p 1) Finally Respondent contended that Arkansas Western Gas Company, not Ozark, is
the operator of the pipehne.
Regardmg Respondent's first argument, consent orders are considered in very hmited circumstances
Consent orders are only executed by the mutual agreement of the parties, and if no comphance order
under ( 190. 213 has been issued. Here, a compliance order under ( 190. 213 has already been issued.
Therefore, a consent order cannot now be executed.
Respondent next argued that it has taken positive steps to come into compliance, and that under
49 C F. R. ) 190. 225 it is entitled to "further mitigation of the penalty amount. " Respondent is
correct that section 190 225(e) specifies, among other factors, that the OPS Associate Administrator
shall consider "[a]ny good faith by the respondent in attempting to achieve comphance"
Respondent is advised that the appropriate stage for consideration of these factors is when the Fmal
Order is being prepared, and that these factors were fully considered when the penalty amount was
established in the Fmal Order



Respondent further argued that it rehed on "statements by DOT region personnel that the
recommendations for penalty were in a much lower range" (Petition, p 1) Although it is not
entirely clear, it appears that Respondent is assertmg that it did not protest the civil penalty amount
proposed in the Notice more strongly because it understood from DOT regional personnel that the
final penalty amount would be reduced. Even if DOT personnel did state that the civil penalty would
be reduced, such a representation would have created no obligation on the part of the agency because
Final Orders are approved and signed at the headquarters level, not at the regional office level In
other words, any written regional recommendations are placed in the enforcement case file before
the Associate Administrator receives the file and determines what action is appropriate.
Finally, Respondent asserted that although it acquired interest in the pipeline that is the subject of
this action in 1998, a third party, Arkansas Western Gas Company (AWG) operates "certain
portions" of the Ozark pipehne. It is not an uncommon practice in the pipehne industry for a
pipeline owner to turn over the operation and maintenance responsibihties to a third party. This
contractual arrangement does not absolve the owner from responsibihty, however. According to the
Definitions section of Part 192, an "operator" is a person who engages in the transportation of gas.
Therefore, by definition owners of natural gas pipehnes are subject to regulation under Part 192 since
they are engaged in the transportation of gas by pipeline. Whether the owner is an active participant
in the business operation or not is of no consequence. Enforcement and comphance actions may be
directed to either the owner or operator of pipehne facilities
Ozark next raised specific arguments with regard to the violations in the Final Order. Those
arguments, raised in Ozark's Petition, are addressed below in the order that they were raised.
With respect to Item 3, Ozark wrote that the Final Order incorrectly stated that Ozark had made a
commitment to determine required elevation variations for the purpose of determining the pipehne's
maximum allowable operating pressure (MAOP) within 60 days. Although it was not exphcitly
stated, the Final Order imphed that the determination would be made within 60 days of issuance of
the Notice. Respondent is correct that the Final Order failed to state that Ozark committed to
determining elevation variations withm 60 days of issuance of the Fina1 Order.
With respect to Items 4(a) through (d), Ozark argued that it submitted certain documentation to OPS
after the Notice letter was issued but before the Final Order was issued, and that based on the
adequacy of the information submitted and statements made by OPS personnel, it beheved that the
penalties associated with these items would "be dropped prior to the Fmal Order". ' (Petition, p. 2,
emphasis added). On page one of its Petition, Respondent said that it was told that the penalties
would be lowered. This discrepancy raises some question concerning precisely what was said to
Respondent's representatives. Nonetheless, as stated above, regional staff do not make final penalty
' The Notice alleged five instances (includmg Item 4(e) adch essed below) in which
Respondent failed to maintain adequate records necessary to administer the procedures
established under section 192. 605.



