# COLONIAL PIPELINE CO — Notice of Probable Violation

**Citation:** CPF 220185003  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2018-08-28

CLOSED notice of probable violation citing 195.505(b), 195.505(d).

## Document text

Notice of Probable Violation involving COLONIAL PIPELINE CO. PHMSA's enforcement data identifies the cited regulations as 195.505(b),  195.505(d). The case was opened on 2018-08-28 and is reported as closed as of 2026-03-13. Proposed civil penalty: $67,000. Assessed civil penalty: $61,100. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220185003_Closure Letter_03132026_(16-154847S).pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Closure%20Letter_03132026_(16-154847S).pdf

220185003_Closure Letter_03132026_(16-154847S)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Closure%20Letter_03132026_(16-154847S)_text.pdf

220185003_Final Order_07132020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Final%20Order_07132020.pdf

220185003_Final Order_07132020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Final%20Order_07132020_text.pdf

220185003_NOPV PCP PCO_08282018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_NOPV%20PCP%20PCO_08282018.pdf

220185003_NOPV PCP PCO_08282018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_NOPV%20PCP%20PCO_08282018_text.pdf

220185003_Operator Response to Notice and Request for Hearing_09282018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing_09282018.pdf

220185003_Operator Withdrawal of Hearing Request_10292019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Operator%20Withdrawal%20of%20Hearing%20Request_10292019.pdf

220185003_PHC Hearing Scheduled_09272019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_PHC%20Hearing%20Scheduled_09272019.pdf

220185003_PHC Hearing Scheduled_09272019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_PHC%20Hearing%20Scheduled_09272019_text.pdf

220185003_PHC Hearing Scheduled_09272019_text.pdf

September 27, 2019
VIA CERTIFIED MAIL AND EMAIL TO: Catherine.Little@troutman.com and
James.Urisko@dot.gov
Ms. Catherine Little
Counsel for Colonial Pipeline Company
Troutman Sanders
600 Peachtree Street, NE, Suite 3000
Atlanta, Georgia 30308
Mr. James Urisko
Director, Southern Region, PHMSA
Pipeline and Hazardous Materials Safety Administration
233 Peachtree Street, Suite 600
Atlanta, Georgia 30303
Re: Notice of Hearing, Colonial Pipeline Company
CPF No. 2-2018-5003
Dear Ms. Little and Mr. Urisko:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of Probable
Violation, Proposed Civil Penalty, and Proposed Compliance Order issued by the Office of Pipeline Safety
in the above-referenced case. The hearing has been scheduled to take place on November 1, 2019, beginning
at 9:00 a.m. Eastern Time.
The hearing will be at the PHMSA Southern Region office, 233 Peachtree Street, Suite 600, Atlanta, GA
30303. Upon arrival at the building, attendees will be required to present photo identification to security
personnel. A contact phone number for the day of the hearing is (404) 832-1140.
Both parties must submit and exchange any additional written materials they intend to present at least 10
calendar days prior to the hearing (October 22, 2019), along with a list of attendees, and the names of any
witnesses who may testify. You may provide this information electronically. If you have any questions,
please contact me at (202) 366-6139 or at kristin.baldwin@dot.gov.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Kristin Baldwin
Presiding Official
cc (email): Mr. Forrest Pittman, Counsel, Southern Region, OPS

