# WOLVERINE PIPELINE CO — Notice of Probable Violation

**Citation:** CPF 320055024  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2005-06-02

CLOSED notice of probable violation citing 195.505, 195.505(b), 195.507(a)(3).

## Document text

Notice of Probable Violation involving WOLVERINE PIPELINE CO. PHMSA's enforcement data identifies the cited regulations as 195.505,  195.505(b),  195.507(a)(3). The case was opened on 2005-06-02 and is reported as closed as of 2006-11-03. Proposed civil penalty: $21,500. Assessed civil penalty: $11,750. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320055024_Final Order_10122006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055024/320055024_Final%20Order_10122006.pdf

CPF_NO_3-2005-5024.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320055024/CPF_NO_3-2005-5024.pdf

320055024_Final Order_10122006.pdf

400 Seventh Street, S.W.
U.S. Department Washington, D.C. 20590
of Transportation
Pipeline and Hazardous
Materials Safety Administration OCT 1 2 3 3 6
Mr. Larry D. Wilson
Vice President and Manager of Operations
Wolverine Pipe Line Company
8105 Valleywood Lane
Portage, MI 49024-525 1
Re: CPF No. 3-2005-5024
Dear Mr. Wilson,
Enclosed is the Final Order issued by the Acting Associate Administrator for Pipeline Safety
in the above-referenced case. It makes findings of violation, assesses a civil penalty of $1 1,750,
and acknowledges your completion of the proposed compliance order items to comply with the
pipeline safety regulations. When the civil penalty is paid, this enforcement will be closed. The
penalty payment terms are set forth in the Final Order. Your receipt of the Final Order
constitutes service of that document under 49 C.F.R. 5 190.5.
Sincerely,
Pipeline Compliance Registry
Office of Pipeline Safety
Enclosure
cc: Ivan A. Huntoon
Director, Central Region, OPS (PHP-300)
CERTIFIED MAIL- RETURN RECEIPT REOUESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
1
In the Matter of 1
1
Wolverine Pipe Line Company, ) CPF NO. 3-2005-5024
1
Respondent )
)
FINAL ORDER
On August 31- September 1,2004, pursuant to 49 U.S.C. 5 601 17, representatives of the Pipeline
and Hazardous Materials Safety Administration, Office of Pipeline Safety (OPS) conducted an
on-site pipeline safety inspection of Respondent's operator qualification (OQ) records and
procedures at its headquarters in Portage, Michigan. As a result of the inspection, the Director,
Central Region, OPS, issued to Respondent, by letter dated June 2, 2005, a Notice of Probable
Violation, Proposed Civil Penalty, and Proposed Compliance Order (Notice). In accordance
with 49 C.F.R. 5 190.207, the Notice proposed finding that Respondent had committed violations
of 49 C.F.R. Part 195, and proposed assessing a civil penalty of $21,500 for two of the alleged
violations. The Notice also proposed ordering Respondent to take certain measures to correct
one of the alleged violations.
By letter dated July 6,2005, Respondent requested an extension of the thirty-day deadline to
respond to the Notice. The Director, Central Region, OPS granted the extension until August 19,
2005. Respondent responded to the Notice by letter dated August 15,2005 (Response).
Respondent did not contest the allegations of violation, but offered information to explain the
allegations, described the corrective actions it had taken, and requested a reduction in the
proposed civil penalty amount. Respondent did not request a hearing, and therefore has waived
its right to one.
FINDINGS OF VIOLATION
In its Response, Respondent did not contest the alleged violations in the Notice. Accordingly, I
find that Respondent violated the following sections of 49 C.F.R. Part 195, as more fully
described in the Notice:
49 C.F.R. 5 195.505 (Notice Item 1) -failing to follow its written OQ plan and document
covered task qualification for a pipeline controller on task 6 in the 2002-2003 period;



