CLOSED warning letter citing 195.505.

## Document text

Warning Letter involving CENTRAL FLORIDA PIPELINE CORP. PHMSA's enforcement data identifies the cited regulation as 195.505. The case was opened on 2018-02-28 and is reported as closed as of 2018-02-28. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220186001W_Warning Letter_02282018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220186001W/220186001W_Warning%20Letter_02282018.pdf

220186001W_Warning Letter_02282018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220186001W/220186001W_Warning%20Letter_02282018_text.pdf

220186001W_Warning Letter_02282018_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 28, 2018
Mr. James Holland
President, Products Pipelines
Kinder Morgan Energy Partners, L.P.
Central Florida Pipeline Company
500 Dallas Street, Suite 1000
Houston, TX 77002
CPF 2-2018-6001W
Dear Mr. Holland:
From October 30, 2017 through November 3, 2017, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected the Central Florida
Pipeline Company (CFPL) pipeline facilities and records in Tampa, Florida. CFPL is a
subsidiary of Kinder Morgan Energy Partners, L.P (KM).
As a result of the inspection, it is alleged that CFPL has committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The item
inspected and the probable violation is as follows:
1. §195.505 Qualification program.
Each operator shall have and follow a written qualification program.
CFPL failed to meet the regulation because it did not follow provisions of its written
qualification program. Specifically, it did not ensure personnel performing covered tasks
were qualified for those tasks, per its Operator Qualification (OQ) program. CFPL is a
subsidiary of KM, and incorporates KM’s OQ Program.
CFPL inspects its pipeline right-of-way (ROW) by aerial patrol. Per KM’s Task
Qualification Summary Report, the following covered tasks were required to perform
aerial patrolling duties:



 Task Code 101.01, titled “Abnormal Operating Conditions-Outside of Control
Room”
 Task Code 104.05, titled “Inspect Surface Condition of Right-of-Way”
Furthermore, Appendix B of KM’s OQ Program, titled “List of Covered Tasks,” indicated
a 3-year requalification interval for both the above-referenced covered tasks.
During records review, the PHMSA inspector noted the individual performing the aerial
patrol qualified for the above-referenced tasks on August 19, 2013. Those qualifications
expired on December 31, 2016, with no record of any requalification. Further review of
CFPL’s aerial patrol records for calendar year 2017 indicated the same individual
performed regular aerial patrols through October 2017, approximately 10 months after the
expiration of their qualification for the required tasks.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $209,002 per violation per day the violation persists, up to a maximum of $2,090,022
for a related series of violations. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
not to exceed $2,000,000 for a related series of violations. We have reviewed the
circumstances and supporting documents involved in this case, and have decided not to
conduct additional enforcement action or penalty assessment proceedings at this time. We
advise you to correct the items identified in this letter. Failure to do so will result in Central
Florida Pipeline Company being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 2-2018-6001W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
James A. Urisko
Director, Office of Pipeline Safety
PHMSA Southern Region
2

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220186001W>
- Source ID: `phmsa-enforcement`
- SHA-256: `87758886cc2954f7457181e39d732d28a59e2b9f6fd2b42a9c86993e394777f5`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T07:34:04.552Z
- Document slug: `phmsa-enforcement-220186001w`

### Source metadata

```json
{
  "cpf": "220186001W",
  "operator": "CENTRAL FLORIDA PIPELINE CORP",
  "region": "Southern",
  "pipelineType": "INTRASTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.505"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "220186001W_Warning Letter_02282018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220186001W/220186001W_Warning%20Letter_02282018.pdf",
      "bytes": 331947,
      "category": "agency_document"
    },
    {
      "name": "220186001W_Warning Letter_02282018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220186001W/220186001W_Warning%20Letter_02282018_text.pdf",
      "bytes": 123373,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CENTRAL FLORIDA PIPELINE CORP"
}
```