# GENESIS PIPELINE USA, L.P. — Notice of Probable Violation

**Citation:** CPF 220195001  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2019-01-25

CLOSED notice of probable violation citing 195.452(f)(1), 195.452(i)(1), 195.452(i)(2), 195.452(j)(2).

## Document text

Notice of Probable Violation involving GENESIS PIPELINE USA, L.P.. PHMSA's enforcement data identifies the cited regulations as 195.452(f)(1),  195.452(i)(1),  195.452(i)(2),  195.452(j)(2). The case was opened on 2019-01-25 and is reported as closed as of 2020-02-05. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220195001_Closure Letter_02052020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Closure%20Letter_02052020.pdf

220195001_Closure Letter_02052020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Closure%20Letter_02052020_text.pdf

220195001_Final Order_08082019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Final%20Order_08082019.pdf

220195001_Final Order_08082019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Final%20Order_08082019_text.pdf

220195001_NOPV PCO_01252019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_NOPV%20PCO_01252019.pdf

220195001_NOPV PCO_01252019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_NOPV%20PCO_01252019_text.pdf

220195001_Operator Response to Notice_02252019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Operator%20Response%20to%20Notice_02252019.pdf

220195001_Final Order_08082019_text.pdf

August 8, 2019
Mr. Grant E. Sims
Chief Operating Officer
Genesis Energy, LP
919 Milam Street, Suite 2100
Houston, Texas 77002
Re: CPF No. 2-2019-5001
Dear Mr. Sims:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and specifies actions that need to be taken by your subsidiary, Genesis Pipeline USA,
LP, to comply with the pipeline safety regulations. When the terms of the compliance order have
been completed, as determined by the Director, Southern Region, this enforcement action will be
closed. Service of the Final Order by certified mail is effective upon the date of mailing, as
provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. James Urisko, Director, Southern Region, Office of Pipeline Safety, PHMSA
Mr. Jeffrey W. Gifford, Vice President, HSSE, Genesis Pipeline USA, LP
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Genesis Pipeline USA, LP, ) CPF No. 2-2019-5001
a subsidiary of Genesis Energy, LP, )
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
From February 26 through June 8, 2018, pursuant to 49 U.S.C. § 60117, representatives of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an on-site pipeline safety inspection of the facilities and records of Genesis
Pipeline USA, LP, and Genesis Pipeline Alabama, LLC, subsidiaries of Genesis Energy, LP,1
(collectively referred to as Genesis or Respondent) in Alabama, Florida, Mississippi. Genesis
Pipeline USA, LP, consists of 4-inch through 6-inch pipelines transporting crude oil in Alabama,
Florida, and Mississippi. Genesis Pipeline Alabama, LLC, is a 31-mile 8-inch pipeline
transporting crude oil in Alabama.
As a result of the inspection, the Director, Southern Region, OPS (Director), issued to
Respondent, by letter dated January 25, 2019, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that Genesis had committed four violations of 49 C.F.R. Part 195 and proposed ordering
Respondent to take certain measures to correct the alleged violations.
Genesis responded to the Notice by letter dated February 25, 2019 (Response). The company
did not contest the allegations of violation but provided information concerning the corrective
actions it had taken. Respondent did not request a hearing and therefore has waived its right to
one.
FINDINGS OF VIOLATION
In its Response, Genesis did not contest the allegations in the Notice that it violated 49 C.F.R.
Part 195, as follows:
1 US SEC Form 10-K, Ex. 21.1, Genesis Energy, LP, available at
https://www.sec.gov/Archives/edgar/data/1022321/000102232118000024/gel12312017exhibit211 htm (last
accessed July 17, 2019).



