# TENNESSEE GAS PIPELINE COMPANY — Notice of Probable Violation

**Citation:** CPF 220111005  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2011-03-31

CLOSED notice of probable violation citing 192.605(a).

## Document text

Notice of Probable Violation involving TENNESSEE GAS PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 192.605(a). The case was opened on 2011-03-31 and is reported as closed as of 2011-06-24. Proposed civil penalty: $25,000. Assessed civil penalty: $25,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220111005_Final Order_06242011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_Final%20Order_06242011.pdf

220111005_Final Order_06242011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_Final%20Order_06242011_text.pdf

220111005_NOPV_PCP_03312011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_NOPV_PCP_03312011.pdf

220111005_NOPV_PCP_03312011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_NOPV_PCP_03312011_text.pdf

220111005_Operator response_04212011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_Operator%20response_04212011.pdf

220111005_Final Order_06242011_text.pdf

JUN 24 2011
Mr. William G. Cope
Vice President, Eastern Operations
Tennessee Gas Pipeline
569 Brookwood Village, Suite 501
Birmingham, Alabama 35209
Re: CPF No. 2-2011-1005
Dear Mr. Cope:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and assesses a civil penalty of $25,000. This is to acknowledge receipt of payment of
the full penalty amount, by wire transfer, dated April 21, 2011. This enforcement action is now
closed. Service of the Final Order by certified mail is deemed effective upon the date of mailing,
or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, Pipeline Safety
Mr. Wayne T. Lemoi, Director, Southern Region, PHMSA
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [7005 1160 0001 0075 9541]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Tennessee Gas Pipeline, ) CPF No. 2-2011-1005
El Paso Corporation )
)
Respondent. )
____________________________________)
FINAL ORDER
On October 4 through December 10, 2010, pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted on-site safety inspections of the natural gas transmission pipeline facilities and
records of Tennessee Gas Pipeline (TGP or Respondent) in Alabama, Mississippi, Tennessee,
and Kentucky. TGP is an interstate natural gas transmission system that runs from Louisiana,
the Gulf of Mexico and south Texas to the northeastern corridor, including New York City and
Boston. TGP is one of several wholly owned transmission systems owned by El Paso
Corporation and consists of 14,100 miles of pipeline.
As a result of the inspections, the Director, Southern Region, OPS (Director), issued to
Respondent, by letter dated March 31, 2011, a Notice of Probable Violation and Proposed Civil
Penalty (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that TGP
violated 49 C.F.R. § 192.605(a) and proposed assessing a civil penalty of $25,000 for the alleged
violation.
TGP responded to the Notice by letter dated April 21, 2011 (Response). The company did not
contest the allegation of violation and paid the proposed civil penalty of $25,000, as provided in
49 C.F.R. § 190.227. Payment of the penalty serves to close the case with prejudice to
Respondent.
FINDING OF VIOLATION
In its Response, TGP did not contest the allegation in the Notice that it violated 49 C.F.R. Part
192, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.605(a), which states:



2
§ 192.605 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each
pipeline, a manual of written procedures for conducting operations
and maintenance activities and for emergency response. For
transmission lines, the manual must also include procedures for
handling abnormal operations. This manual must be reviewed and
updated by the operator at intervals not exceeding 15 months, but
at least once each calendar year. This manual must be prepared
before operations of a pipeline system commence. Appropriate
parts of the manual must be kept at locations where operations and
maintenance activities are conducted.
The Notice alleged that Respondent violated 49 C.F.R. § 192.605(a) by failing to follow its
written procedures for conducting operations and maintenance activities and emergency
response. Specifically, the Notice alleged that TGP did not use a locking device, disable, or
properly secure a main line block valve, in violation of its operations and maintenance
procedures, as outlined in Section 305 Valve Maintenance.
1 During a field inspection of TGP
Main Line Valve (MLV) 535-2, located in Jasper County, Mississippi, PHMSA’s inspector
was neither secured nor disabled, in violation of Respondent’s Operating and Maintenance
Procedures. Given that the valve hand-wheel operates the valve, failure to properly secure the
hand-wheel compromised the integrity of the pipeline. Pipeline damage or product release could
have ensued.
observed the main line block valve hand-wheel resting against the valve body.2 The hand-wheel
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 192.605(a) by failing to follow its
manual of written procedures for conducting operations and maintenance activities and for
emergency response, which requires that main line valves be secured or disabled in order to
prevent unauthorized operation.
In summary, having reviewed the record and considered the assessment criteria, I assess
Respondent a total civil penalty of $25,000, which has already been paid by Respondent.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety
1 TGP O&M Manual (Valve Maintenance), Section 305.1 states “Transmission valves that might be required in an
emergency . . . may include: (a) Mainline block valves and blowoffs . . . whenever a valve is operated . . . the
locking device shall [also] be returned to the valve and secured. Section 305.4(e) Security states “valves covered in
this section of the O&M Manual shall: have a locking device to prevent unauthorized operation or be disabled (i.e.
have the valves in a condition that would provide security equivalent to, or better than, a lock on the valve or valve
operator), or be within a secured area.”
2 See Exhibit A, Pipeline Safety Violation Report (Mar. 30, 2011) (Violation Report), at 8.

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220111005>
- Source ID: `phmsa-enforcement`
- SHA-256: `8639aa820f9bb16670744a0f573240415e68a6764943126bd06be413626a898c`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T22:30:00.099Z
- Document slug: `phmsa-enforcement-220111005`

### Source metadata

```json
{
  "cpf": "220111005",
  "operator": "TENNESSEE GAS PIPELINE COMPANY",
  "region": "Southern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.605(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "220111005_Final Order_06242011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_Final%20Order_06242011.pdf",
      "bytes": 164795,
      "category": "agency_document"
    },
    {
      "name": "220111005_Final Order_06242011_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_Final%20Order_06242011_text.pdf",
      "bytes": 20264,
      "category": "agency_document"
    },
    {
      "name": "220111005_NOPV_PCP_03312011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_NOPV_PCP_03312011.pdf",
      "bytes": 119200,
      "category": "case_document"
    },
    {
      "name": "220111005_NOPV_PCP_03312011_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_NOPV_PCP_03312011_text.pdf",
      "bytes": 17726,
      "category": "case_document"
    },
    {
      "name": "220111005_Operator response_04212011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220111005/220111005_Operator%20response_04212011.pdf",
      "bytes": 104049,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TENNESSEE GAS PIPELINE COMPANY"
}
```