# DIXIE PIPELINE COMPANY LLC — Warning Letter

**Citation:** CPF 220085008W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2008-09-02

CLOSED warning letter citing 195.402(a).

## Document text

Warning Letter involving DIXIE PIPELINE COMPANY LLC. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2008-09-02 and is reported as closed as of 2008-09-02. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220085008W_operator response_10022008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220085008W/220085008W_operator%20response_10022008.pdf

220085008W_warning letter_09022008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220085008W/220085008W_warning%20letter_09022008.pdf

220085008w_warning letter_09022008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220085008W/220085008w_warning%20letter_09022008_text.pdf

220085008w_warning letter_09022008_text.pdf

U. s. Department
of Transportation
Pipeline and
Hazardous Materials Safety
Administration
233 Peachtree Street Ste. 600
Atlanta, GA 30303
WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT RE UESTED
September 2, 2008
Mr, Jim Colliugsworth
President
Dixie Pipeline Company
1100 Louisiana Street
Houston, Texas 77002-5227
CPF 2-2008-5008W
Dear Mr. Collinsworth:
On July 7 to 11, 2008, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected your
hydrostatic test of the Hattiesburg to Demopolis section of Dixie Pipeline Company's 12"
pipeline in Alabama and Mississippi.
As a result of the inspection, it appears that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The item inspected and the
probable violation is:
II195. 402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities and
handling abnormal operations and emergeucies. This manual shall be reviewed at
intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence, and
appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
During the Dixie Pipeline Company (Dixie) Hattiesburg to Demopolis hydrostatic test, Dixie
did not have available backfill procedures during pipe replacement work for hydrostatic test
failures on July 8, 2008.



A copy of the procedure for backfilling the pipeline was requested while observing repair
work on July 8, 2008 and one was not available on the site. On July 9, 2008 Dixie provided
a copy of Enterprise Products Operating L. P. Spec. LP-13, Construction Specifications For
Land Pipeline Construction, Lowering-In d'i Backfilling. The Specification in Sections 2. 3
Supports and 2. 5 Tie-ins require tie-ins to be supported by sandbags or other Company
approved material at spacing intervals of 15 feet or less to provide stress-free support
subsequent to back-filling. The pipeline was not being supported per the specifications.
When Dixie personnel were notified of this the PHMSA representative was advised that the
Specification was a new construction specification and did not apply as this was a
maintenance activity. Dixie subsequently provided a copy of Procedure MPR-4108 General
Line cf Equip. Maint. Backfilling and Cleanup, from the prior Dixie Pipeline Company
Maintenance Manual, as the procedure that was being used for the backfilling. The
procedure used is not referenced in the current Dixie Pipeline Company Procedures Manual
For Pipeline Operations, Maintenance, and Emergencies. The current Dixie Pipeline
Company Procedures Manual For Pipeline Operations, Maintenance, and Emergencies does
not address backfilling in Section 5. 5 Pipeline Repairs and Pipeline Movement nor address
the use of prior Dixie procedures.
Under 49 United States Code, I'1 60122, you are subject to a civil penalty not to exceed $100, 000
for each violation for each day the violation persists up to a maximum of $1, 000, 000 for any
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the item identified in this letter.
Failure to do so will result in Dixie pipeline Company being subject to additional enforcement
action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 2-2008-5008W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U. S. C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U. S, C. 552(b).
Sincerely,
Linda Daugherty
Director, Southern Region
Pipeline and Hazardous Materials Safety Administration

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220085008W>
- Source ID: `phmsa-enforcement`
- SHA-256: `2e29f339de8c82b464bb462fd14aee5b196ecf664dd03ddfafe2c2f5035b2229`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T07:25:53.957Z
- Document slug: `phmsa-enforcement-220085008w`

### Source metadata

```json
{
  "cpf": "220085008W",
  "operator": "DIXIE PIPELINE COMPANY LLC",
  "region": "Southern",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 3,
  "attachments": [
    {
      "name": "220085008W_operator response_10022008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220085008W/220085008W_operator%20response_10022008.pdf",
      "bytes": 161229,
      "category": "party_submission"
    },
    {
      "name": "220085008W_warning letter_09022008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220085008W/220085008W_warning%20letter_09022008.pdf",
      "bytes": 123119,
      "category": "agency_document"
    },
    {
      "name": "220085008w_warning letter_09022008_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220085008W/220085008w_warning%20letter_09022008_text.pdf",
      "bytes": 869984,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "DIXIE PIPELINE COMPANY LLC"
}
```