220185003_Final Order_07132020_text.pdf

July 13, 2020
VIA ELECTRONIC MAIL TO: jblount@colpipe.com
Mr. Joseph A. Blount, Jr.
President and Chief Executive Officer
Colonial Pipeline Company
1185 Sanctuary Parkway, Suite 100
Alpharetta, Georgia 30009
Re: CPF No. 2-2018-5003
Dear Mr. Blount:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation, assesses a reduced civil penalty of $61,100, and specifies actions that need to be taken
by Colonial Pipeline Company to comply with the pipeline safety regulations. The penalty
payment terms are set forth in the Final Order. When the civil penalty has been paid and the
terms of the compliance order completed, as determined by the Director, Southern Region, this
enforcement action will be closed. Service of the Final Order by electronic mail is effective
upon the date of transmission as provided under 49 C.F.R. § 190.5
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. James Urisko, Director, Southern Region, Office of Pipeline Safety, PHMSA
Ms. Catherine D. Little, Esq., Troutman Sanders, LLP, catherine.little@troutman.com
Ms. Anne M. Cook, Esq., Troutman Sanders, LLP, annie.cook@troutman.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Colonial Pipeline Company, ) CPF No. 2-2018-5003
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
Beginning November 30, 2016, following receipt of a November 2, 2016 Congressional letter
requesting an investigation of Colonial Pipeline Company’s (Colonial or Respondent)
maintenance and oversight activities and pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an on-site pipeline safety inspection of Colonial’s facilities and records in
Alpharetta, Georgia. Colonial's system extends from Texas to New York and consists of more
than 5,500 miles of hazardous liquid pipeline.1
As a result of the inspection, the Director, Southern Region, OPS (Director), issued to
Respondent, by letter dated August 28, 2018, a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the
Notice proposed finding that Colonial had violated 49 C.F.R. § 195.505(b) and (d) and proposed
assessing a civil penalty of $67,000 for the alleged violations. The Notice also proposed
ordering Respondent to take certain actions to correct the alleged violations.
Colonial responded to the Notice by letter dated September 28, 2018 (Response). Colonial
contested one of the allegations, offered additional information in response to the Notice, sought
mitigation or elimination of the proposed penalty, and requested a hearing. Colonial also
requested a settlement meeting with the Southern Region.
As a result of subsequent discussions with the Region, Respondent withdrew its request for a
hearing by letter dated October 29, 2019, and the Region recommended certain modifications to
the proposed compliance terms.2 I have reviewed the record and hereby issue this Final Order
without further proceedings.
1 Colonial website, About Colonial, available at https://www.colpipe.com/about-us/our-company/system-map (last
accessed June 12, 2020).
2 Respondent’s Withdrawal of Request for Hearing, at 1 (October 29, 2019) (on file with PHMSA).



CPF No. 2-2018-5003
Page 2
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.505(d), which states:
§ 195.505 Qualification program.
Each operator shall have and follow a written qualification program.
The program shall include provisions to:
(a) . . .
(d) Evaluate an individual if the operator has reason to believe that the
individual’s performance of a covered task contributed to an accident as
defined in Part 195;
The Notice alleged that Respondent violated 49 C.F.R. § 195.505(d) by failing to evaluate
certain individuals whose performance of a covered task contributed to several accidents, as
defined in Part 195. Specifically, the Notice alleged that Colonial failed to document, for three
reportable accidents, whether the performance of a covered task was involved, whether
performance of a covered task contributed to the accident, or which Colonial personnel
performed any covered tasks during the activities leading to each accident. The Notice further
alleged that Colonial was unable to confirm that it had completed any documentation indicating
that the individuals’ qualifications were suspended, as required by Appendix D, Disqualification
and Suspension, of the company’s written Operator Qualification (OQ) program; that such
Appendix D information had been forwarded to the company’s OQ Coordinator; or that it had
notified Colonial’s Technical Training Department, as required by Section 12 of the company’s
OQ program. These three incidents were documented on PHMSA Form 7000-1 (PHMSA
Accident Report) and have the following report numbers and submittal dates: (1) No. 20140287-
20157, dated August 11, 2014; (2) No. 2015286-20902, dated August 13, 2015; and (3) No.
20150326-22637,3 dated September 12, 2015.
Respondent did not contest this allegation of violation. Respondent, however, did request a
reduction in the proposed civil penalty based on an additional explanation provided to clarify the
facts at issue. This request for reduction is discussed in greater detail below. Accordingly, based
upon a review of all of the evidence, I find that Respondent violated 49 C.F.R. § 195.505(d) by
failing to evaluate individuals whose performance of a covered task contributed to accidents, as
defined in Part 195.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.505(b), which states:
§ 195.505 Qualification program.
Each operator shall have and follow a written qualification program.
The program shall include provisions to:
(a) . . .
(b) Ensure through evaluation that individuals performing covered tasks
are qualified;
3 The Notice incorrectly lists the last five digits of the report number as 20739.



