# MARATHON PIPE LINE LLC — Notice of Probable Violation

**Citation:** CPF 220145002  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2014-04-16

CLOSED notice of probable violation citing 195.401, 195.402, 195.406.

## Document text

Notice of Probable Violation involving MARATHON PIPE LINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.401,  195.402,  195.406. The case was opened on 2014-04-16 and is reported as closed as of 2014-09-08. Proposed civil penalty: $30,200. Assessed civil penalty: $30,200. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220145002_Final Order_09082014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_Final%20Order_09082014.pdf

220145002_Final Order_09082014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_Final%20Order_09082014_text.pdf

220145002_NOPV PCP_04162014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_NOPV%20PCP_04162014.pdf

220145002_NOPV PCP_04162014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_NOPV%20PCP_04162014_text.pdf

220145002_Operator Response to Notice_05192014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_Operator%20Response%20to%20Notice_05192014.pdf

220145002_Final Order_09082014_text.pdf

SEPTEMBER 8, 2014
Mr. Craig O. Pierson
President
Marathon Pipe Line, LLC
539 South Main Street
Findlay, OH 45840
Re: CPF No. 2-2014-5002
Dear Mr. Pierson:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and assesses a civil penalty of $30,200. This is to acknowledge receipt of payment of
the full penalty amount, by wire transfer, dated May 21, 2014. This enforcement action is now
closed. Service of the Final Order by certified mail is deemed effective upon the date of mailing,
or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Wayne T. Lemoi, Director, Southern Region, Office of Pipeline Safety
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Marathon Pipe Line, LLC, ) CPF No. 2-2014-5002
)
Respondent. )
____________________________________)
FINAL ORDER
During June 11 – November 30, 2012 and February 27, 2014, pursuant to 49 U.S.C. § 60117,
representatives of the Pipeline and Hazardous Materials Safety Administration (PHMSA),
Southern and Central Regions, Office of Pipeline Safety (OPS), inspected the procedures and
records of Marathon Pipe Line, LLC (Marathon) in Findley, Ohio. Marathon operates
underground pipelines and some aboveground storage tanks in the United States. The company's
pipelines transport crude oil; petroleum products, such as gasoline, diesel fuel, heating oil, and
jet fuel; and natural gas to and from terminals, refineries and other pipelines. Marathon operates
in Wyoming, Kentucky, Mississippi, Indiana, Louisiana, Michigan, Texas, West Virginia, and
Ohio. The company is headquartered in Findlay, Ohio, and operates as a subsidiary of MPLX
Pipe Line Holdings, LP.1
As a result of the inspection, the Director, Southern Region, OPS (Director), issued to
Respondent, by letter dated April 16, 2014, a Notice of Probable Violation and Proposed Civil
Penalty (Notice), which also included warning items pursuant to 49 C.F.R. § 190.205. In
accordance with 49 C.F.R. § 190.207, the Notice proposed finding that Marathon had violated
49 C.F.R. § 195.401, and proposed assessing a civil penalty of $30,200 for the alleged violation.
The warning items required no further action, but warned the operator to correct the probable
violations.
Marathon responded to the Notice by letter dated May 19, 2014 (Response). The company did
not contest the allegations of violation and paid the proposed civil penalty of $30,200, as
provided in 49 C.F.R. § 190.227. Payment of the penalty will serve to close the case with
prejudice to Respondent.
1 Source: http://www.marathonpipeline.com/. (Last accessed August 18, 2014).



2
FINDING OF VIOLATION
In its Response, Marathon did not contest the allegation in the Notice that it violated 49 C.F.R.
Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.401, which states in
relevant part:
§ 195.401 General requirements.
(a)…
(b) An operator must make repairs on its pipeline system according to
the following requirements:
(1) Non Integrity management repairs. Whenever an operator
discovers any condition that could adversely affect the safe operation of
its pipeline system, it must correct the condition within a reasonable time.
However, if the condition is of such a nature that it presents an immediate
hazard to persons or property, the operator may not operate the affected
part of the system until it has corrected the unsafe condition.
The Notice alleged that Respondent violated 49 C.F.R. § 195.401 by failing to make non-
integrity repairs on an aboveground breakout tank within a reasonable time after discovering a
condition that could adversely affect the safe operation of its pipeline system. Specifically, the
Notice alleged that on June 8, 2007, Marathon completed an American Petroleum Institute
Standard 653 (API 653) internal inspection of its aboveground breakout tank #1220 in Lima,
Ohio. The tank inspection was documented in Marathon’s Tank 1220 Evaluation Report dated
July 26, 2007. The report identified areas of settlement exceeding 100 percent of the API 653
allowable values and recommended replacing the tank’s bottom plates or performing an
additional Finite Element Analysis (FEA). API 653 Section 6.9.3.2 also requires an operator to
review its inspection findings and recommendations, and to establish a repair scope with
appropriate timing for repair, monitoring and/or maintenance activities.
PHMSA inspectors discovered that Marathon had not taken action to address the settlement
during their 2012 inspections. Marathon eventually chose to complete an FEA, but the FEA (and
associated monitoring plan) on Tank 1220 were not completed until July/August 2012; more
than 5 years after Marathon discovered the condition. Respondent did not contest this allegation
of violation. Accordingly, based upon a review of all of the evidence, I find that Respondent
violated 49 C.F.R. § 195.401 by failing to make non-integrity repairs on an aboveground
breakout tank within a reasonable time after discovering a condition that could adversely affect
the safe operation of its pipeline system.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.