CPF No. 2-2019-5001
Page 2
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(1) which states, in
relevant part:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) ….
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments,
and other maintenance and surveillance data, and evaluation of
consequences of a failure on the high consequence area. An operator must
include, at minimum, each of the following elements in its written integrity
management program:
(1) A process for identifying which pipeline segments could affect a
high consequence area...
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(1) by failing to include in its
Integrity Management (IM) Program a process for identifying which pipeline segments could
affect a high consequence area (HCA). Specifically, the Notice alleged that Genesis’ IM
program did not include a process for identifying facilities other than line pipe on its pipeline
system that could affect a HCA.
The integrity management regulations in section §195.452 are applicable to all pipelines that
meet the requirements in 195.452(a). Specifically, §195.452 (a) through (k) applies to “each
hazardous liquid pipeline and carbon dioxide pipeline that could affect a high consequence
area….” A “Pipeline or pipeline systems” and a “Pipeline facility” are defined in §195.2
Definitions. Pipeline or pipeline system means all part of a pipeline facility through which a
hazardous liquid or carbon dioxide moves in transportation, including but not limited to, line
pipe, valves, and other appurtenances connected to line pipe, pumping units, fabricated
assemblies associated pumping units, metering and delivery stations and fabricated assemblies
therein, and breakout tanks. Pipeline facility means new and existing pipe, rights-of-way and
any equipment, facility, or building used in the transportation of hazarouds liquids or carbon
dioxide.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
the evidence, I find that Respondent violated 49 C.F.R. § 195.452(f)(1) by failing to include in
its IM program a process for identifying facilities other than line pipe on its pipeline segment that
could affect an HCA.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(1), which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) ….
(i) What preventative and mitigative measures must an operator take to
protect the high consequence area?—(1) General requirements. An
operator must take measures to protect and mitigate the consequences of a
failure that could affect a high consequence area. These measures include



CPF No. 2-2019-5001
Page 3
conducting a risk analysis of the pipeline segment to identify additional
actions to enhance public safety or environmental protection where
corrosion is a concern, establishing shorter inspection intervals, installing
EFRDs on the pipeline segment, modifying the systems that monitor
pressure and detect leaks, providing additional training to personnel on
response procedures, conducting drills with local emergency responders
and adopting other management controls.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(1) by failing to take
measures to prevent and mitigate the consequences of a pipeline failure that could affect an
HCA. Specifically, the Notice alleged that Genesis did not identify preventative and mitigative
measures (P&MMs) for facilities other than line pipe on its pipeline system that could affect an
HCA (See Item 1 for a definition of a pipeline system).
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 195.452(i)(1) by failing to take
measures to prevent and mitigate the consequences of a pipeline failure that could affect an
HCA.
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(2), which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) ….
(i) What preventative and mitigative measures must an operator take to
protect the high consequence area?
(1) ….
(2) Risk analysis criteria. In identifying the need for additional
preventive and mitigative measures, an operator must evaluate the
likelihood of a pipeline release occurring and how a release could affect the
high consequence area. This determination must consider all relevant risk
factors, including, but not limited to:
(i) Terrain surrounding the pipeline segment, including drainage
systems such as small streams and other smaller waterways that could act
as a conduit to the high consequence area;
(ii) Elevation profile;
(iii) Characteristics of the product transported;
(iv) Amount of product that could be released;
(v) Possibility of a spillage in a farm field following the drain tile into
a waterway;
(vi) Ditches along side a roadway the pipeline crosses;
(vii) Physical support of the pipeline segment such as by a cable
suspension bridge;
(viii) Exposure of the pipeline to operating pressure exceeding
established maximum operating pressure.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(2) by failing to perform a
risk analysis evaluating the likelihood of a pipeline release occurring and how a release could



