# TE PRODUCTS PIPELINE COMPANY, LLC — Notice of Probable Violation

**Citation:** CPF 220055013  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2005-09-15

CLOSED notice of probable violation citing 195.402(c)(4), 195.403(b)(2), 195.403(c), 195.410(a), 195.412(a).

## Document text

Notice of Probable Violation involving TE PRODUCTS PIPELINE COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 195,  195.402(c)(4),  195.403(b)(2),  195.403(c),  195.410(a),  195.412(a). The case was opened on 2005-09-15 and is reported as closed as of 2006-04-28. Proposed civil penalty: $35,000. Assessed civil penalty: $35,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220055013_Final Order_04132006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220055013/220055013_Final%20Order_04132006.pdf

220055013_Final Order_04132006.pdf

U.S. Department 400 Seventh Street, S.W.
of Transportation Washington, D.C. 20590
Pipeline and
Hazardous Materials Safety
Administration
APR 1 3 2006
Mr. Leonard W. Mallet
Vice President of Operations
Texas Eastern Pipeline Products Company
2929 Allen Parkway
Houston, TX 77252
RE: CPF NO. 2-2005-501 3
Dear Mr. Mallet:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in the
above-referenced case. It makes findings of violation and assesses a civil penalty of $35,000.
The penalty payment terms are set forth in the Final Order. This enforcement action closes
automatically upon payment. Your receipt of the Final Order constitutes service of that document
under 49 C.F.R. tj 190.5.
Sincerely,
cc: James Reynolds
Pipeline Compliance Registry
Office of Pipeline Safety
James E. Mike, Manager Regulatory Compliance, TEPPCO
Ms. Linda Daugherty, Director, Southern Region, OPS
Enclosure
VIA CERTIFIED MAIL (RETURN RECEIPT REQUESTED) AND TELECOPY



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of )
)
Texas Eastern Pipeline Products Company,
Respondents.
)
)
) CPF No. 2-2005-5013
FINAL ORDER
On November 4-8,2002, September 27-30,2004, and October 4-8,2004, pursuant to 49 U.S.C. tj
601 17, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA)
conducted an inspection of Respondent's facilities and records in Baytown, Texas, and Seymour,
Indiana. As a result of the inspection, the Director, Southern Region, issued to Respondent, by letter
dated September 15,2005, a Notice of Probable Violation and Proposed Civil Penalty (Notice). In
accordance with 49 C.F.R. 5 190.207, the Notice proposed finding that Respondent committed
violations of 49 C.F.R. Part 195 and proposed assessing a civil penalty of $35,000 for the alleged
violations.
In a letter dated October 17, 2005, Respondent submitted a Response to the Notice. Respondent
contested one of the alleged violations, offered an explanation and requested withdrawal or reduction
of the proposed civil penalty. Respondent did not request a hearing and therefore, has waived the
right to one.
FINDINGS OF VIOLATIONS
Uncontested
Respondent did not contest the alleged violations of 49 C.F.R. $9 195.403(c) and 195.410 in the
Notice. Accordingly, I find that Respondent violated 49 C.F.R. Part 195, as more fully described
in the Notice:
49 C.F.R. §195.403(c) -failure to maintain records to demonstrate and verify the
supervisors' knowledge of emergency response procedures, in accordance with
tj 195.402.



