# FLORIDA GAS TRANSMISSION CO — Warning Letter

**Citation:** CPF 220101008W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2010-08-17

CLOSED warning letter citing 192.905(c), 192.911(k), 192.917(a)(1), 192.933(b), 192.933(d)(1).

## Document text

Warning Letter involving FLORIDA GAS TRANSMISSION CO. PHMSA's enforcement data identifies the cited regulations as 192.905(c),  192.911(k),  192.917(a)(1),  192.933(b),  192.933(d)(1). The case was opened on 2010-08-17 and is reported as closed as of 2010-08-17. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220101008W_warning letter_08172010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220101008W/220101008W_warning%20letter_08172010.pdf

220101008W_warning letter_08172010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220101008W/220101008W_warning%20letter_08172010_text.pdf

220101008W_warning letter_08172010_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
August 17, 2010
Jeryl Mohn
Sr. Vice President, Operations and Engineering
Panhandle Energy
5444 Westheimer Road
Houston, Texas 77056-5306
CPF 2-2010-1008W
Dear Mr. Mohn:
On April 12-16 and April 26-30, 2010, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) inspected Panhandle Energy’s Gas Integrity Management
Program (IMP) in Houston, Texas. On June 16, 2010, a PHMSA representative inspected
pipeline facilities belonging to Panhandle Energy's subsidiary Trunkline Gas Company, LLC
(Trunkline) in Victoria County, Texas. Both inspections were conducted pursuant to Chapter
601 of 49 United States Code.
As a result of the inspections, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violations are:
1. §192.905 How does an operator identify a high consequence area?
(c) Newly identified areas. When an operator has information that the area
around a pipeline segment not previously identified as a high consequence area
(HCA) could satisfy any of the definitions in § 192.903, the operator must complete
the evaluation using method (1) or (2). If the segment is determined to meet the
definition as a high consequence area, it must be incorporated into the operator's
baseline assessment plan as a high consequence area within one year from the date
the area is identified.
Panhandle Energy's subsidiary Trunkline failed to incorporate a new high consequence area
(HCA) into its baseline assessment program within one year from the date the area was
identified. A Best Western hotel was opened in 2006 along Trunkline's Beeville Discharge



Pipeline in Victoria County, Texas. This hotel required Trunkline to evaluate the area using
either method (1) or (2) [see §192.903] to determine if the area met the definition of an HCA.
Trunkline's HCA map (T-0410-Beeville-100 Line-19g-3762, dated 6/15/2010) shows that the
new HCA was added in April 2009; more than two years past the required time limit.
2. §192.917 How does an operator identify potential threats to pipeline integrity and
use the threat identification in its integrity program?
(a)Threat identification. An operator must identify and evaluate all potential
threats to each covered pipeline segment. Potential threats that an operator must
consider include, but are not limited to, the threats listed in ASME/ANSI B31.8S
(incorporated by reference, see §192.7), section 2, which are grouped under the
following four categories:
(1) Time dependent threats such as internal corrosion, external corrosion, and
stress corrosion cracking;
(2) Static or resident threats, such as fabrication or construction defects;
(3) Time independent threats such as third party damage and outside force
damage; and
(4) Human error.
Panhandle Energy’s threat susceptibility algorithms failed to appropriately determine the
susceptibility of its pipeline systems to manufacturing and construction related threats.
Pipeline segments with manufacturing-related defects, weather-related damage and outside
force damage were not assigned threat values in the risk analysis and were shown as no risk to
pipeline integrity. This was confirmed at the time of the inspection by reviewing the Panhandle
Energy Spreadsheet – SUG: Threat Susceptibility for all Active HCAs.
3. §192.933 What actions must be taken to address integrity issues?
(b) Discovery of condition. Discovery of a condition occurs when an operator has
adequate information about a condition to determine that the condition presents a
potential threat to the integrity of the pipeline. A condition that presents a
potential threat includes, but is not limited to, those conditions that require
remediation or monitoring listed under paragraphs (d)(1) through (d)(3) of this
section. An operator must promptly, but no later than 180 days after conducting
an integrity assessment, obtain sufficient information about a condition to make
that determination, unless the operator demonstrates that the 180-day period is
impracticable.
Panhandle Energy's IMP failed to properly define "discovery of a condition" [i.e. when an
operator has obtained adequate information to identify a potential threat to the integrity of the
pipeline] and failed to establish a timeframe and process for the prompt consideration of
potential immediate repair conditions. Instead, Panhandle Energy's IMP defines discovery of a
condition as the acceptance of vendor in-line inspection (ILI) data without consideration of
establishing a timeframe and process for the prompt consideration immediate repair conditions.
4. §192.933 What actions must be taken to address integrity issues?
(d) Special requirements for scheduling remediation.-
2