3
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.2 In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; and any effect
that the penalty may have on its ability to continue doing business; and the good faith of
Respondent in attempting to comply with the pipeline safety regulations. In addition, I may
consider the economic benefit gained from the violation without any reduction because of
subsequent damages, and such other matters as justice may require. The Notice proposed a total
civil penalty of $30,200 for the violation cited above.
Item 1: The Notice proposed a civil penalty of $30,200 for Respondent’s violation of 49 C.F.R.
§ 195.401, for failing to make non-integrity repairs on an aboveground breakout tank within a
reasonable time after discovering a condition that could adversely affect the safe operation of its
pipeline system. Marathon did not contest the allegation nor present any evidence or argument
justifying elimination of the proposed penalty. Accordingly, having reviewed the record and
considered the assessment criteria, I assess Respondent a civil penalty of $30,200 for violation of
49 C.F.R. § 195.401.
In summary, having reviewed the record and considered the assessment criteria for each of the
Items cited above, I assess Respondent a total civil penalty of $30,200, which has been paid in
full.
WARNING ITEMS
With respect to Items 2 and 3, the Notice alleged probable violations of Part 195 but did not
propose a civil penalty or compliance order for these items. Therefore, these are considered to
be warning items. The warnings were for:
49 C.F.R. § 195.402 (Item 2) ─ Respondent’s alleged failure to follow its
procedures for energy isolation when performing maintenance at Effingham
Station on August 23, 2012; and
49 C.F.R. § 195.406 (Item 3) ─ Respondent’s alleged 110 percent exceedance of
the maximum operating pressure (MOP) of its Patoka-Martinsville 20-inch crude
oil pipeline at Effingham Station on August 23, 2012.
2 The Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011, Pub. L. No. 112-90, § 2(a)(1), 125 Stat.
1904, January 3, 2012, increased the civil penalty liability for violating a pipeline safety standard to $200,000 per
violation for each day of the violation, up to a maximum of $2,000,000 for any related series of violations.



4
Marathon presented information in its Response showing that it had taken certain actions to
address the cited items. If OPS finds a violation of any of these items in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this Final Order [CPF No. 2-2014-5002] are effective upon service
in accordance with 49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220145002>
- Source ID: `phmsa-enforcement`
- SHA-256: `536f23125f5a8124ebdf2d91cb067bbdae755d253703c26352fd6aba49bf7b4a`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T04:16:31.449Z
- Document slug: `phmsa-enforcement-220145002`

### Source metadata

```json
{
  "cpf": "220145002",
  "operator": "MARATHON PIPE LINE LLC",
  "region": "Southern",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.401",
    "195.402",
    "195.406"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "220145002_Final Order_09082014.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_Final%20Order_09082014.pdf",
      "bytes": 222925,
      "category": "agency_document"
    },
    {
      "name": "220145002_Final Order_09082014_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_Final%20Order_09082014_text.pdf",
      "bytes": 37365,
      "category": "agency_document"
    },
    {
      "name": "220145002_NOPV PCP_04162014.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_NOPV%20PCP_04162014.pdf",
      "bytes": 2646035,
      "category": "case_document"
    },
    {
      "name": "220145002_NOPV PCP_04162014_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_NOPV%20PCP_04162014_text.pdf",
      "bytes": 20163,
      "category": "case_document"
    },
    {
      "name": "220145002_Operator Response to Notice_05192014.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220145002/220145002_Operator%20Response%20to%20Notice_05192014.pdf",
      "bytes": 170641,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "MARATHON PIPE LINE LLC"
}
```