CPF No. 2-2018-5003
Page 3
The Notice alleged that Respondent violated 49 C.F.R. § 195.505(b) by failing to ensure through
evaluation that individuals performing certain covered tasks were qualified. Specifically, the
Notice alleged that evaluation material from three service providers that Colonial’s OQ program
relied upon failed to evaluate an individual’s knowledge, skill, and ability to perform a given
covered task. The Notice alleged that the evaluation methods used to determine an individual’s
knowledge of the task, as well as performance verifications to evaluate an individual’s skill and
ability to perform the task, for four specific covered tasks were inadequate to constitute a valid
evaluation process. These included Covered Task 7.6, “Apply Coating Using Spray
Application”; Covered Task 7.7, “Perform Coating Inspection”; Covered Task 32.0,
“Observation of Excavation Activities”; and Covered Task 39.0, “Backfilling a Trench
Following Maintenance.”
Respondent did not contest this allegation of violation. Respondent, however, requested a
modification of the proposed compliance order to reflect the efforts Colonial had already taken to
comply with the proposed terms. These modified terms, which Southern Region has
recommended for approval through its Region Recommendation,4 are reflected in the
Compliance Order below. Accordingly, based upon a review of all of the evidence, I find that
Respondent violated 49 C.F.R. § 195.505(b) by failing to ensure through evaluation that
individuals performing covered tasks were qualified.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.5 In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; any effect that
the penalty may have on its ability to continue doing business; and the good faith of Respondent
in attempting to comply with the pipeline safety regulations. In addition, I may consider the
economic benefit gained from the violation without any reduction because of subsequent
damages, and such other matters as justice may require. The Notice proposed a total civil
penalty of $67,000 for the violations cited above.
Item 1: The Notice proposed a civil penalty of $67,000 for Respondent’s violation of 49 C.F.R.
§195.505(d), for failing to evaluate individuals whose performance of a covered task contributed
to three separate accidents, as defined in Part 195. In its Response, Colonial provided an
explanation of the facts at issue, arguing for a reduction in the proposed penalty. First, Colonial
contended that the work being performed at the time of one of the accidents or leading up to the
4 PHMSA Region Recommendation, dated November 16, 2019 (on file with PHMSA), at 2.
5 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223.



CPF No. 2-2018-5003
Page 4
accident did not include the performance of a covered task. Specifically, Colonial claimed that a
covered task was not being performed at the time of or leading up to the accident documented on
PHMSA Accident Report No. 20150326-22637,6 dated September 12, 2015.7 Colonial stated
that the accident was caused by a mini-excavator striking a thread-o-ring fitting that was
connected to one of Colonial’s mainline pipelines at its Kannapolis facility in North Carolina.
Colonial further explained that the excavator was delivering backfill materials to other
individuals who were performing Covered Task No. 39, “Backfilling a Trench Following
Maintenance.” Colonial, therefore, contended that the individual operating the mini-excavator
was not actively engaged in excavating or backfilling activities as described in Covered Task No.
39.
The Notice alleged that all three accidents occurred while performing excavation and backfilling
activities, which require both Covered Task No. 39, as well as Covered Task No. 32,
“Observation of Excavation Activities.” Neither the Notice, the Pipeline Safety Violation
Report, nor the Region Recommendation provided more detailed information on the specific
covered tasks that were allegedly being performed at the time of or leading up to each of the
three accidents. Instead, the Region only offered a general application of two covered tasks to all
three accidents without further explanation. Therefore, based on the clarification of the facts
provided by Colonial, and the lack of evidence in the record refuting these facts, including
PHMSA Accident Report No. 20150326-22637, I find that a reduction in the proposed penalty is
warranted and that the number of instances of violation under “Part E6 – Gravity” of the
Violation Report should be reduced from three to two.8
Next, Colonial contended that it had properly assessed whether the performance of a covered
task could have contributed to the accidents and whether an individual’s OQ should be
suspended or withdrawn for each of the accidents. However, Colonial also conceded that there
was no documentation that such assessments ever occurred. I find that this violation is not
simply a recordkeeping violation, but, instead, an activity violation based on the lack of any
documentation demonstrating that Respondent actually performed the assessments as required by
§ 195.505(d) and Colonial’s own OQ procedures. Moreover, Colonial failed to provide any
justification for its failure to either follow its OQ procedures or comply with a regulation that is
clearly applicable. Therefore, I find no reason to reduce the penalty under the criteria of nature,
culpability, or good faith.
Based upon the foregoing, I assess Respondent a reduced civil penalty of $61,100 for violation
of 49 C.F.R. § 195.505(d).
Payment of the civil penalty must be made within 20 days of service. Federal regulations (49
C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
6 The Response incorrectly lists the last five digits of the report number as 20739.
7 According to Part H – Narrative Description of the Accident on PHMSA Form 7000-1, “[o]n August 13, 2015 at
approximately 11:00am, a contract crew backfilling the L2 Station Discharge Valve struck a ¾ inch valve attached
to the top of Line 2” (on file with PHMSA).
8 Pipeline Safety Violation Report (Violation Report) (August 28, 2018) (on file with PHMSA), at 19.