determmations. Furthermore, followmg Respondent's discovery ofhydrostatic testing records after
OPS' issuance of the Notice, the penalty amount for Item 4 was reduced from $22, 000 to $17, 600,
or one-fifth of the proposed penalty, to account for the discovery of records required by Item 4(a)
There were four other violations (items (b)-(e)) under Item 4. Respondent has not submitted any
additional evidence that would support further reduction in the penalty.
Ozark further asserted that third party contractor AWG, rather than Ozark, should have been cited
for Item 4(e) because AWG operates the portion of the pipeline where the violation occurred. As
stated above, OPS possesses the authority to cite either the owner or operator of pipeline facihties
operating in violation of the pipeline safety regulations. Therefore, this violation will not be
withdrawn
Respondent also contested the penalty imposed regarding Item 5(c) in the Notice. Item 5(c)
addressed Ozark's failure to record aerial patrols/leak surveys on a required form. Item 5 contained
two other violations, one for failure to correct low pipe-to-soil readings, and one for failure to
perform annual population density/class location studies. Although Respondent completed the aerial
patrol/leak survey reports that were the subject of Item 5(c) after the inspection was performed, the
reports were not complete at the time of the inspection. Respondent has not submitted any additional
information that would justify reduction of the penalty amount. Therefore, Respondent's request to
have this penalty mitigated is denied.
Respondent contested the finding of violation for Item 6, contending that AWG, not Ozark, is the
operator of the Mountain Home Lateral hne. Ozark specifically pointed to 49 C. F. R. ) 192. 605(a)
which indicates that the operator is the party responsible for insuring compliance with this
regulation As stated above, by definition an operator is any party engaged in the transportation of
gas Therefore, Ozark may properly be held responsible for this violation.
Payment of the full civil penalty in the amount of $36, 600 must be made within 20 days of service.
Federal regulations (49 C. F. R $ 89. 21(b)(3)) require this payment be made by wire transfer, through
the Federal Reserve Communications System (Fedwire), to the account of the U S. Treasury.
Detailed instructions are contained m the enclosure. Questions concerning wire transfers should be
directed to: Federal Aviation Administration, Mike Monroney Aeronautical Center, Financial
Operations Division, (AMZ-320), P. O. Box 25082, Oklahoma City, OK 73125; telephone number
(405) 954-4719.
Failure to pay the civil penalty will result in accrual of interest at the current annual rate in
accordance with 31 U. S. C. $ 3717, 4 C. F. R. $ 102. 13 and 49 C F. R. ) 89. 23. Pursuant to those same
authorities, a late penalty charge of six percent (6%) per annum will be charged if payment is not
made within 110 days of service. Furthermore, failure to pay the civil penalty may result in referral
of the matter to the Attorney General for appropriate action in an United States District Court



Respondent is further directed to comply with the terms of the Comphance Order contained in the
Final Order within 60 days of receipt of this Petition. This decision on reconsideration is the final
administrative action in this proceeding.
StaceyL. G' a
Associate dministrator
for Pipehne Safety
Date Issued

220021004_final order_04292003_text.pdf

O
US Department
of Trdnsportatton
Research and
Special Programs
Administration
400 Seventh Street, S W
Washington, D C 20590
APR 29 m03
Mr. E. Keith Mitchell, President
Ozark Gas Transmission, L. L. C.
515 Central Park Drive, Suite 600
Oklahoma City, OK 73105
RE: CPF No. 2-2002-1004
Dear Mr. Mitchell:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in the
above-referenced case. It makes findings of violations, assesses a civil penalty of $36, 600 and
requires certain corrective action. At such time that the terms of the compliance order are completed,
as determined by the Southern Regional Director and the civil penalty is paid, this enforcement
action will be closed. The penalty payment and terms are set forth in the Final Order. Your receipt
of the Final Order constitutes service of that document under 49 C. F. R. $ 190. 5.
Sincerely,
Gwendolyn M. Hi
Pipeline Compliance Registry
Office of Pipeline Safety
Eticlo sure
cc: Dan Harris, Vice-President Operations
CERTIFIED MAIL - RETURN RECEIPT RE UESTED



DEPARTMENT OF TRANSPORTATION
RESEARCH AND SPECIAL PROGRAMS ADMINISTRATION
WASHINGTON, DC 20590
In the Matter of
OZARK GAS TRANSMISSION,
Respondent.
CPF No. 2-2002-1004
FINAL ORDER
During May 7-11, 2001 and June 3-8, 2001, representatives of the Office of Pipeline Safety (OPS),
pursuant to 49 U. S. C. $ 60117, conducted on-site pipeline safety inspections of Respondent's
facilities in Oklahoma, Arkansas, and Missouri and records in Fort Smith and Fayetteville, Arkansas.
As a result of the inspections, the Director, Southern Region, OPS, issued to Respondent, by letter
dated March 7, 2002, a Notice of Probable Violation, Proposed Civil Penalty, and Proposed
Compliance Order. In accordance with 49 C. F. R. )190. 207, the Notice proposed finding that
Respondent had violated 49 C. F. R. )$192. 517, 192. 603, 192. 605 and proposed assessing a civil
penalty of $41, 000 for the alleged violations. The Notice also proposed that Respondent take certain
measures to correct the alleged violations.
In a letter dated April 10, 2002, Respondent submitted a Response to the Notice (Response).
Respondent contested some of the allegations, provided information concerning the corrective
actions it had taken and requested mitigation of the proposed civil penalty. On April 25, 2002,
Respondent submitted a supplemental Response to the Notice, providing additional documents and
information concerning the corrective actions it had taken. Respondent did not request a hearing,
consequently Respondent waived its right to one.
FINDINGS OF VIOLATION
Item 3 of the Notice alleged that Respondent violated 49 C. F. R. $192. 517 by not maintaining a
sufficient record of each test performed under $$ 192. 505 and 192. 507 for the Mountain Home
Lateral line, as test records did not contain elevation variations.
In its initial response to Item 3, Respondent stated that within 60 days it would determine significant
elevation differences along the Mountain Home Lateral line and determine the pipeline's maximum
allowable operating pressure (MAOP)



