**Published:** 2007-10-10

CLOSED warning letter citing 195.402(a), 195.402(e), 195.404(b)(1), 195.428(a), 195.579(b), 195.583(a).

## Document text

Warning Letter involving JAYHAWK PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(e),  195.404(b)(1),  195.428(a),  195.579(b),  195.583(a). The case was opened on 2007-10-10 and is reported as closed as of 2007-10-10. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320075028W_Warning_Letter_10102007.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320075028W/320075028W_Warning_Letter_10102007.pdf

320075028W_Warning_Letter_10102007_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320075028W/320075028W_Warning_Letter_10102007_text.pdf

320075028W_Warning_Letter_10102007_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 10, 2007
Mr. Myron Hoover
Jayhawk Pipeline LLC
2000 South Main
McPherson, Kansas 67460
CPF 3-2007-5028W
Dear Mr. Hoover:
On April 4-8, April 11-15, April 25-29, and May 9-13, 2005, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United
States Code inspected your pipeline facilities in Kansas, Oklahoma, Nebraska, and Texas.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the
probable violation(s) are:
1. §195.402(a) Procedural manual for operations, maintenance, and emergencies.
General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies.
§402(c)(10) Abandonment of Facilities. Jayhawk did not follow its O&M
Procedure Section 205, “Abandonment of Pipeline Facilities.
” You did not document
that the following pipeline segments were abandoned by safely disconnecting from the
operating pipeline system, purging of combustibles, and sealing, if left in place, to
minimize safety and environmental hazards.
a. Susank, KS to Buhler Junction, KS 8"
b. Inman Junction, KS to McPherson, KS 6"
c. Chase, KS to Hollow Junction, KS 8" (except for 15 miles of p/l from
Walsten Junction to Buhler Junction)



d. Hollow Junction, KS to Valley Center, KS 6"
e. Valley Center, KS to Augusta, KS 8" & 10"
f. Valley Center, KS to Ponca City, OK 8"
g. Walsten Junction, KS to Valley Center, KS 10"
2. §195.402(a) Procedural manual for operations, maintenance, and emergencies.
General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies.
§195.402 (d) Abnormal operation. Jayhawk did not follow its O&M procedure Section
300, “Abnormal Operating Conditions”. Jayhawk did not have a record indicating their
response, investigation, and correction of the cause of the abnormal operation condition
that occurred at Taloga Pump Station on 11/25/02. During a review of the 2002
overpressure protection inspection records for the Taloga Pump Station, a recalibration
record was found that stated ”recalibration after Operator’s reports of failure of unit
shutdown.” There was no documentation of an investigation following the malfunction
of the overpressure device.
3. §195.402(a) Procedural manual for operations, maintenance, and emergencies.
General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies.
§195.402 (e) Emergencies. Jayhawk did not follow its O&M procedure Section 400,
“Emergency Operations.” Jayhawk did not conduct a post accident review of their
employees’ activities to determine the effectiveness of their procedures after the fire on
February 11, 2004, at Holdrege, NE Pump Station.
4. §195.404 Maps and Records.
(b) Each operator shall maintain for at least 3 years daily operating records
that indicate-
(1) The discharge pressure at each pump station; and
Jayhawk did not provide a means to capture the daily discharge pressure at the following
pump stations:
1 - Wilburton Injection Pump
2 - Hudson Injection
3 - Frees Injection
4 - McPherson Injection
5 - Schurr (10" to Chase) Pump
As a result of this inspection, Chart Recorders were installed at all locations by the end
of July 2005.
2