CPF No. 2-2018-5003
Page 5
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMK-325), Federal Aviation Administration, Mike
Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City, Oklahoma 79169.
The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the $61,100 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
COMPLIANCE ORDER
Under 49 U.S.C. § 60118(a), each person who engages in the transportation of hazardous liquids
or who owns or operates a pipeline facility is required to comply with the applicable safety
standards established under chapter 601. The Notice proposed a compliance order with respect to
Item 2 in the Notice for a violation of 49 C.F.R. § 195.505(d). In its Recommendation, the
Southern Region supported modification of the proposed compliance order in order to more
closely reflect the efforts that Colonial has already taken to comply with the proposed terms.9
Accordingly, Respondent is ordered to take the following actions, pursuant to the authority of
49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, to ensure compliance with the pipeline safety
regulations applicable to its operations:
1. With respect to the violation of § 195.505(d) (Item 2), Respondent must:
a. Perform a gap analysis of Colonial’s procedures versus API RP 1161,
Recommended Practice for Pipeline Operator Qualification, within 15
months of issuance of the Final Order. Colonial must develop protocols
for the gap analysis, and provide a gap analysis report and procedure for
managing, documenting, and addressing communication on identified
gaps.
b. Develop audit protocols and process for OQ Service Provider Programs
relative to API RP 1161 within three months of issuance of the Final
Order.
c. Conduct audits of vendor programs relative to API RP 1161 and provide
the audit reports, both individual ones for each covered task and
consolidated, no later than 60 months after the issuance of the Final Order.
d. Provide quarterly process reports on Colonial’s actions and results until
this case is closed.
9 Withdrawal of Request for Hearing (October 29, 2019), at 1 (on file with PHMSA).



CPF No. 2-2018-5003
Page 6
2. Colonial must submit to Director, Southern Region, Office of Pipeline Safety,
PHMSA, documentation demonstrating compliance with and/or completion of the
corrective actions listed above in Item 1(a) through 1(d).
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
It is requested (not mandated) that Respondent maintain documentation of the safety
improvement costs associated with fulfilling this Compliance Order and submit the total to the
Director. It is requested that these costs be reported in two categories: (1) total cost associated
with preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated
with replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address, no later than 20 days after receipt of service of this
Final Order by Respondent. Any petition submitted must contain a statement of the issue(s) and
meet all other requirements of 49 C.F.R. § 190.243. The filing of a petition automatically stays
the payment of any civil penalty assessed. The other terms of the order, including corrective
action, remain in effect unless the Associate Administrator, upon request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
July 13, 2020
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

220185003_Closure Letter_03132026_(16-154847S)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
230 Peachtree Street N.W.
Suite 2100
Atlanta, GA 30303
VIA ELECTRONIC MAIL TO: MLittle@colpipe.com; QFrazier@colpipe.com
March 13, 2026
Melanie Little
President and Chief Executive Officer
Colonial Pipeline Company
1185 Sanctuary Parkway, Suite 100
Alpharetta, GA 30009
Re: CPF No. 2-2018-5003
Dear Ms. Little:
On July 13, 2020, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Colonial Pipeline Company a Final Order in the above-referenced case. This Order included a
civil penalty and an Order to comply with 49 CFR 195.505(b).
PHMSA has confirmed receipt of payment of the civil penalty as of July 21, 2020. Further,
PHMSA has confirmed satisfactory completion of all required elements of the Compliance
Order. Accordingly, this case is now closed, and no further action is required. Thank you for
your cooperation in this matter.
Sincerely,
James A. Urisko
Director, Southern Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
CC: James Urisko, Director, PHMSA Office of Pipeline Safety, Southern Region
Quintin Frazier, Director, Pipeline Compliance, Colonial Pipeline
QFrazier@colpipe.com

220185003_NOPV PCP PCO_08282018_text.pdf

NOTICE OF PROBABLE VIOLATION
PROPOSED CIVIL PENALTY
and
PROPOSED COMPLIANCE ORDER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
August 28, 2018
Mr. Joseph A. Blount, Jr.
President & Chief Executive Officer
Colonial Pipeline Company
1185 Sanctuary Parkway, Suite 100
Alpharetta, GA 30009-4765
CPF 2-2018-5003
Dear Mr. Blount:
Beginning November 30, 2016, following the November 2, 2016, Congressional letter requesting
investigation in to Colonial Pipeline Company’s maintenance and oversight activities, a
representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office
of Pipeline Safety (OPS), pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected
Colonial Pipeline Company’s (Colonial) Operator Qualification (OQ) Program in
Alpharetta, Georgia.
As a result of the inspection, it is alleged that Colonial has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. §195.505 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a)…
(d) Evaluate an individual if the operator has reason to believe that the individual’s
performance of a covered task contributed to an accident as defined in Part 195…
Colonial failed to comply with the regulation because it did not evaluate individuals whose
performance of a covered task contributed to accidents, as required in Part 195.



