# NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Notice of Probable Violation

**Citation:** CPF 320035010  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2003-03-13

CLOSED notice of probable violation citing 195.404(b), 195.414, 195.436.

## Document text

Notice of Probable Violation involving NUSTAR PIPELINE OPERATING PARTNERSHIP L.P.. PHMSA's enforcement data identifies the cited regulations as 195.404(b),  195.414,  195.436. The case was opened on 2003-03-13 and is reported as closed as of 2006-03-20. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320035010_Final Order_01032006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035010/320035010_Final%20Order_01032006.pdf

CPF No 3-2003-5010 Kaneb Pipe Line Operating Partnership LP.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320035010/CPF%20No%203-2003-5010%20Kaneb%20Pipe%20Line%20Operating%20Partnership%20LP.pdf

320035010_Final Order_01032006.pdf

,l \t
U.S. Deportment
of Tronsportqtion
Plpellne ond
Hozonlou3 tlotedol3
Admlnbtrollon
4fi) Seventh Street, S.W.
Washington, D.C.20590
Sotefy
JAN -3 M6
Mr. L. Leroy Anderson
Vice President, Regulatory Affairs
Kaneb Pipe Line Operating Partnership, L.p.
7340 West 21st Street North, Suite 200
Wichita, KS 67205
Re: CPF No. 3-2003-5010
Dear Mr. Anderson:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in
the above-referenced case. It makes a finding of violation and specifies actions to be taken to
comply with the pipeline safety regulations. When the terms of the Compliance Order are
completed, as determined by the Director, Central Region, OPS, this enforcement action will
be closed. Your receipt of this Final Order constitutes service of that document under 49
c.F.R. S 190.s.
Sincerely,
J-- h*
James Reynolds
Pipeline Compliance Registry
Office of Pipeline Safety
Enclosure
cc: Mr. Ivan Huntoon
Director, Central Region, OPS
CERTIX'IED MAIL. RETURN RECEIPT REOUESTED



DEPARTMENT OF' TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAF'ETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of
Kaneb Pipe Line
Operating Partnership, L.P.,
Respondent.
)
)
)
)
)
)
)
CPF No.3-2003-5010
FINAL ORDER
On June 4-8, July 16-20, July 30-August 3, and December 10-14, 2}}l,pursuant to 49 U.S.C. S
60117, representatives of the Central Region, Pipeline andHazardous Materials Safety
Administration (PHMSA) conducted an on-site pipeline safety inspection of Respondent's
facilities and records in Kansas, South Dakota, Iowa, and Nebraska. As a result of the
inspection, the Director, Central Region, PHMSA, issued to Respondent, by letter dated March
13,2003, a Notice of Probable Violation and Proposed Compliance Order (Notice). In
accordance with 49 C.F.R. S 190.207, the Notice proposed finding that Respondent had
committed violations of 49 C.F.R. Part 195 and proposed that Respondent iake certain measures
to correct the alleged violations.
Respondent responded to the Notice by letter dated April 14,2003 (Response). Respondent did
not contest the allegations of violation, but provided information concerning the corrective
actions it has taken in response to the Notice. Respondent did not request a hearing, and
therefore has waived its rieht to one.
FINDING OF VIOLATION
Item 4 in the Notice alleged that Respondent violated 49 C.F.R. $ 195.436 by failing to
adequately protect all exposed facilities along its pipeline system from vandalism and
unauthorized entry. In its Response, Respondent did not contest this alleged violation.
Accordingly, I find that Respondent violated $ 195.436 by failing to adequately protect all
exposed facilities along its pipeline system from vandalism and unauthorized entry.
This finding cf
"'iolation'rill
taken against Respondent.
be considered a prior offtnse in any subsequent enforcement action



COMPLIANCE ORDER
The Notice proposed a Compliance Order with respect to Item 4 inthe Notice. Under 49 U.S.C.
$ 60118(a), each person who engages in the transportation of hazardous liquids or who owns or
operates a pipeline facility is required to comply with the applicable safety standards established
under chapter 601. Pursuant to the authority of 49 U.S.C. S 60118(b) and 49 C.F.R. S 190.217,
Respondent is ordered to take the following actions to ensure compliance with the pipeline safety
regulations applicable to its operations:
1. Review the security fencing at each pump station and breakout tank in the pipeline system
to determine which facilities require additional fencing;
2. Within 60 days following receipt of this Order, submit to the Director, Central Region,
PHMSA, a general plan anci proposed schedule for fencing each facility lacking adequate
security fencing; and
3. Within I year following receipt of this Order, complete all necessary fencing for the
system and submit records documenting completion of these actions to the Director,
Central Region, Office of Pipeline Safety, 901 Locust Street, Svite 462, Kansas City,
Missouri, 64106-2641.
The Regional Director may extend the period for complying with any of the required items if the
Respondent requests an extension in writing and adequately justifies the reasons for the
extension.
WARNING ITEMS
The Notice did not propose a civil penalty or compliance order for Items I,2, and 3 in the
Notice. Therefore, these are considered warning items. The warnings were for Respondent's
failure to maintain records of responses to abnormal operating conditions involving pumps that
were shut down by overpressure protection devices in accordance with $ 195.404(b); failure to
ensure that the cathodic protection for the Philipsburg station area met the applicable criteria in
accordance with $ 195.414; and failure to include valves on branch lines to pump stations as
mainline valves subject to inspection in accordance with $ 195.420(b). Respondent is warned
that if these items are not fully addressed, enforcement action will be taken if a subsequent
inspection reveals a violation.
Under 49 C.F.R. S 190.215, Respondent has a right to submit a petition for reconsideration of
this Final Order. Should Respondent elect to do so, the petition must be received within 20 days
of Respondent's receipt of this Order and must contain a brief statement of the issue(s). The
terms of this Order, including any required corrective action, remain in full effect unless the
Associate Administrator, upon written request, grants a stay.
Failure to comply with this Final Order may result in the assessment of civil penalties of up to



$100,000 per violation per day, or in the referral of the case for judicial enforcement. The terms
and conditions of this Final order are effective on receipt.
JAit - 3 trffi
iate Administrator
k"Date Issued
foi Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320035010>
- Source ID: `phmsa-enforcement`
- SHA-256: `f235a85ce032d624f33ae77fbf8e7faa3fbb31023d5f478242e2d68cdfc4a1fa`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T23:03:56.695Z
- Document slug: `phmsa-enforcement-320035010`

### Source metadata

```json
{
  "cpf": "320035010",
  "operator": "NUSTAR PIPELINE OPERATING PARTNERSHIP L.P.",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.404(b)",
    "195.414",
    "195.436"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "320035010_Final Order_01032006.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320035010/320035010_Final%20Order_01032006.pdf",
      "bytes": 172194,
      "category": "agency_document"
    },
    {
      "name": "CPF No 3-2003-5010 Kaneb Pipe Line Operating Partnership LP.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320035010/CPF%20No%203-2003-5010%20Kaneb%20Pipe%20Line%20Operating%20Partnership%20LP.pdf",
      "bytes": 138203,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "NUSTAR PIPELINE OPERATING PARTNERSHIP L.P."
}
```