# CITGO PETROLEUM CORPORATION (TERMINALS) — Notice of Probable Violation

**Citation:** CPF 220196001  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2019-11-20

CLOSED notice of probable violation citing 195.440(b), 195.452(i)(3).

## Document text

Notice of Probable Violation involving CITGO PETROLEUM CORPORATION (TERMINALS). PHMSA's enforcement data identifies the cited regulations as 195.440(b),  195.452(i)(3). The case was opened on 2019-11-20 and is reported as closed as of 2020-04-24. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

220196001_Final Order_04242020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_Final%20Order_04242020.pdf

220196001_Final Order_04242020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_Final%20Order_04242020_text.pdf

220196001_NOPV PCO_11202019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_NOPV%20PCO_11202019.pdf

220196001_NOPV PCO_11202019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_NOPV%20PCO_11202019_text.pdf

220196001_Operator Response to Notice_01212020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_Operator%20Response%20to%20Notice_01212020.pdf

220196001_Final Order_04242020_text.pdf

April 24, 2020
VIA EMAIL TO: cjorda@citgo.com
Mr. Carlos E. Jordá
President and Chief Executive Officer
Citgo Petroleum Corporation
1293 Eldridge Parkway
Houston, Texas 77077
Re: CPF No. 2-2019-6001
Dear Mr. Jordá
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and finds that the proposed actions to comply with the pipeline safety regulations have
been completed. This case is now closed. Service of the Final Order by electronic mail is
effective upon the date of transmission as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. James A. Urisko, Southern Region Director, Office of Pipeline Safety, PHMSA
Mr. Karl Schmidt, Vice President, Supply and Marketing, Citgo Petroleum
Corporation, kschmid@citgo.com
Mr. Robert B. Bertrand, Environmental, Health, Safety, and Security Manager, Citgo
Petroleum Corporation, rbertr1@citgo.com
CONFIMRATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Citgo Petroleum Corporation, ) CPF No. 2-2019-6001
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On November 20, 2019, pursuant to 49 C.F.R. § 190.207, the Director, Southern Region, Office
of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Citgo Petroleum
Corporation (Respondent). The Notice proposed finding that Respondent had violated the
pipeline safety regulations in 49 C.F.R. Part 195 and proposed certain measures to correct the
violations. Respondent did not contest the allegations of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.440(b) (Item 1) ─ Respondent failed to follow the general
program recommendations of API RP 1162 and assess the unique attributes and
characteristics of its Port Everglades Beeline pipeline.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
The Director has indicated that Respondent completed the actions proposed in the Notice to
correct the violations. Therefore, it is not necessary to include the proposed compliance terms in
this Final Order.
WARNING ITEM
With respect to Item 2, the Notice alleged a probable violation of 49 C.F.R. § 195.452(i)(3), but
did not propose a civil penalty or compliance order for this item. Therefore, this is considered to
be a warning item. If OPS finds a violation of this provision in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.



CPF 2-2019-6001
Page 2
§ 190.5.
April 24, 2020
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/220196001>
- Source ID: `phmsa-enforcement`
- SHA-256: `6664af9e8a349285cbc65c1fd0b6b792b784866dee9ced35c86cb834bcadccf8`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T09:28:36.121Z
- Document slug: `phmsa-enforcement-220196001`

### Source metadata

```json
{
  "cpf": "220196001",
  "operator": "CITGO PETROLEUM CORPORATION (TERMINALS)",
  "region": "Southern",
  "pipelineType": "INTRASTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.440(b)",
    "195.452(i)(3)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "220196001_Final Order_04242020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_Final%20Order_04242020.pdf",
      "bytes": 675272,
      "category": "agency_document"
    },
    {
      "name": "220196001_Final Order_04242020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_Final%20Order_04242020_text.pdf",
      "bytes": 106540,
      "category": "agency_document"
    },
    {
      "name": "220196001_NOPV PCO_11202019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_NOPV%20PCO_11202019.pdf",
      "bytes": 754929,
      "category": "case_document"
    },
    {
      "name": "220196001_NOPV PCO_11202019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_NOPV%20PCO_11202019_text.pdf",
      "bytes": 157906,
      "category": "case_document"
    },
    {
      "name": "220196001_Operator Response to Notice_01212020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/220196001/220196001_Operator%20Response%20to%20Notice_01212020.pdf",
      "bytes": 260494,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CITGO PETROLEUM CORPORATION (TERMINALS)"
}
```
