# GREAT PLAINS NATURAL GAS CO — Warning Letter

**Citation:** CPF 320091006W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2009-04-22

CLOSED warning letter citing 192.911(k), 192.911(l), 192.921(a).

## Document text

Warning Letter involving GREAT PLAINS NATURAL GAS CO. PHMSA's enforcement data identifies the cited regulations as 192.911(k),  192.911(l),  192.921(a). The case was opened on 2009-04-22 and is reported as closed as of 2009-04-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320091006W_Warning Letter_04222009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091006W/320091006W_Warning%20Letter_04222009.pdf

320091006W_Warning Letter_04222009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320091006W/320091006W_Warning%20Letter_04222009_text.pdf

320091006W_Warning Letter_04222009_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 22, 2009
Mr. Jay Skabo, Vice President, Operations
Montana Dakota Utilities Company/
Great Plains Natural Gas Company
400 North Fourth Street
Bismarck, ND 58501-4092
CPF 3-2009-1006W
Dear Mr. Skabo:
On June 18-22, 2007, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) and Minnesota Office of Pipeline Safety pursuant to Chapter 601 of
49 United States Code inspected the Great Plains Natural Gas (GPNG) integrity management
(IM) plan and procedures in Fergus Falls, Minnesota.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violations are:
§192.911 What are the elements of an integrity management program?
An operator's initial integrity management program begins with a framework (see
§192.907) and evolves into a more detailed and comprehensive integrity management
program, as information is gained and incorporated into the program. An operator must
make continual improvements to its program. The initial program framework and
subsequent program must, at minimum, contain the following elements. (When
indicated, refer to ASME/ANSI B31.8S (ibr, see §192.7) for more detailed information
on the listed element.)
1. §192.911(b) A baseline assessment plan meeting the requirements of §192.919 and
§192.921.



Item 1A: §192.921(a) Assessment methods. An operator must assess the integrity
of the line pipe in each covered segment by applying one or more of the following
methods depending on the threats to which the covered segment is susceptible. An
operator must select the method or methods best suited to address the threats
identified to the covered segment (See §192.917).
The GPNG integrity management program (IMP) plan, Section 4, indicates baseline
assessments will be completed on each identified high consequence area (HCA) no
later than October 31, 2006 and, in addition, lists what the baseline assessment plan
must include; but a baseline assessment plan was not prepared.
2. §192.911(k) A management of change process as outlined in ASME/ANSI B31.8S,
section 11.
Item 2A: ASME/ANSI B31.8S Section 11(d) Management of change ensures that
the integrity management process remains viable and effective as changes to the
system occur and/or new, revised, or corrected data becomes available. Any
change to equipment or procedures has the potential to affect pipeline integrity.
Most changes, however small, will have a consequent effect on another aspect of
the system. For example, many equipment changes will require a corresponding
technical or procedural change. All changes shall be identified and reviewed
before implementation. Management of change procedures provides a means of
maintaining order during periods of change in the system and helps to preserve
confidence in the integrity of the pipeline.
GPNG’s plan concerning management of change requirements was not followed. A
new interconnect to serve an ethanol plant off of MN Highway 210, west of Fergus
Falls, was not reviewed for potential IMP impacts prior to installation.
3. §192.911(l) A quality assurance process as outlined in ASME/ANSI B31.8S,
section 12.
Item 3A: ASME/ANSI B31.8S Section 12.2(b)(3) Results of the integrity
management program and the quality control program shall be reviewed at
predetermined intervals, making recommendations for improvement.
No annual review or 3-year evaluation of the GPNG plan was conducted, as required
by Section 13 of the GPNG plan. No documentation of the reviews was made
available to the PHMSA inspection team.
Under 49 United States Code, §60122, you are subject to a civil penalty not to exceed
$100,000 for each violation for each day the violation persists up to a maximum of $1,000,000
for any related series of violations. We have reviewed the circumstances and supporting
documents involved in this case, and have decided not to conduct additional enforcement
2



action or penalty assessment proceedings at this time. We advise you to correct the items
identified in this letter. Be advised that failure to do so will result in GPNG being subject to
additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 3-2009-1006W.
Sincerely,
Ivan A. Huntoon
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
3

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320091006W>
- Source ID: `phmsa-enforcement`
- SHA-256: `be0851e61e17f0669ac9b765be73caa6e9d4f14fda0b81d15a9a3132cec9abbe`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T02:51:07.368Z
- Document slug: `phmsa-enforcement-320091006w`

### Source metadata

```json
{
  "cpf": "320091006W",
  "operator": "GREAT PLAINS NATURAL GAS CO",
  "region": "Central",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.911(k)",
    "192.911(l)",
    "192.921(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "320091006W_Warning Letter_04222009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320091006W/320091006W_Warning%20Letter_04222009.pdf",
      "bytes": 144213,
      "category": "agency_document"
    },
    {
      "name": "320091006W_Warning Letter_04222009_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320091006W/320091006W_Warning%20Letter_04222009_text.pdf",
      "bytes": 17308,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "GREAT PLAINS NATURAL GAS CO"
}
```