Section 12 of Colonial’s Operator Qualification (OQ) Program, titled “Post Accident
Investigations,” contained requirements for post-accident review in the event of a pipeline
accident. Specifically, Section 12 required Colonial to determine if a covered task was being
performed at the time of, or leading up to, the accident, and whether performance of a
covered task contributed to the accident. This review was to be performed in accordance
with Corporate Procedure 16, titled “Incident Analysis and Near Miss Process,” using
Colonial’s Learning from Experience and Analysis Process (LEAP).
Section 12 further required that Colonial determine whether performance of a covered task
may have contributed to the accident and, if so, “all personnel who were performing the
Covered Tasks will have their qualifications immediately suspended until it can be
determined whether his/her action contributed to the accident.” Section 12 further indicates
that such suspensions are to be documented using Appendix D of Colonial’s OQ Program,
titled “Disqualification and Suspension.” Moreover, Section 12 specifies that if an
individual’s qualifications are suspended or revoked, the Appendix D documentation is to be
forwarded to Colonial’s OQ Coordinator, who in turn is to notify the Technical Training
Department designee responsible for updating Covered Task qualification records in
Colonial’s Learning Management System.
During its review, PHMSA identified three reportable accidents on the Colonial system
where performance of a covered task caused or contributed to the accident. These accidents
were documented on PHMSA Form 7000-1, titled “Accident Report-Hazardous Liquid
Pipeline Systems,” and submitted electronically via the Online Data Entry System (ODES).
The specific report numbers and submittal dates are as follows:
 No. 20140287-20157 Date 08/11/2014
 No. 20150286-20902 Date 08/13/2015
 No. 20150326-20738 Date 09/12/2015
All three accidents occurred while performing excavation or backfilling activities. Per
Colonial’s OQ program, these activities required Covered Tasks 32.0 and 39.0, titled
“Observation of Excavation Activities” and “Backfilling a Trench Following Maintenance,”
respectively.
Colonial documented its response to each of the above-referenced reportable accidents in an
Incident Analysis Report. Each Incident Analysis Report documents actions taken by
Colonial in response to each respective accident. None of the Incident Analysis Reports
documented that performance of a covered task was involved, whether performance of a
covered task contributed to the accident, or which individuals performed any covered tasks
during the activities leading to each accident. Furthermore, Colonial personnel were unable
to confirm any Appendix D “Disqualification or Suspension” documentation had been
completed, that any information was forwarded to the OQ Coordinator, or that Colonial’s
Technical Training Department was notified, as required by Section 12 of Colonial’s
Operator Qualification Program. Consequently, Colonial was unable to demonstrate its
compliance with § 195.505(d).
2



