# TEXAS GAS TRANSMISSION, LLC — Notice of Probable Violation

**Citation:** CPF 220151002  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2015-04-24

CLOSED notice of probable violation citing 192.167(a)(2), 192.199(e).

## Document text

Notice of Probable Violation involving TEXAS GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulations as 192.167(a)(2),  192.199(e). The case was opened on 2015-04-24 and is reported as closed as of 2015-05-27. Proposed civil penalty: $72,300. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220151002_NOPV PCP PCO_04242015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_NOPV%20PCP%20PCO_04242015.pdf

220151002_NOPV PCP PCO_04242015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_NOPV%20PCP%20PCO_04242015_text.pdf

220151002_Operator Response to Notice_05222015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_Operator%20Response%20to%20Notice_05222015.pdf

220151002_Region Withdrawal of Notice_05272015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_Region%20Withdrawal%20of%20Notice_05272015.pdf

220151002_Region Withdrawal of Notice_05272015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_Region%20Withdrawal%20of%20Notice_05272015_text.pdf

220151002_Region Withdrawal of Notice_05272015_text.pdf

WITHDRAWAL of NOTICE LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
May 27, 2015
Mr. Richard Keyser
Sr. Vice President Operations
Texas Gas Transmission, LLC
9 Greenway Plaza, Suite 2800
Houston, TX 77046
CPF 2-2015-1002
Dear Mr. Keyser:
On April 24, 2015, the Pipeline and Hazardous Materials Safety Administration (PHMSA),
Southern Region, Office of Pipeline Safety (OPS) issued Texas Gas Transmission, LLC
(TGT) a Notice of Probable Violation (NOPV) for probable violations of the federal pipeline
safety regulations in 49 CFR Part 192.
The NOPV pertained to TGT’s Fayetteville Lateral in Mississippi and Arkansas. It cited TGT
under §192.167 for failing to properly configure the blowdown piping for the emergency
shutdown system (ESD) at its Bald Knob compressor station and §192.199 for failing to
properly configure blowdown discharge stacks for its meter stations along the pipeline.
On May 22, 2015, TGT responded to the NOPV in writing. With regards to the probable
violation of §192.167, TGT explained that during the inspection its personnel did not properly
explain to the OPS inspector that the blowdown piping stacks cited were to vent air, not gas,
during an ESD activation. While TGT did not contest the probable violation of §192.199, the
Southern Region reviewed the issue and determined that the regulation cited did not pertain
the blowdown discharge stack at the tap valve cited in the probable violation.
Accordingly, the PHMSA Southern Region withdraws the NOPV and this case is now closed.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region

220151002_NOPV PCP PCO_04242015_text.pdf

NOTICE OF PROBABLE VIOLATION
PROPOSED CIVIL PENALTY
and
PROPOSED COMPLIANCE ORDER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 24, 2015
Mr. Richard Keyser
Sr. Vice President Operations
Texas Gas Transmission, LLC
9 Greenway Plaza, Suite 2800
Houston, TX 77046
CPF 2-2015-1002
Dear Mr. Keyser:
On March 9-12, 2015, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety (OPS), Southern Region inspected the
Texas Gas Transmission, LLC (TGT) Fayetteville Lateral in Mississippi and Arkansas,
pursuant to Chapter 601 of 49 United States Code.
As a result of the inspection, it appears that TGT has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violations are as follows:
1. §192.167 Compressor stations: Emergency shutdown.
(a) Except for unattended field compressor stations of 1,000 horsepower (746
kilowatts) or less, each compressor station must have an emergency shutdown system
that meets the following:
. . . (2) It must discharge gas from the blowdown piping at a location where the gas
will not create a hazard.1
1 Note that §192.167 was last amended on July 13, 1998