Respondent acknowledged that it was unable to provide test records containing elevation variations
at the time of the inspection. Although Respondent advised that it would submit documentation,
within 60 days, determining sigmficant elevation differences along the line, it has failed to do so.
Respondent has not shown any circumstance that would have prevented or justifled it not
maintaining a sufficient record with elevation variations of each test performed under g$ 192. 505
and 192. 507 of the Mountain Home Lateral line. Accordingly, I find that Respondent violated
49 C. F. R. )192. 517.
Item 4a-e of the Notice alleged that Respondent violated 49 C. F. R. $192. 603 by not maintaining
records necessary to administer the procedures established under $192. 605 There were (a) no
records to determine the MAOP of the 8. 5 mile 8-inch pipeline near Kennett, MO; (b) no records
of the main line regulator inspection in year 2000 for the 10-inch to 8-inch Kennett Line regulator;
(c) no documentation of required follow-up actions for patrol reports performed March 2000; (d) no
records of inspection of all valves that could be used in an emergency at the Mountain Home Tap,
Scotland Launcher Receiver site and Kennett Station; and (e) no records to indicate that blow off
valves were partially operated and inspected.
In its initial response to Item 4a, Respondent explained that it had located records that would allow
MAOP to be established by hydrostatic testing under the guidelines in 49 C. F. R. $192. 619. As for
Item 4b, Respondent acknowledged not having year 2000 inspection records for the 10-inch to 8-inch
Kennett Line regulator but advised that an inspection was performed in March 2002 and submitted
its "Downstream Pressure Over Ride Check" form. With regard to Item 4c, Respondent advised that
its patrol reports have been corrected to reflect follow up actions. As for Item 4d, Respondent stated
that it inspected the cited valves between August 3, 2001 and August 9, 2001 and listed them on the
proper valve form. In response to Item 4e, Respondent explained that it has an Operating and
Maintenance Agreement with Arkansas Western Gas Company (AWG) and that AWG has been
instructed to maintain all jurisdictional facilities to DOT standards and in compliance with
Respondent's operations and maintenance manual.
Respondent is responsible for compliance with the pipeline safety regulations, which includes sound
record keeping. Without this history, an operator will have difficultly determining areas where there
are problems that need to be addressed. The Notice alleged five instances in which Respondent
failed to maintain adequate records necessary to administer the procedures established under
$192. 605. Respondent does not deny that records cited in Item 4a, Item 4c, Item 4d and 4e were not
provided or properly maintained at the time of the inspection. Furthermore, Respondent
acknowledged not having the inspection records cited in Item 4b. Accordingly, I find that
Respondent violated 49 C. F. R. )192 603.
Item 5 of the Notice alleges that Respondent violated 49 C F. R )192. 605 by not following written
procedures (a) to take remedial measures where pipe-to-soil readings were not within the allowed
criteria; (b) to conduct an annual population density/class location study in 1999 or 2000 on its 20-
inch Ozark line and (c) to document West aerial patrols/leak siuveys on Form 3101, Pipeline Patrol
and Leak Survey Report.