2. §195.505 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a)…
(b) Ensure through evaluation that individuals performing covered tasks are
qualified…
Colonial failed to comply with the regulation because it did not ensure through evaluation
that individuals performing covered tasks were qualified.
At the time of PHMSA’s inspection, Colonial’s OQ program relied on three OQ service
providers to provide evaluation material, herein referred to as OQ Service Provider A, B
and C. PHMSA’s review identified several instances where the evaluation material across
the three service providers was inadequate to evaluate an individual’s knowledge, skill and
ability to perform a given covered task.
All three service providers relied on a written, electronic, or verbal examination to evaluate
an individual’s knowledge of the covered task, as well as a performance verification to
evaluate an individual’s skill and ability to perform the covered task. Evaluation materials
were identified that were not applicable to the given covered task or lacked a sufficient
number of questions, or questions of sufficient detail, to evaluate an individual’s knowledge
of the task. Furthermore, performance verification material was identified that did not
require performance of the task. Moreover, at least one of Colonial’s service providers’
evaluation materials required knowledge of Colonial procedures and policies despite the fact
that Colonial’s OQ program itself did not contain provisions for assuring knowledge of these
procedures and policies. Consequently, the above-referenced evaluation materials were not
developed and tailored to specific provisions and operational parameters of Colonial’s OQ
program.
The following examples detail four Covered Tasks with evaluation methods for determining
an individual’s knowledge of the task, as well as performance verification to evaluate an
individual’s skill and ability to perform the task, that were found to be inadequate:
1. Covered Task 7.7, titled “Perform Coating Inspection”
Colonial’s OQ Program accepted two examinations from OQ Service Provider A, one of
which was titled Aboveground Pipe Coating and Inspection. This examination could be
used to evaluate an individual’s knowledge of the task. PHMSA’s review of the above-
referenced examination determined that it was inadequate for determining an
individual’s knowledge of the task. Of the 20 multiple choice questions included in the
evaluation, no questions examined the individual’s knowledge of evaluating surface
preparation, measuring coating thickness, visually inspecting coatings or conducting
holiday testing. Understanding of each of these aspects of a coating inspection is
fundamental to demonstrating knowledge of the task.
The OQ plan accepted two performance verifications from OQ Service Provider A,
Visual Inspection for Atmospheric Coating and Use Coating Inspection Tools, either of
which could be used to evaluate an individual’s skill and ability to perform the task. The
3



2. performance verification Visual Inspection for Atmospheric Coating was not applicable
to performing visual coating inspections. It was intended for atmospheric corrosion
inspections and did not address the use of any type of coating inspection equipment. The
performance verification Use Coating Inspection Tools was inadequate to the task. It
required the individual to conduct wet film and dry film thickness measurements,
electronic holiday detection test and adhesion tests but did not require evaluation of
surface preparation or measurement of surface temperature, ambient temperature, dew
point or relative humidity all of which are required, and fundamental, to perform the task.
The OQ plan accepted two examinations and the accompanying performance
verifications from OQ Service Provider B, Prevention of Atmospheric Corrosion and
Electrical Inspection of Coatings (jeeping), either could be used to evaluate an
individual’s knowledge, skill and ability to perform the task. Prevention of Atmospheric
Corrosion is a module that addresses a number of coating related tasks such as
atmospheric corrosion inspection, surface preparation, coating application and coating
inspection. It contains twenty-five multiple choice questions that are administered after
going through a training module. The training module contained many technical errors
such as indicating that a Barchol Hardness Tester can be used to measure coating dry film
thickness and a Tooke Gauge can be used to conduct Holiday Testing. A Barchol
Hardness Tester measures coating hardness and a Tooke Gauge measure coating
thickness through destructive testing. The training module also incorrectly referred to
FBE Tape Coatings. FBE (fusion bonded epoxy) is a powder coating, not a tape wrap. Of
the twenty-five questions, only a few pertained specifically to coating inspection and
most were too simple to adequately evaluate an individual’s knowledge of the task such
as “How is wet film thickness measured?” with the correct answer being “wet film
thickness gauge.”
The module Electrical Inspection of Coatings (jeeping) only applied to use of an
electrical holiday tester. Both the examination and accompanying performance
verification were inadequate for the task because they only addressed one type of
inspection instrument and not all the other instruments and activities such as visual
inspections that would be required to perform the task.
The OQ plan accepted two evaluations from OQ Service Provider C, one of which was
titled ” Inspection of Above and Below Ground Coatings.” The referenced evaluation
was not adequate to evaluate an individual’s skill and ability to perform the task because
it was administered by oral examination. It did not verify that the individual was capable
of correctly using any of the required coating inspection instrumentation.
Covered Task 7.6, titled “Apply Coating Using Spray Application”
The OQ plan accepted two examinations and accompanying performance verifications
from OQ Service Provider B, Prevention of Atmospheric Corrosion and Application and
Repair of External Coatings. Both examinations did not include any questions pertaining
to spray application of coatings.
Furthermore, the above-referenced performance verification, titled “Application and
Repair of External Coatings” did not require the coating to be applied by spray
4