49 C.F.R. $ 195.4 10 -failure to place and maintain pipeline markers over each buried
pipeline. Respondent's P-74 line east of mile post 38 1 was improperly marked and
pine trees have been planted on top of where the line locator showed the P-74 line to
be buried. Respondent's P-3 1 line southwest of mile post 106, and its P-2 and P-62
lines north of the Ouachita River were not sufficiently marked to accurately locate
the pipelines in many areas along the right-of-way.
These findings of violation will be considered prior offenses in any subsequent enforcement action
taken against Respondent.
Item 1 in the Notice alleged that Respondent violated 49 C.F.R. $195.402(a) and (c) (4), as
Respondent had not designated which pipeline facilities are located in areas that would require
immediate response by the operator to prevent hazards to the public if the facilities failed or
malfunctioned. This regulation provides safety precautions that minimize the risk of injury to human
life, the environment, and property during an emergency.
Along with its Response, Respondent submitted a section of its Operating and Maintenance (O&M)
manual entitled Procedure E-405-IdentiJjling Locations Requiring Immediate Response. Respondent
advised that its O&M states, "All pipeline systems, regardless of location, are in areas that would
require an immediate response to prevent hazards in the public and the environment if the system
failed or malfunctioned." Respondent further advised that the Emergency Plan section of its O&M
manual states, "It shall be the policy of TEPPCO to treat the failure or malfunction of any of its
facilities as a potential hazard to the public and respond immediately." Respondent contended that
its submission shows its compliance with federal regulations and requested withdrawal of the
proposed civil penalty.
Respondent submitted a portion of its O&M manual and Emergency Plan as evidence that it
designated all of its pipeline systems as requiring an immediate response by TEPPCO to prevent
hazards to the public if the facilities failed or malfunctioned. While Respondent's effort to ensure
pipeline safety is acknowledged, the evidence was submitted after completion of the inspection.
Evidence that relates to activities that occurred after the inspection is not relevant to determining
whether a violation occurred. The documents were not provided during the inspection nor during
the post inspection exit interview. The evidence was submitted after completion of the inspection.
Respondent has not shown any circumstance that would have prevented or justified its failure to
demonstrate compliance during the inspection or during the post inspection. Accordingly, I find that
Respondent violated 49 C.F.R. $195.402(a) and (c) (4), as Respondent failed to designated which
pipeline facilities are located in areas that would require immediate response by the operator to
prevent hazards to the public if the facilities failed or malfunctioned.
Item 2 in the Notice alleged that Respondent violated 49 C.F.R. $ 195.403(a) and (b), as Respondent
did not demonstrate that it conducts a continuous training program to instruct emergency response



personnel. Respondent did not provide records to demonstrate that each employee's performance
in meeting the objectives of the emergency response training was accomplished each calendar year,
at intervals not exceeding 15 months, but at least once each calendar year.
In its Response, Respondent advised that it completed an extensive training program some time ago,
but it has not sufficiently developed a system-wide documentation program to demonstrate its
effectiveness nor the personnel involved in the program. Respondent submitted an excerpt of the
minimum program elements for its field operations personnel. Respondent explained that it is
currently in the process of developing a more comprehensive and precise documentation system to
capture involvement of its personnel in ongoing emergency response training. Respondent also
advised that it recognizes the limitations of its documentation process. Nevertheless, Respondent
contended that it is in compliance with the intent and spirit of the regulation.
Respondent has not sufficiently developed a system-wide documentation program. Respondent is
currently in the process of developing a more comprehensive and precise documentation system.
While Respondent demonstrated that it is working toward compliance, Respondent failed to
demonstrate that it is in compliance. Without this history to demonstrate each employee's
performance in meeting the objectives of the emergency response training, an operator increases the
risk of harm to its personnel and the public. Respondent has not provided any evidence that would
justify elimination of the proposed civil penalty. Accordingly, I find that Respondent violated 49
C.F.R. $195.403(a) and (b), as Respondent failed to demonstrate that it conducts a continuous
training program to instruct emergency response personnel.
Item 5 in the Notice alleged that Respondent violated 49 C.F.R. $ 195.412(a), as Respondent failed
to properly inspect the surface conditions on or adjacent to each pipeline right-of-way. Respondent
patrols its right-of-ways by aircraft but the aerial patrol views are obstructed by significant
overhanging tree canopy in many areas, effectively blocking the view of various right-of-ways.
In its Response, Respondent advised that it is assessing each location specified in the Notice and
working to insure additional canopies are removed. Respondent further advised that each patrol pilot
has been interviewed to insure no addition locations requiring attention have been overlooked.
Respondent contended that certain areas may have had restricted viewing capabilities but there was
sufficient exposure for adequate inspection of the system.
The patrolling of right-of-ways is essential to help identify potential problems which could develop
from third party activities along the pipeline. Patrolling is also crucial for leak detection.
Respondent failed to exercise vigilance commensurate with the danger to protect the public,
environment, and property from injury and destruction. Inspections by Respondent that were
obstructed by significant overhanging tree canopy were inefficient. The failure to properly patrol
and follow-up on activities along the right-of-way could lead to significant harm to the public and
the environment should damage to the pipeline occur or a leak develops. Accordingly, I find that
Respondent violated 49 C.F.R. $195.412, as Respondent failed to properly inspect the surface
conditions on or adjacent to each pipeline right-of-way.