2. TGT did not configure the emergency shutdown system (ESD) at its Bald Knob
compressor station so as to discharge gas from the blowdown piping at a location where
the gas will not create a hazard.
During the PHMSA inspection, the inspector observed and took pictures of ESD trip
station vents near the compressor building and other locations at the compressor station.
The vents were oriented vertically and would discharge natural gas at an elevation of
approximately 3 to 5 feet above the ground in the event of an ESD activation. The
discharge of natural gas at these locations in this configuration could create a hazard to
individuals.
§192.199 Requirements for design of pressure relief and limiting devices. Except for
rupture discs, each pressure relief or pressure limiting device must:
… (e) Have discharge stacks, vents, or outlet ports designed to prevent accumulation
of water, ice, or snow, located where gas can be discharged into the atmosphere
without undue hazard;2
TGT’s blowdown discharge stacks for its meter stations were not located so as to
discharge gas into the atmosphere without undue hazard.
During the PHMSA inspection, the inspector observed and took pictures of blowdown
discharge stacks at the Midge #2 and Southeast Rainbow #1 meter stations. The
blowdown discharge stacks at the tap valve were oriented vertically to discharge gas at an
elevation of approximately 3 to 5 feet above the ground. Vented natural gas could create
an undue hazard to individuals near the discharge stack in the event the discharge stacks
were activated.
Proposed Civil Penalty
Under 49 United States Code, § 60122, TGT is subject to a civil penalty not to exceed
$200,000 per violation per day the violation persists up to a maximum of $2,000,000 for a
related series of violations. For violations occurring prior to January 4, 2012, the maximum
penalty may not exceed $100,000 per violation per day, with a maximum penalty not to
exceed $1,000,000 for a related series of violations. The Compliance Officer has reviewed
the circumstances and supporting documentation involved in the above probable violations
and has recommended that TGT be preliminarily assessed a civil penalty of $72,300 as
follows:
Item number Penalty
1 $ 36,000
2 $ 36,300
2 Note that §192.199 was last amended on November 17, 1970
2



Proposed Compliance Order
With respect to items 1 and 2, pursuant to 49 United States Code § 60118, the Pipeline and
Hazardous Materials Safety Administration proposes to issue a Compliance Order to Texas
Gas Transmission, LLC. Please refer to the Proposed Compliance Order, which is enclosed
and made a part of this Notice.
Response to this Notice
Enclosed as part of this Notice is a document entitled Response Options for Pipeline
Operators in Compliance Proceedings. Please refer to this document and note the response
options. Be advised that all material you submit in response to this enforcement action is
subject to being made publicly available. If you believe that any portion of your responsive
material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete
original document you must provide a second copy of the document with the portions you
believe qualify for confidential treatment redacted and an explanation of why you believe the
redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not
respond within 30 days of receipt of this Notice, this constitutes a waiver of your right to
contest the allegations in this Notice and authorizes the Associate Administrator for Pipeline
Safety to find facts as alleged in this Notice without further notice to you and to issue a Final
Order.
In your correspondence on this matter, please refer to CPF 2-2015-1002 and for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Wayne T. Lemoi
Director, Office of Pipeline Safety
PHMSA Southern Region
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Compliance Proceedings
3