In response, Respondent did not contest Item 5, but offered information in explanation of the
allegations. Respondent explained that it has engaged a third party contractor to perform a Line
PatroVLeak Survey and Density/Class location study. Respondent further explained that at the tiine
of the aerial patrol it was in the process of changing its forms. Respondent advised that it installed
5 insulator kits at the Davis station on June 20, 2001. Respondent further advised that its West
Aerial Patrols/Leak Survey reports have been transferred and documented on Form 3101 for the 2001
Pipeline Patrol and Leak Survey.
Respondent did not dispute the allegations in Item 5. Accordingly, I find that Respondent violated
49 C. F. R. $192. 605 (a) by not following written procedures for conducting operations and
maintenance activities and for emergency response.
Item 6 of the Notice alleges that Respondent violated 49 C. F. R. $192. 605(a) by failing to have its
procedure manual available to appropriate operating personnel to maintain its facilities. Respondent
has an agreement with AWG to operate and maintain Respondent's Mountain Home Lateral line and
certain meter/regulator stations. At time of the inspection, AWG personnel did not have
Respondent's procedure manual available. AWG personnel stated that they use AWG's Operation,
Inspection, and Maintenance Plan to maintain Respondent's facilities.
In its Response, Respondent did not contest the violation alleged in Item 6 of the Notice but offered
information in explanation of the allegation. Respondent explained that on February 28, 2002 it
provided an updated copy of its OAM manual to AWG and explained to AWG that all OAM
activities for Respondent's facilities are to be conducted in accordance with Respondent's 08cM
manual.
All gas and hazardous liquid pipeline operators must maintain and make available to appropriate
operating personnel a manual of written procedures for conducting operations and maintenance
activities and for emergency response to enable personnel to safely and effectively perform their
duties and maintain its facilities. Respondent did not dispute the allegations in Item 6. Accordingly,
I find that Respondent violated 49 C. F. R. $192. 605 by failing to have its written procedures for
conducting operations and maintenance activities available to appropriate operating personnel.
These findings of violation will be considered prior offenses in any subsequent enforcement action
taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U. S. C. $ 60122, Respondent is subject to a civil penalty not to exceed $100, 000 per
violation for each day of the violation up to a maximum of $1, 000, 000 for any related series of
violations.



49 U. S. C. $ 60122 and 49 C. F. R. $ 190. 225 require that, in determining the amount of the civil
penalty, I consider the following criteria: nature, circumstances, and gravity of the violation, degree
of Respondent's culpability, history of Respondent's prior offenses, Respondent's ability to pay the
penalty, good faith by Respondent in attempting to achieve compliance, the effect on Respondent's
ability to continue in business, and such other matters as justice may require. The Notice proposed
a total penalty assessment of $41, 000 for Items 4, 5, and 6.
The Notice proposed a civil penalty of $22, 000 for violations of 49 C. F. R. $192. 603(b), as
Respondent failed to maintain records necessary to administer the procedures established under
)192. 605. In response to Item 4, the Respondent requested elimination or mitigation of the proposed
$22, 000 civil penalty.
The Notice identified five instances in which Respondent failed to maintain records. Having
reviewed the record, considered the assessment criteria and Respoiident's submission of original
records (Item 4a) for the Kennett 8-inch pipeline, the civil penalty will be reduced proportionately.
Accordingly, I assess Respondent a civil penalty of $17, 600 for failing to maintain records necessary
to administer the procedures established under )192. 605, as described in Items 4 (b) - (e).
Item 5 of the Notice proposed a civil penalty of $14, 000 for Respondent's failure to follow written
procedures. Respondent did not contest Item 5, but offered information in explanation of the
allegations. Respondent has not shown any circumstance that would have prevented or justified it
not following written procedures as required by 49 C. F. R. $192. 605(a). Remedial measures for low
pipe-to-soil readings were not taken within 1 year. Adverse conditions should be corrected as soon
as possible and no later than the next inspection cycles. Respondent should have take prompt
remedial action to address the low pipe-to-soil readings, rather than wait for two or three cycles of
low readings before installing 5 insulator kits at the Davis station. Accordingly, having reviewed
the record and considered the assessment criteria, I assess Respondent a civil penalty of $14, 000 for
violation of 49 C. F. R. $192. 605(a).
Item 6 of the Notice proposed a civil penalty of $5, 000 for Respondent's failure to have its written
procedures for conducting operations and maintenance activities and for emergency response
available to appropriate operating personnel to maintain its facilities. Respondent has not shown any
circumstance that would have prevented or justified it not making its written procedures available.
Accordingly, having reviewed the record and considered the assessment criteria, I assess Respondent
a civil penalty of $5, 000 for violation of 49 C. F. R. $192. 605.
Accordingly, having reviewed the record and considered the assessment criteria, I assess Respondent
a total civil penalty of $36, 600. A determination has been made that Respondent has the ability to
pay this penalty without adversely affecting its ability to continue business.
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C. F. R. $ 89. 21(b)(3)) require this payment be made by wire transfer, through the Federal
Reserve Communications System (Fedwire), to the account of the U. S. Treasury.