3. 4. application. It indicated the equipment and material needed to perform the evaluation
were “Brush, Roller, Coating, Sandblasting equipment, Water blasting equipment and
Hand tools.”
Covered Task 32.0, titled “Observation of Excavation Activities”
The OQ plan accepted OQ Service Provider A’s examination and performance
verification, titled “Excavating and Backfilling.” The examination contained twenty
multiple choice questions, few of which pertained to excavation activities. The
performance verification required the individual to locate or simulate locating the
pipeline, installing or simulating installation of a line marker, and inspecting and
maintaining or simulating inspecting and maintaining a line marker, all of which are
stand-alone covered tasks. The performance verification then required the individual to
explain backfilling requirements and using company manuals or procedure books
explain what trainees should do if they encounter any damage or defects while
performing any of the above tasks. The performance verification did not require any
excavation activities be performed or simulated.
The OQ plan accepted OQ Service Provider B’s examination and performance
verification, titled “Damage Prevention During Excavation Activities.” The training module
and the accompanying examination made reference to performing activities in accordance
with the operator’s policies and procedures. The training module contained a disclaimer that
indicated using the material constituted acceptance that the material must be
supplemented with company specific instruction of the policies and procedures of the
company. All OQ Service Provider B’s material contained this disclaimer. Colonial’s
OQ plan, however, did not contain any provisions for evaluating an individual’s
knowledge of Colonial’s policies and procedures which made this service provider’s
materials inadequate as a sole evaluation of an individual’s knowledge of this task.
Likewise, the performance verification permitted actual performance of the task,
simulation of the task, or oral assessment. Oral assessment is not acceptable because it
does not evaluate an individual’s skill and ability to perform the task. An individual could
be qualified for this task without ever having been at an excavation site or performing
any excavation activities.
The OQ plan accepts one evaluation from OQ Service Provider C, titled “Observation of
Excavating and Backfilling.” This evaluation was to be done by oral assessment only. As
described above, this is not acceptable because oral assessment does not evaluate an
individual’s skill and ability to perform the task. An individual could be qualified for this
task without ever having been at an excavation site or performing any excavation
activities.
Covered Task 39.0, titled “Backfilling a Trench Following Maintenance”
The OQ plan accepts OQ Service Provider B’s examination and performance verification,
titled “Backfilling a Trench Following Maintenance.” The training module that
accompanies the examination indicates that “company personnel” will be present at the
excavation site to take responsibility for certain functions of this task, such as
5



understanding soil types and soil compaction requirements. The above-referenced
training module contains a section titled “Prerequisite Knowledge” that indicates “prior
to backfilling a trench company personnel must be familiar with soil types, soil
compaction methods and backfilling operations.” The training module also indicates
“company personnel are responsible for compacting backfill.” One of the exam questions
was “Who is ultimately responsible for determining whether backfill material is suitable
for backfill around the pipe?” with the correct answer being “Company Personnel.” This
training module and exam are not acceptable for the task since the material indicates that
the individual being evaluated will not be responsible for understanding soil types or soil
compaction requirements, “Company Personnel” will have that responsibility. Moreover,
PHMSA’s review revealed that Colonial does not always require company personnel to
be present during backfilling activities, which further nullifies the adequacy of the above-
referenced examination and performance verification.
As with the covered task referenced in Item 3 above, titled “Observation of Excavation
Activities,” the performance verification from OQ Service Provider B could be done by
oral assessment and the performance verification from OQ Service Provider C was only
done by oral assessment, which is not adequate for the given task.
Proposed Civil Penalty
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$209,002 per violation per day the violation persists, up to a maximum of $2,090,022 for a
related series of violations. For violations occurring prior to November 2, 2015, the maximum
penalty may not exceed $200,000 per violation per day, with a maximum penalty not to exceed
$2,000,000 for a related series of violations. The Compliance Officer has reviewed the
circumstances and supporting documentation involved in Item 1 above and has recommended
that you be preliminarily assessed a civil penalty of $67,000.
Proposed Compliance Order
With respect to Item 2, pursuant to 49 U.S.C. § 60118, the Pipeline and Hazardous Materials
Safety Administration proposes to issue a Compliance Order to Colonial Pipeline Company.
Please refer to the Proposed Compliance Order, which is enclosed and made a part of this
Notice.
Response to this Notice
Enclosed as part of this Notice is a document entitled Response Options for Pipeline Operators
in Compliance Proceedings. Please refer to this document and note the response options. All
material you submit in response to this enforcement action may be made publicly available. If
you believe that any portion of your responsive material qualifies for confidential treatment
under 5 U.S.C. 552(b), along with the complete original document you must provide a second
copy of the document with the portions you believe qualify for confidential treatment redacted
and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, or request a
hearing under 49 CFR § 190.211. If you do not respond within 30 days of receipt of this Notice,
6



this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the
Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order. If you are responding to this Notice, we propose that
you submit your correspondence to my office within 30 days from receipt of this Notice. This
period may be extended by written request for good cause.
In your correspondence on this matter, please refer to CPF 2-2018-5003 and, for each document
you submit, please provide a copy in electronic format whenever possible.
Sincerely,
James A. Urisko
Director, Office of Pipeline Safety
PHMSA Southern Region
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Compliance Proceedings
7