49 C.F.R. 5 195.505 (Notice Item 2) -failing to follow its written OQ plan and conduct
annual re-evaluations of thirty-nine individuals for four tasks in 2003; and
49 C.F.R. 5 195.507(a)(3) (Notice Item 3) -failing to maintain records documenting the
dates of current qualification for seventeen employee evaluations in 2002 and two
evaluations in 2003.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. 5 601 22, Respondent is subject to a civil penalty not to exceed $100,000 per
violation for each day of the violation up to a maximum of $1,000,000 for any related series of
violations.
49 U.S.C. 5 60122 and 49 C.F.R. 5 190.225 require that, in determining the amount of the civil
penalty, I consider the following criteria: nature, circumstances, and gravity of the violation,
degree of Respondent's culpability, history of Respondent's prior offenses, Respondent's ability
to pay the penalty, good faith by Respondent in attempting to achieve compliance, the effect on
Respondent's ability to continue in business, and such other matters as justice may require.
With respect to Item 1, the Notice proposed a civil penalty of $2,000 for Respondents failure to
follow its written OQ plan and document covered task qualification for a specified pipeline
controller. In its Response, Respondent stated that it believed the individual had been qualified,
but acknowledged that it was unable to produce any record of this qualification. Along with
evaluation and qualification activity itself, accurate and complete recordkeeping is key to
monitoring the implementation and ongoing effectiveness of any OQ program. Respondent has
provided no information that would warrant a reduction in the civil penalty proposed in the
Notice for Item 1. Accordingly, I assess Respondent a civil penalty of $2,000 for violating 49
C.F.R. 5 195.505.
With respect to Item 2, the Notice proposed a civil penalty of $1 9,500 for Respondents failure to
evaluate thirty-nine individuals for four covered tasks for the year 2003. In its response,
Respondent acknowledged that these individuals had not been evaluated in 2003, but
demonstrated that all of them had been evaluated in 2002 and twice in 2004 and that the period
for which the qualifications had lapsed was actually only two months. Respondent also
described the prompt and aggressive corrective actions it had taken in response including placing
an experienced training coordinator to administer its OQ program and implementation of a
computer based OQ testing program which will remind employees, supervisors and the training
coordinator of re-qualification timelines and will track the dates when employees are requalified.
Based on this information, I find that a reduction in the civil penalty proposed in the Notice for
this item is warranted and Item 2 is reduced to $9,750. Accordingly, I assess Respondent a civil
penalty of $9,750 for violating 49 C.F.R 5 195.505.



For the reasons discussed above, having reviewed the record and considered the assessment
criteria, I assess Respondent a total civil penalty of $1 1,750.
Payment of the civil penalty must be made within 20 days of service. Federal regulations (49
C.F.R. 5 89.21(b)(3)) require this payment be made by wire transfer, through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMZ-300), Federal Aviation Administration, Mike
Monroney Aeronautical Center, P.O. Box 25082, Oklahoma City, OK 73 125; (405) 954-8893.
Failure to pay the $1 1,750 civil penalty will result in accrual of interest at the current annual rate
inaccordancewith31 U.S.C. 3717,31 C.F.R. 5 901.9and49C.F.R. tj 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per m u m will be charged if
payment is not made within 1 10 days of sewice. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a United
States District Court.
COMPLIANCE ORDER
With respect to Item 3, the Notice proposed a compliance order. Under 49 U.S.C. 5 601 18(a),
each person who engages in the transportation of hazardous liquids or who owns or operates a
pipeline facility is required to comply with the applicable safety standards established under
chapter 601. The Regional Director has indicated that Respondent has reviewed and documented
the date of qualification of the nineteen individuals referenced in Item 3. Since compliance has
been achieved with respect to this violation, it is unnecessary to include compliance terms in this
Order.
Under 49 C.F.R. 190.2 15, Respondent has a right to submit a petition for reconsideration of
this Final Order. Should Respondent elect to do so, the petition must be received within 20 days
of Respondent's receipt of this Final Order and must contain a brief statement of the issue(s).
The filing of a petition automatically stays the payment of any civil penalty assessed. All other
terms of this Final Order, including any required corrective action, remain in full effect unless
the Associate Administrator, upon request, grants a stay. The terms and conditions of this Final
Order are effective on receipt.
OCT 1 2 2036
Date Issued
A in Associate Administrator
for ipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320055024>
- Source ID: `phmsa-enforcement`
- SHA-256: `25a93392c17fa674238ee6fca4f5b302b55391c73e0b693dac8458b41d8a234e`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T13:15:19.150Z
- Document slug: `phmsa-enforcement-320055024`

### Source metadata

```json
{
  "cpf": "320055024",
  "operator": "WOLVERINE PIPELINE CO",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.505",
    "195.505(b)",
    "195.507(a)(3)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "320055024_Final Order_10122006.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320055024/320055024_Final%20Order_10122006.pdf",
      "bytes": 188895,
      "category": "agency_document"
    },
    {
      "name": "CPF_NO_3-2005-5024.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320055024/CPF_NO_3-2005-5024.pdf",
      "bytes": 188895,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "WOLVERINE PIPELINE CO"
}
```