5. §195.428 Overpressure safety devices and overfill protection systems
(a) Except as provided in paragraph (b) of this section, each operator shall, at
intervals not exceeding 15 months, but at least once each calendar year, or
in the case of pipelines used to carry highly volatile liquids, at intervals not
to exceed 7½ months, but at least twice each calendar year, inspect and
test each pressure limiting device, relief valve, pressure regulator, or other
item of pressure control equipment to determine that it is functioning
properly, is in good mechanical condition, and is adequate from the
standpoint of capacity and reliability of operation for the service in which
it is used.
(d) After October 2, 2000, the requirements of paragraphs (a) and (b) of this
section for inspection and testing of pressure control equipment apply to
the inspection and testing of overfill protection systems.
Jayhawk has not been inspecting and testing their breakout tanks’ overfill protection
alarm system at intervals not to exceed 15 months, but at least once each calendar year
for the following locations:
Chase, KS 12 Breakout Tanks
Liberal, KS 11 Breakout Tanks
Wichita, KS 9 Breakout Tanks
As a result of this inspection, Jayhawk started inspecting overfill protection systems on
June 2005
6. §195.579 What must I do to mitigate internal corrosion?
(b) Inhibitors. If you use corrosion inhibitors to mitigate internal corrosion,
you must--
(3) Examine the coupons or other monitoring equipment at least twice
each calendar year, but with intervals not exceeding 7 1/2 months.
Jayhawk did not examine the coupon at the Interstate Station to monitor for internal
corrosion at least twice each calendar year, or with intervals not exceeding 7 ½ months.
Jayhawk’s maintenance crew removed the coupon holder at Interstate Station during
maintenance and failed to replace the coupon holder. Jayhawk’s last coupon inspection
at Interstate was on 04/08/2003. Jayhawk missed the second required inspection in
2003, both required inspection in 2004, and the first required inspection in 2005. A
total of 4 inspections were missed. As a result of this inspection, the coupon holder was
replaced.
7. §195.583 What must I do to monitor atmospheric corrosion control?
(a) You must inspect each pipeline or portion of pipeline that is exposed to the
atmosphere for evidence of atmospheric corrosion, as follows:
3



If the pipeline is located: Then the frequency of inspection is:
Onshore
At least once every 3 calendar years, but
with intervals not exceeding 39 months
Jayhawk did not inspect each pipeline or portion of pipeline that was exposed to the
atmosphere. Inspections were not performed on 1 span in the Chase area and 31 pump
stations for evidence of atmospheric corrosion. See attached spreadsheet labeled
“Atmospheric Corrosion Inspection Requirements Not Met.”
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed
$100,000 for each violation for each day the violation persists up to a maximum of $1,000,000
for any related series of violations. We have reviewed the circumstances and supporting
documents involved in this case, and have decided not to conduct additional enforcement action
or penalty assessment proceedings at this time. We advise you to correct the item(s) identified
in this letter. Failure to do so will result in Jayhawk Pipeline LLC being subject to additional
enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 3-2007-5028W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
In addition, our representative noted that Jayhawk did not follow their procedure which
requires a drill that exercises the entire response plan for each response zone, be conducted at
least once every 3 years. The last OPA 90 drill where Jayhawk’s Oil Spill Removal
Organization (OSRO) was used and booms were deployed was in 1998 on the Little Arkansas
River. After PHMSA’s inspection, Jayhawk completed a spill drill with their OSRO and full
deployment of booms on July 27, 2005. We hope you will consider this area of concern as an
opportunity to improve your existing pipeline safety program.
Sincerely,
Ivan A. Huntoon
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
4

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320075028W>
- Source ID: `phmsa-enforcement`
- SHA-256: `8bcd47b4cddc9e3355859ddb65861422810076e1727fc6d542f0173cdb9b5ff7`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T16:22:05.169Z
- Document slug: `phmsa-enforcement-320075028w`

### Source metadata

```json
{
  "cpf": "320075028W",
  "operator": "JAYHAWK PIPELINE LLC",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(a)",
    "195.402(e)",
    "195.404(b)(1)",
    "195.428(a)",
    "195.579(b)",
    "195.583(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "320075028W_Warning_Letter_10102007.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320075028W/320075028W_Warning_Letter_10102007.pdf",
      "bytes": 190603,
      "category": "agency_document"
    },
    {
      "name": "320075028W_Warning_Letter_10102007_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320075028W/320075028W_Warning_Letter_10102007_text.pdf",
      "bytes": 26201,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "JAYHAWK PIPELINE LLC"
}
```