PROPOSED COMPLIANCE ORDER
Pursuant to 49 United States Code § 60118, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to Colonial Pipeline Company (Colonial) a
Compliance Order incorporating the following remedial requirements to ensure the compliance
of Colonial with the pipeline safety regulations:
1. 2. 3. In regard to Item Number 2 of the Notice pertaining to evaluation of individuals
performing covered tasks,
a. Review all written, electronic and oral examinations to assure they contain
a sufficient number of questions with sufficient detail and complexity to
establish an individual’s knowledge of the given covered task and a
knowledge of Colonial’s procedures for performing the covered task.
b. Review all performance verification materials to assure they provide for
actual performance of the covered task in accordance with Colonial’s
procedures.
c. Replace, modify or supplement all evaluation material to assure the
material will adequately establish an individual’s knowledge, skill and
ability to perform a covered task properly and in accordance with Colonial
procedures.
Within 90 days of issuance of the Final Order, Colonial must submit to the
Director, Office of Pipeline Safety, PHMSA Southern Region, documentation
showing satisfactory completion of Item 2, including, at a minimum, a list of all
evaluations that were replaced, modified or supplemented.
It is requested (not mandated) that Colonial maintain documentation of the safety
improvement costs associated with fulfilling this Compliance Order and submit
the total to James A. Urisko, Director, Southern Region, Pipeline and Hazardous
Materials Safety Administration. It is requested that these costs be reported in
two categories: 1) total cost associated with preparation/revision of plans,
procedures, studies and analyses, and 2) total cost associated with replacements,
additions and other changes to pipeline infrastructure.
8

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220185003>
- Source ID: `phmsa-enforcement`
- SHA-256: `f2edb69c9e77f9cee19151b93bb486dec32c11c6ebcd75718459c5a41e53dd4d`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T06:54:44.066Z
- Document slug: `phmsa-enforcement-220185003`

### Source metadata

```json
{
  "cpf": "220185003",
  "operator": "COLONIAL PIPELINE CO",
  "region": "Southern",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.505(b)",
    "195.505(d)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 10,
  "attachments": [
    {
      "name": "220185003_Closure Letter_03132026_(16-154847S).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Closure%20Letter_03132026_(16-154847S).pdf",
      "bytes": 168512,
      "category": "agency_document"
    },
    {
      "name": "220185003_Closure Letter_03132026_(16-154847S)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Closure%20Letter_03132026_(16-154847S)_text.pdf",
      "bytes": 170730,
      "category": "agency_document"
    },
    {
      "name": "220185003_Final Order_07132020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Final%20Order_07132020.pdf",
      "bytes": 196536,
      "category": "agency_document"
    },
    {
      "name": "220185003_Final Order_07132020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Final%20Order_07132020_text.pdf",
      "bytes": 225717,
      "category": "agency_document"
    },
    {
      "name": "220185003_NOPV PCP PCO_08282018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_NOPV%20PCP%20PCO_08282018.pdf",
      "bytes": 1610191,
      "category": "agency_document"
    },
    {
      "name": "220185003_NOPV PCP PCO_08282018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_NOPV%20PCP%20PCO_08282018_text.pdf",
      "bytes": 155166,
      "category": "agency_document"
    },
    {
      "name": "220185003_Operator Response to Notice and Request for Hearing_09282018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing_09282018.pdf",
      "bytes": 388045,
      "category": "party_submission"
    },
    {
      "name": "220185003_Operator Withdrawal of Hearing Request_10292019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_Operator%20Withdrawal%20of%20Hearing%20Request_10292019.pdf",
      "bytes": 480792,
      "category": "party_submission"
    },
    {
      "name": "220185003_PHC Hearing Scheduled_09272019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_PHC%20Hearing%20Scheduled_09272019.pdf",
      "bytes": 223893,
      "category": "agency_document"
    },
    {
      "name": "220185003_PHC Hearing Scheduled_09272019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220185003/220185003_PHC%20Hearing%20Scheduled_09272019_text.pdf",
      "bytes": 82777,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 4,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "COLONIAL PIPELINE CO"
}
```