ASSESSMENT OF PENALTY
Under 49 U.S.C. fj 60122, Respondent is subject to a civil penalty not to exceed $100,000 per
violation for each day of the violation up to a maximum of $1,000,000 for any related series of
violations.
49 U.S.C. fj 60122 and 49 C.F.R. 5 190.225 require that, in determining the amount of the civil
penalty, I consider the following criteria: nature, circumstances, and gravity of the violation, degree
of Respondent's culpability, history of Respondent's prior offenses, Respondent's ability to pay the
penalty, good faith by Respondent in attempting to achieve compliance, the effect on Respondent's
ability to continue in business, and such other matters as justice may require. The Notice proposed
a total civil penalty of $ 35,000 for violations of 49 C.F.R. Part 195.
The proposed civil penalty for Item 1 is $5,000 for violation of 49 C.F.R. fj 192.402(a), as
Respondent failed to designate which pipeline facilities are located in areas that would require
immediate response by the operator to prevent hazards to the public if the facilities failed or
malfunctioned. Respondent subsequently submitted sections of its O&M manual to demonstrate
compliance. Respondent contended that its submission shows its compliance with federal
regulations and requested withdrawal of the proposed civil penalty. The documentation submitted
by Respondent was not provided during the inspection nor during the post inspection exit interview.
The evidence was submitted after completion of the inspection. Evidence that relates to activities
that occurred after the inspection is not relevant to determining whether a violation occurred.
Respondent has not shown any circumstance that would have prevented or justified its failure to
demonstrate compliance during the inspection. Accordingly, having reviewed the record and
considered the assessment criteria, I assess Respondent a civil penalty of $5,000 for this violation.
The proposed civil penalty for Item 2 is $5,000, for violation of 49 C.F.R. fj 192.403(a) and (b), as
Respondent failed to demonstrate that it conducts a continuous training program to instruct
emergency response personnel. Although Respondent advised that it is in the process of developing
a more comprehensive and precise documentation system, it failed to provide records to demonstrate
that each employee's performance in meeting the objectives of the emergency response training was
accomplished each calendar year, at intervals not exceeding 15 months. An objective of the
regulation is to assure that operator emergency response personnel are prepared to recognize
conditions that are likely to cause emergencies, know the characteristics and hazards of the product
transported and take steps necessary to control any accidental release of hazardous liquids and
minimize the potential danger to the public and environment if the facilities failed or malfunctioned
in an expeditious and safe manner. When an operator fails to conduct a continuous training program
to instruct emergency response personnel, the proper procedures and techniques to follow may not
be clear to those responsible for responding to an emergency, which increases the risk of harm to its
personnel and the public. Accordingly, having reviewed the record and considered the assessment
criteria, I assess Respondent a civil penalty of $5,000 for this violation.