(1) Immediate repair conditions. An operator's evaluation and remediation
schedule must follow ASME/ANSI B31.8S, section 7 in providing for immediate
repair conditions. To maintain safety, an operator must temporarily reduce
operating pressure in accordance with paragraph (a) of this section or shut down
the pipeline until the operator completes the repair of these conditions. An
operator must treat the following conditions as immediate repair conditions:
(i) A calculation of the remaining strength of the pipe shows a predicted failure
pressure less than or equal to 1.1 times the maximum allowable operating pressure
at the location of the anomaly. Suitable remaining strength calculation methods
include, ASME/ANSI B31G; RSTRENG; or an alternative equivalent method of
remaining strength calculation. These documents are incorporated by reference
and available at the addresses listed in appendix A to part 192.
(ii) A dent that has any indication of metal loss, cracking or a stress riser.
(iii) An indication or anomaly that in the judgment of the person designated by
the operator to evaluate the assessment results requires immediate action.
Panhandle Energy's IMP did not require the examination of immediate repair conditions (in
addition to pressure reductions) within 5 days of discovery as required by ASME B31.8S-2004,
Section 7.2.1 (incorporated by reference). Panhandle Energy's IMP did not include or require a
justification as to why examination cannot be completed within the 5 days nor does it explain
how equivalent safety is assured. Refer to Panhandle Energy's Position Paper E.1.a dated
3/24/2010, Program Requirements for Discovery, Evaluation and Remediation Scheduling.
5. §192.911 What are the elements of an integrity management program?
(k) A management of change process as outlined in ASME/ANSI B31.8S, section
11.
Panhandle Energy’s IMP Management of Change (MOC) process failed to provide for the
review and analysis of the implications of pipeline or system changes to the IMP prior to
implementation. This allowed Panhandle Energy's subsidiary Florida Gas Transmission
Company (FGT) to install Supervisory Control and Data Acquisition (SCDA) system
instrumentation on its pipeline system without an MOC analysis of IMP implications.
Additionally, FGT replaced an 18-inch pipeline and a 24-inch pipeline in Valve Section 21-7
with a 36-inch diameter pipeline without an MOC review and analysis to determine the
implications on the integrity of the pipeline systems, if any.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed
$100,000 for each violation for each day the violation persists up to a maximum of $1,000,000
for any related series of violations. We have reviewed the circumstances and supporting
documents involved in this case, and have decided not to conduct additional enforcement action
or penalty assessment proceedings at this time. We advise you to correct the item identified in
this letter. Failure to do so will result in Panhandle Energy and Trunkline Gas Company being
subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 2-2010-1008W. Be advised that all material you submit in response to this enforcement3



action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
4

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220101008W>
- Source ID: `phmsa-enforcement`
- SHA-256: `8ee39ff058e49631370bde3c1b076a6f374084e966e079080d32b63a51d1b226`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T17:54:01.512Z
- Document slug: `phmsa-enforcement-220101008w`

### Source metadata

```json
{
  "cpf": "220101008W",
  "operator": "FLORIDA GAS TRANSMISSION CO",
  "region": "Southern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.905(c)",
    "192.911(k)",
    "192.917(a)(1)",
    "192.933(b)",
    "192.933(d)(1)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "220101008W_warning letter_08172010.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220101008W/220101008W_warning%20letter_08172010.pdf",
      "bytes": 223231,
      "category": "agency_document"
    },
    {
      "name": "220101008W_warning letter_08172010_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220101008W/220101008W_warning%20letter_08172010_text.pdf",
      "bytes": 24234,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "FLORIDA GAS TRANSMISSION CO"
}
```