CPF No. 2-2019-5001
Page 4
affect the high consequence area. Specifically, the Notice alleged that Genesis failed to include
pipeline facilities other than line pipe in its risk analysis. (See Item 1 for a definition of a pipeline
facility).
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 195.452(i)(2) by failing to perform a
risk analysis evaluating the likelihood of a pipeline release occurring from pipeline facilities
other than line pipe and how a release could affect the high consequence area
Item 4: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(j)(2) which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) ….
(j) What is a continual process of evaluation and assessment to
maintain a pipeline’s integrity?
(1) ….
(2) Evaluation. An operator must conduct a periodic evaluation as
frequently as needed to assure pipeline integrity. An operator must base the
frequency of evaluation on risk factors specific to its pipeline, including the
factors specified in paragraph (e) of this section. The evaluation must
consider the results of the baseline and periodic integrity assessments,
information analysis (paragraph (g) of this section), and decisions about
remediation, preventive and mitigative actions (paragraphs (h) and (i) of
this section).
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(j)(2) by failing to conduct
periodic evaluations as frequently as needed to assure pipeline integrity. Specifically, the Notice
alleged that Genesis personnel were unable to produce any record or documentation that pipeline
facilities other than line pipe had ever been evaluated to assure their integrity. (See Item 1 for a
definition of a pipeline facility).Respondent did not contest this allegation of violation.
Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49
C.F.R. § 195.452(j)(2) by failing to conduct periodic evaluations as frequently as needed to
assure pipeline integrity on pipeline facilities other than line pipe.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1, 2, 3 and 4 in the Notice for
violations of 49 C.F.R. §§ 195.452(a)(f)(1), 195.452(i)(1), 195.452(i)(2), and 195.452(j)(2),
respectively. Under 49 U.S.C. § 60118(a), each person who engages in the transportation of
hazardous liquids or who owns or operates a pipeline facility is required to comply with the
applicable safety standards established under chapter 601. The Director has indicated that
Respondent has taken the following actions to address some of the cited violations:



CPF No. 2-2019-5001
Page 5
In its Response, Genesis provided updated, revised procedures to its IM program which partially
addressed the issues identified in the Notice, but have not yet achieved full compliance with the
terms of the Proposed Compliance Order (PCO) contained within the Notice.
Accordingly, I find that compliance has not been achieved with respect to these violations.
Therefore, the compliance terms proposed in the Notice for Items 1, 2, 3, and 4 are included in
this Order.
Accordingly, pursuant to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217,
Respondent is ordered to take the following actions to ensure compliance with the pipeline safety
regulations applicable to its operations:
1. With respect to the violation of § 195.452(f)(1) (Item 1), Respondent must:
a. Develop procedures for identifying facilities other than line pipe on its
pipeline system for inclusion in its Integrity Management (IM) program.
b. Submit procedures developed in accordance with 1a of this Compliance Order
to the Director, Office of Pipeline Safety (OPS), PHMSA Southern Region,
for approval.
c. Identify all facilities that could affect an HCA in accordance with the
approved procedures. Genesis must maintain records and documentation of
the results, and make those records available for OPS inspection.
2. With respect to the violations of §§ 195.452(i)(1), 195.452(i)(2), and
195.452(j)(2) (Items 2, 3, and 4), Respondent must:
a. Develop procedures for identifying preventative and mitigative measures
(P&MMs) for facilities other than line pipe on its pipeline system that could
affect an HCA for inclusion in its IM program.
b. Develop risk analysis procedures for facilities other than line pipe for
inclusion in its IM program.
c. Develop procedures to conduct periodic evaluations of pipeline facilities other
than line pipe on its pipeline system that could affect an HCA for inclusion in
its IM program.
d. Submit procedures developed in accordance with 2a, 2b, and 2c of this
Compliance Order to the Director, OPS, PHMSA Southern Region, for
approval.
e. Identify P&MMs, perform risk analysis, and conduct evaluations of facilities
other than line pipe on its pipeline system that could affect an HCA, in
accordance with the approved procedure. Genesis must maintain all records
and documentation of the results, and make those records available for OPS