PROPOSED COMPLIANCE ORDER
Pursuant to 49 United States Code § 60118, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to Texas Gas Transmission, LLC (TGT) a
Compliance Order incorporating the following remedial requirements to ensure the
compliance of TGT with the pipeline safety regulations:
1. 2. In regard to Item Number 1 of the Notice pertaining to the improperly configured
emergency shutdown system (ESD) blowdown piping vents at the Bald Knob compressor
station, TGT must complete the following:
a. No later than 30 days after issuance of the Compliance Order,
i. Conduct a survey of all compressor stations on the Fayetteville Lateral and
Greenville Lateral pipelines to identify all improperly configured ESD blowdown
piping vents where the discharge of gas from the vents could create a hazard.
ii. Provide written documentation to the Director, Office of Pipeline Safety, PHMSA
Southern confirming that all the compressor stations on the Fayetteville Lateral
and Greenville Lateral pipelines were surveyed and that all improperly configured
ESD blowdown piping vents were identified.
b. No later than 45 days after issuance of the Compliance Order, provide to the Director,
Office of Pipeline Safety, PHMSA Southern Region a written schedule for modifying
all the improperly configured ESD blowdown piping vents at all the compressor
stations on the Fayetteville Lateral and Greenville Lateral pipelines.
c. No later than 60 days after issuance of the Compliance Order,
i. Modify all the improperly configured ESD blowdown piping vents at all the
compressor stations on the Fayetteville Lateral and Greenville Lateral pipelines so
that any discharged gas will not create a hazard if an ESD is activated.
ii. Provide documentation to the Director, Office of Pipeline Safety, PHMSA
Southern Region demonstrating that TGT has completed the modifications
required by Item 1.c.i.
In regard to Item 2 of the Notice pertaining to the improperly configured blowdown stacks
on the Fayetteville Lateral line, TGT must complete the following:
a. No later than 30 days after issuance of the Compliance Order,
i. Conduct a survey of its pipeline facilities along the Fayetteville Lateral and
Greenville Lateral pipelines to identify all improperly configured discharge stacks,
vents, or outlet ports where vented natural gas could create an undue hazard in the
event the discharge stacks, vents, or outlet ports were activated.
ii. Provide written documentation to the Director, Office of Pipeline Safety, PHMSA
Southern confirming that all pipeline facilities were surveyed and that all
discharge stacks, vents, or outlet ports were identified.
b. No later than 45 days after issuance of the Compliance Order provide to the Director,
Office of Pipeline Safety, PHMSA Southern Region a written schedule for modifying4



3. c. all improperly configured discharge stacks, vents, or outlet ports on the Fayetteville
Lateral and Greenville Lateral pipelines.
No later than 60 days after issuance of the Compliance Order,
i. Modify all improperly configured discharge stacks, vents, or outlet ports on the
Fayetteville Lateral and Greenville Lateral pipelines so that any discharged gas
will not create a hazard if any gas is discharged.
ii. Provide documentation to the Director, Office of Pipeline Safety, PHMSA
Southern Region demonstrating that TGT has completed the modifications
required by Item 2.c.i.
It is requested (not mandated) that TGT maintain documentation of the safety
improvement costs associated with fulfilling this Compliance Order and submit the total
to Wayne T. Lemoi, Director, Southern Region – Office of Pipeline Safety, Pipeline and
Hazardous Materials Safety Administration. It is requested that these costs be reported in
two categories: 1) total cost associated with preparation/revision of plans, procedures,
studies and analyses, and 2) total cost associated with replacements, additions and other
changes to pipeline infrastructure.
5

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220151002>
- Source ID: `phmsa-enforcement`
- SHA-256: `bc100b6a24278fdc0870bde9c81631ed9c1142f277dad9044e4e96d4a12c29f0`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T19:23:21.222Z
- Document slug: `phmsa-enforcement-220151002`

### Source metadata

```json
{
  "cpf": "220151002",
  "operator": "TEXAS GAS TRANSMISSION, LLC",
  "region": "Southern",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.167(a)(2)",
    "192.199(e)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "220151002_NOPV PCP PCO_04242015.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_NOPV%20PCP%20PCO_04242015.pdf",
      "bytes": 455762,
      "category": "agency_document"
    },
    {
      "name": "220151002_NOPV PCP PCO_04242015_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_NOPV%20PCP%20PCO_04242015_text.pdf",
      "bytes": 21924,
      "category": "agency_document"
    },
    {
      "name": "220151002_Operator Response to Notice_05222015.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_Operator%20Response%20to%20Notice_05222015.pdf",
      "bytes": 99783,
      "category": "party_submission"
    },
    {
      "name": "220151002_Region Withdrawal of Notice_05272015.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_Region%20Withdrawal%20of%20Notice_05272015.pdf",
      "bytes": 94719,
      "category": "agency_document"
    },
    {
      "name": "220151002_Region Withdrawal of Notice_05272015_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220151002/220151002_Region%20Withdrawal%20of%20Notice_05272015_text.pdf",
      "bytes": 4984,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TEXAS GAS TRANSMISSION, LLC"
}
```