The proposed civil penalty for Item 3 is $5,000 for violation of 49 C.F.R. §192.403(c), as
Respondent failed to maintain records to demonstrate and verify the supervisors' knowledge of
emergency response procedures, in accordance with $ 195.402. Respondent did not contest the
violation or the civil penalty. The supervisors' knowledge of emergency response procedures is
essential to reduce potential harm to the public and the environment that may result from a pipeline
emergency. Accordingly, havingreviewed the record and considered the assessment criteria, I assess
Respondent a civil penalty of $5,000 for violation for 49 C.F.R. 8 192.403(c).
The proposed civil penalty for Item 4 is $10,000 for violation of 49 C.F.R. §192.410(a), as
Respondent failed to place and maintain pipeline markers over each buried pipeline. Respondent's
P-74 line east of mile post 381 was improperly marked and pine trees have been planted on top of
where the line locator showed the P-74 line to be buried. Respondent's P-31 line southwest of mile
post 106, and its P-2 and P-62 lines north of the Ouachita River were not sufficiently marked to
accurately locate the pipelines in many areas along the right-of-way. Respondent did not contest the
violation or the civil penalty. The rule contemplates the protection of both people and property from
an accidental discharge from the pipeline. Unmarked or inaccurate line markers increase the risk
of harm to the public, environment, and property. Accordingly, having reviewed the record and
considered the assessment criteria, I assess Respondent a civil penalty of $10,000 for this violation.
The proposed civil penalty for Item 5 is $10,000 for violation of 49 C.F.R. 5 192.412(a), as
Respondent failed to properly inspect the surface conditions on or adjacent to each pipeline right-of-
way. Respondent patrols its right-of-ways by aircraft but the aerial patrol views are obstructed by
significant overhanging tree canopy in many areas, effectively blocking the view of various right-of-
ways. Respondent advised that it is assessing each location specified in the Notice. Respondent
requested a reduction in the proposed civil penalty. Respondent argued that certain areas may have
had restricted viewing capabilities but there was sufficient exposure for adequate inspection of the
system. Although Respondent contended in its response that there was sufficient exposure, during
the exit interview, Respondent's personnel stated that they had not flown with the pilot to verify the
contention that there was sufficient exposure for adequate inspection ofthe system. A proper system
of inspection should be maintained to insure reasonable promptness in the detection of all surface
conditions on and adjacent to the pipeline right-of-way for indications of any and all factors affecting
the safety and operations of the pipeline. Inspections by Respondent that were obstructed by
significant overhanging tree canopy were inefficient. Accordingly, having reviewed the record and
considered the assessment criteria, I assess Respondent a civil penalty of $10,000 for violation of
49 C.F.R. §192.412(a).
Accordingly, having reviewed the record and considered the assessment criteria, I assess Respondent
a total civil penalty of $35,000.
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C.F.R. $89.2 1 (b)(3)) require this payment be made by wire transfer, through the Federal Reserve
Communications System (Fedwire), to the account of the U.S. Treasury. Detailed instructions are
contained in the enclosure. Questions concerning wire transfers should be directed to: Financial



Operations Division (AMZ-300), Federal Aviation Administration, Mike Monroney Aeronautical
Center, P.O. Box 25082, Oklahoma City, OK 73125; (405) 954-8893.
Failure to pay the $35,000 civil penalty will result in accrual of interest at the current annual rate in
accordance with 3 1 U.S.C. 5 3717,31 C.F.R. 5 901.9 and 49 C.F.R. 5 89.23. Pursuant to those same
authorities, a late penalty charge of six percent (6%) per annum will be charged if payment is not
made within 1 10 days of service. Furthermore, failure to pay the civil penalty may result in referral
of the matter to the Attorney General for appropriate action in a United States District Court.
Under 49 C.F.R. 5 190.21 5, Respondent has a right to submit a Petition for Reconsideration of this
Final Order. The petition must be received within 20 days of Respondent's receipt of this Final
Order and must contain a brief statement of the issue(s). The filing of the petition automatically
stays the payment of any civil penalty assessed. However if Respondent submits payment for the
civil penalty, the Final Order becomes the final administrative decision and the right to petition for
reconsideration is waived. The terms and conditions of this Final Order are effective on receipt.
Date Issued
fowipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220055013>
- Source ID: `phmsa-enforcement`
- SHA-256: `25106db8eff26b2c60f0146b2497b8c5c4fea62b144591c41525efe91969d331`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:21:01.721Z
- Document slug: `phmsa-enforcement-220055013`

### Source metadata

```json
{
  "cpf": "220055013",
  "operator": "TE PRODUCTS PIPELINE COMPANY, LLC",
  "region": "Southern",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(c)(4)",
    "195.403(b)(2)",
    "195.403(c)",
    "195.410(a)",
    "195.412(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 1,
  "attachments": [
    {
      "name": "220055013_Final Order_04132006.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220055013/220055013_Final%20Order_04132006.pdf",
      "bytes": 337700,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TE PRODUCTS PIPELINE COMPANY, LLC"
}
```