Detailed instructions are contained in the enclosure. Questions concerning wire transfers should
be directed to: Financial Operations Division (AMZ-120), Federal Aviation Administration, Mike
Monroney Aeronautical Center, P. O. Box 25770, Oklahoma City, OK 73125; (405) 954-4719.
Failure to pay the $36, 600 civil penalty will result in accrual of interest at the current annual rate in
accordance with 31 U. S. C. $ 3717, 31 C F. R. $ 901. 9 and 49 C. F. R. $ 89. 23. Pursuant to those same
authorities, a late penalty charge of six percent (6%) per annum will be charged if payment is not
made within 110 days of service. Furthermore, failure to pay the civil penalty may result in referral
of the matter to the Attorney General for appropriate action in an United States District Court.
WARNING ITEMS
The Notice did not propose a civil penalty or corrective action with respect to Items 1, and 2;
therefore, these are considered warning items. Respondent is warned that if it does not take
appropriate action to correct the following items, enforcement action will be taken if a subsequent
inspection finds a violation.
49 C. F. R. )192, 465(a) - failing to test its16-inch Noark Line at test station MP 70. 06
for cathodic protection at least once each calendar year, but with intervals not
exceeding 15 months.
49 C. F. R. )192. 471(a) - failing to connect the test lead wire to its 16-inch Noark
pipeline at test station No. 46 (MP 229. 03). Survey records indicated "broken
wire"and no repairs were made in 1999 or 2000.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 3 and 4a. Respondent has
demonstrated corrective action addressing Item 4a by submitting the missing records and copies of
pipe mill records and hydrostatic tests reports of the Kennett 8-inch pipeline. Also Respondent has
determined the pipeline MAOP to be 915 psig. These measures are accepted as adequately fulfilhng
the requirements of the pipehne safety regulations.
Under 49 U. S. C. $ 60118(a), each person who engages in the transportation of gas or who owns or
operates a pipeline facility is required to comply with the applicable safety standards established
under chapter 601. Pursuant to the authority of 49 U. S. C. ) 60118(b) and 49 C. F. R. $ 190 217,
Respondent is hereby ordered to take the following actions related to Item 3 of the Notice to ensure
compliance with the pipeline safety regulations applicable to its operations.
1) With respect to Item 3, violation of 49 C. F. R. $192. 517, determine significant elevation
differences along the Mountain Home Lateral line and use hydrostatic test records to
determine and/or re-confirm pipeline MAOP in accordance with )192. 619. Complete this
work within 60 days following receipt of the Final Order. Submit the records and notice of
completed actions to the Southern Regional Director, Office of Pipehne Safety, 61 Forsyth
Street, SW, Suite 16T15, Atlanta, GA 30303.



2) The Southern Regional Director, may grant an extension of time for compliance with any
of the terms of this order for good cause. A request for an extension must be in writing.
Under 49 C. F. R. ) 190. 215, Respondent has a right to petition for reconsideration of this Final
Order. The petition must be received within 20 days of Respondent's receipt of this Final Order and
must contain a brief statement of the issue(s). The filing of the petition automatically stays the
payment of any civil penalty assessed. All other terms of the order, including any required corrective
action, shall remain in full effect unless the Associate Administrator, upon request, grants a stay.
The terms and conditions of this Final Order are effective upon receipt.
Failure to comply with this Final Order may result in the assessment of civil penalties of up to
$100, 000 per violation per day, or in the referral of the case for judicial enforcement.
APR 29 ZL3
Date Issued
Stacey Gerard
Associate Administrator
for Pipehne Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220021004>
- Source ID: `phmsa-enforcement`
- SHA-256: `4fc217ee4a230117ad39657a54e94fd8e18ad9d0ea61a69cad7c2489edc891e7`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T16:46:04.011Z
- Document slug: `phmsa-enforcement-220021004`

### Source metadata

```json
{
  "cpf": "220021004",
  "operator": "OZARK GAS TRANSMISSION, L.L.C",
  "region": "Southern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.465(a)",
    "192.517",
    "192.603(b)",
    "192.605(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 6,
  "attachments": [
    {
      "name": "220021004_Decision On Petition_12312003.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_Decision%20On%20Petition_12312003.pdf",
      "bytes": 274257,
      "category": "agency_document"
    },
    {
      "name": "220021004_decision on petition_12312003_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_decision%20on%20petition_12312003_text.pdf",
      "bytes": 283460,
      "category": "agency_document"
    },
    {
      "name": "220021004_Final Order_04292003.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_Final%20Order_04292003.pdf",
      "bytes": 417978,
      "category": "agency_document"
    },
    {
      "name": "220021004_final order_04292003_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_final%20order_04292003_text.pdf",
      "bytes": 436232,
      "category": "agency_document"
    },
    {
      "name": "220021004_Petition for Reconsideration_05282003.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220021004/220021004_Petition%20for%20Reconsideration_05282003.pdf",
      "bytes": 254581,
      "category": "party_submission"
    },
    {
      "name": "CPF_NO_2-2002-1004.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220021004/CPF_NO_2-2002-1004.pdf",
      "bytes": 33428,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "OZARK GAS TRANSMISSION, L.L.C"
}
```