CPF No. 2-2019-5001
Page 6
inspection, upon request.
3. Genesis must complete the above items within the following time requirements:
a. Within 30 days of receipt of the Final Order, Genesis must complete the
requirements of Items 1a, 2a, and 2c of this Compliance Order.
b. Within 90 days of receipt of the Final Order Genesis must complete the
requirements of Items 1b and 2d of this Compliance Order.
c. Within 150 days of receipt of the Final Order, Genesis must provide written
documentation summarizing the results of Items 1c and 2e of this Compliance
Order to the Director, OPS, PHMSA Southern Region, for approval.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
It is requested (not mandated) that Respondent maintain documentation of the safety
improvement costs associated with fulfilling this Compliance Order and submit the total to the
Director. It is requested that these costs be reported in two categories: (1) total cost associated
with preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated
with replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in administrative assessment of civil penalties not
to exceed $200,000, as adjusted for inflation (49 C.F.R. § 190.223), for each violation for each
day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address, no later than 20 days after receipt of service of this
Final Order by Respondent. Any petition submitted must contain a statement of the issue(s) and
meet all other requirements of 49 C.F.R. § 190.243. The terms of the order, including corrective
action, remain in effect unless the Associate Administrator, upon request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
August 8, 2019
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

220195001_Closure Letter_02052020_text.pdf

FEDEX EXPRESS MAIL
February 5, 2020
Mr. Grant E. Sims
Chief Operating Officer
Genesis Energy, LP
919 Milam Street, Suite 2100
Houston, Texas 77002
CPF No. 2-2019-5001
Dear Mr. Sims:
On August 8, 2019, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Genesis Pipeline USA, LP (Genesis) a Final Order in the above-referenced case. The
Final Order included a Compliance Order (CO) which required Genesis to undertake certain
actions to ensure compliance with the federal pipeline safety regulations.
In response to the CO, Genesis made numerous submittals to OPS Southern Region,
documenting its efforts toward compliance.
Based upon our review of documentation of actions taken, we have determined that Genesis has
complied with the terms of the CO and the Final Order. This case is now closed and no further
action is necessary with respect to the matters involved in this case.
Please be advised that this letter refers only to the above referenced order (CPF 2-2019-5001)
and not to any other PHMSA cases, if any.
Sincerely,
James A. Urisko
Director, Office of Pipeline Safety
PHMSA Southern Region

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220195001>
- Source ID: `phmsa-enforcement`
- SHA-256: `a417a146d59a98665c95751ab54e84a5cea8b9ad8da2ee894c6e348552e218a7`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T01:36:55.536Z
- Document slug: `phmsa-enforcement-220195001`

### Source metadata

```json
{
  "cpf": "220195001",
  "operator": "GENESIS PIPELINE USA, L.P.",
  "region": "Southern",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.452(f)(1)",
    "195.452(i)(1)",
    "195.452(i)(2)",
    "195.452(j)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "220195001_Closure Letter_02052020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Closure%20Letter_02052020.pdf",
      "bytes": 114693,
      "category": "agency_document"
    },
    {
      "name": "220195001_Closure Letter_02052020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Closure%20Letter_02052020_text.pdf",
      "bytes": 77679,
      "category": "agency_document"
    },
    {
      "name": "220195001_Final Order_08082019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Final%20Order_08082019.pdf",
      "bytes": 1936447,
      "category": "agency_document"
    },
    {
      "name": "220195001_Final Order_08082019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Final%20Order_08082019_text.pdf",
      "bytes": 177587,
      "category": "agency_document"
    },
    {
      "name": "220195001_NOPV PCO_01252019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_NOPV%20PCO_01252019.pdf",
      "bytes": 539387,
      "category": "case_document"
    },
    {
      "name": "220195001_NOPV PCO_01252019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_NOPV%20PCO_01252019_text.pdf",
      "bytes": 196703,
      "category": "case_document"
    },
    {
      "name": "220195001_Operator Response to Notice_02252019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220195001/220195001_Operator%20Response%20to%20Notice_02252019.pdf",
      "bytes": 674113,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "GENESIS PIPELINE USA, L.P."
}
```